HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1968-2025
Submission Date : 03-06-2025 11:29:36 AM
Applicant Type : Company
Project Type: ONGOING




INDIABULLS NESTS LIMITED
A-2, FIRST FLOOR, KIRTI NAGAR, NEW DELHI - 110015
0956076111
0956076111 (Number Shared by Promoter in Public)
ankur.a@indiabullsestate.com
http://dhani.com
XXXX900N
U68200DL2009PLC191143
 
 


 
 


 
 


 
 


 
 







INDIABULLS HEIGHTS
SECTOR 104, VILLAGE DHANWAPUR & GURUGRAM, HARYANA
GURGAON
GURUGRAM
0991000548 (Number Shared by Promoter in Public)
luxurysales@dhani.com
INDRESH MATTA
0991000548
0991000548 (Number Shared by Promoter in Public)
matta.indresh@indiabullsestate.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
11826929-05-202550000HDFC BANKHRERA Gurugram







4.18 (Acre)
300
66.28
34.0229 (Acre)
246 of 2007 (28.10.2029), 56 of 2011 (22.06.2029), 37 of 2012 (21.04.2030), 66 of 2012 (20.06.2025), 67 of 2012 (20.06.2025), 43 of 2014 (15.06.2029), 44 of 2014 (15.06.2029)
No
Address     5 FLOOR PLOT NO 108 IT PARK UDYOG VIHAR PHASE I INDUSTRIAL COMPLEX DUNDAHERA GURGAON 122016 HARYANA
Address     5 FLOOR PLOT NO 108 IT PARK UDYOG VIHAR PHASE I INDUSTRIAL COMPLEX DUNDAHERA GURGAON 122016 HARYANA
Annexure-B- JOINT DEVELOPMENT AGREEMENT
JOINT DEVELOPMENT AGREEMENT AFTER THE GRANT OF THE LICENSE
Yes
JOINT DEVELOPMENT AGREEMENT ENCLOSED
No
Yes
Yes







104276.34 Lakhs
1422.34 Lakhs
74619 Lakhs
5867 Lakhs
22368 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1.156
3CONSTRUCTION OF ROADS 1.422
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0.583
6GREEN BELTS 0
7VEHICLE PARKINGS 0.320
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0.347
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0.352
Total4.18




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSDTCPNo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS198.85AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM322.61AS PER PROJECT REPORT
3STORM WATER DRAINAGE78.47AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM500AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL243.18AS PER PROJECT REPORT
6STREET LIGHTING12.87AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING840AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS10.89AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE1000AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM20AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY614AS PER PROJECT REPORT
14ANY OTHER224AS PER PROJECT REPORT
15UNDERGROUND WATER TANK82AS PER PROJECT REPORT
16RAIN WATER HARVESTING 48AS PER PROJECT REPORT
17ELECTRICAL SUB STATION 200AS PER PROJECT REPORT
18CONSTRUCTION OF CIRCULATION ROAD AS PER CONDITIONS OF LICENSE219AS PER PROJECT REPORT


27-03-2025 (date)
27-03-2025 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK+S APARTMENT- TYPE 1 81.9405 152 12454.956 0 152 2
2 APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK+S APARTMENT- TYPE 2 97.54819 3 292.64457 0 3 1
3 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK APARTMENT- TYPE 1 102.1933 80 8175.464 0 80 1
4 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+S APARTMENT- TYPE 1 116.9649 84 9825.0516 0 84 2
5 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+S APARTMENT- TYPE 2 123.3752 80 9870.016 0 80 1
6 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+S APARTMENT- TYPE 3 124.3972 3 373.1916 0 3 1
7 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+S APARTMENT- TYPE 4 124.3972 74 9205.3928 0 74 1
8 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+S+T APARTMENT- TYPE 1 116.9649 6 701.7894 0 6 2
9 APARTMENT/SHOPS/OTHER BUILDINGS Type 3BHK+SP APARTMENT- TYPE 1 121.703 62 7545.586 0 62 2
10 APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+S APARTMENT- TYPE 1 149.6668 40 5986.672 0 40 1
11 APARTMENT/SHOPS/OTHER BUILDINGS Type 4BHK+S APARTMENT- TYPE 2 151.3391 40 6053.564 0 40 1
12 APARTMENT/SHOPS/OTHER BUILDINGS Type DISPENSARY-TYPE 1 1730.2262 1 1730.2262 0 1 0
Total62572214.55417062515






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
00


01-05-2025
30-04-2022
21-03-2030
01-05-2025
0
21-03-2030
PROVIDED
AS PER PERT CHART


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
01-05-2025
0
21-03-2030
PROVIDED
AS PER PERT CHART


625
0
27
99
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1.5
Shops0
Plots0

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments20305050
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments50555560
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments60605050
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments50502520
Shops0000
Plots0000

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments9.7
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0001
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0.700.700.701.30
Shopping area0000
Other0000
Underground Water Tank0.150.15
Rainwater Harvesting0.160.16
Electrical Sub Station0.300.30
Hospital Dispensary0.501.00
Park and Services Area Basements NTA Areas1.50
Parking and Services Area Basements NTA Areas2
Security and Firefighting1

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0.500.500.500.50
Water Supply System0.810.810.810.81
Sewerage treatment & garbage disposal0.610.610.610.61
Electricity Supply System1.001.001.001.00
Storm Water Drainage0.260.260.260
Parks and Playgrounds00.050.050
Clubhouse/community centres1.502.001.501.00
Shopping area0000
Other0.560.560.560.56
security and firefighting1.502.502.500.90
Street Lighting0.030.030.03
Rainwater Harvesting0.080.080
electrical sub station0.700.300.200.20
construction of circulation road0.550.550.55
renewable energy system0.070.070.07
hospital dispensary1.301.101.201.04
Parking and services area basements NTA Areas2.50
underground water tank0.150.150.150.07
parking and services area basements NTA areas2.002.00
parking and services area basement NTA areas1.53

ParticularsYear-2030
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0.60
Shopping area0
Other0
parking and services area basements NTA areas1.00
construction of circulation road0.55
Street Lighting0.03












Particulars Remarks, if any
i. No. of Flats/Apartments constructed0
ii. No. of Flats/ Apartments booked0
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter0 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter0 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter0 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 Lakhs
vii. Amount invested in the project upto the date of application0 Lakhs
Land cost (If any)1422.34 Lakhs
Apartments74619 Lakhs
Infrastructure5867 Lakhs
EDC/ Taxes Etc.22368 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession0 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS198.850
II. WATER SUPPLY SYSTEM322.610
III. STORM WATER DRAINAGE78.470
IV. ELECTRICITY SUPPLY SYSTEM5000
V. SEWAGE TREATMENT & GARBAGE DISPOSAL243.180
VI. CLUB HOUSE/COMMUNITY CENTRE10000
VII. SCHOOL00
VIII. ANY OTHER7930
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.10.890
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM8400
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
No
HDFC BANK LIMITED, B-1, VANIJYA KUNJ, ENKAY TOWER, UDYOG VIHAR, PHASE V, GURGAON, HARYANA - 122001
99999999980795
HDFC0000485
110240077
0485
1. Mr. Saurabh Garg 2. Mr. Akhil Malhotra 3. Mr. Basudev Panda 4. Mr. Love Paliwal
Annexed











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. NOC FROM AAIALREADY BEEN OBTAINED19-02-2022
II. ZONING PLANALREADY BEEN OBTAINED21-09-2020
III. ELECTRICITY LOAD APPROVALALREADY BEEN OBTAINED27-10-2023
IV. BUILDING PLAN AND SITE PLANALREADY BEEN OBTAINED27-03-2025
V. PHASING PLANALREADY BEEN OBTAINED24-09-2024
VI. FOREST NOCALREADY BEEN OBTAINED11-03-2014
VII. ARAVALI NOCALREADY BEEN OBTAINED04-04-2014
VIII. SEWERAGE NOCALREADY BEEN OBTAINED28-08-2024
IX. STROM WATER DRAINGE NOCALREADY BEEN OBTAINED28-08-2024
X. CONSTRUCTION WATER NOCALREADY BEEN OBTAINED27-08-2024








Yes


Yes


Agreement Enclosed













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEMARBLE/ENGINEERED STONE/ VITRIFIED TILES OR EQUIVALENT
2WALL FINISHING DETAILSACRYLIC EMULSION PAINT OR EQUIVALENT
3KITCHEN DETAILSFLOOR – VITRIFIED TILES OR EQUIVALENT WALLS - COMBINATION OF VITRIFIED TILES & ACRYLIC EMULSION CEILING - ACRYLIC EMULSION PAINT
4BATHROOM FITTINGSCHINAWARE WITH CP FITTINGS
5WOOD WORK ETCLAMINATE FINISH FLUSH DOORS/MOLDED SHUTTER WITH WOODEN FRAME -PREHUNG- LEVEL WITH LAMINATE
6DOORS AND WINDOS FRAMESDOORS- LAMINATE FINISH FLUSH DOORS/MOLDED SHUTTER WITH WOODEN FRAME -PREHUNG- LEVEL WITH LAMINATE WINDOWS-POWDER COATED ALUMINUM / UPVC FRAMES WITH GLASS
7GLASS WORK4MM & ABOVE AS PER SPECIFICATION
8ELECTRIC FITTINGSAS PER BUILDING NORMS
9CONDUCTING AND WIRING DETAILSPVC CONDUCTING WITH COPPER WIRING
10CUPBOARD DETAILSNA
11WATER STORAGEUNDERGROUND WATER TANK & OVERHEAD WATER TANK
12LIFT DETAILS5 LIFTS IN EACH TOWER 4 PASSENGER AND 1 SERVICE
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSPOWDER COATED ALUMINUM / UPVC FRAMES WITH GLASS
14DOORSNA
14.1MAIN DOORSHARD WORD FRAME & VENEERED FLUSH DOOR
14.2INTERNAL DOORSLAMINATE FINISH FLUSH DOORS/MOLDED SHUTTER WITH WOODEN FRAME -PREHUNG- LEVEL WITH LAMINATE
15AIR CONDITIONINGVRV HOT AND COLD IN APARTMENT
16ELECTRICAL FITTINGSAS PER BUILDING NORMS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYYES PROVISION IS THERE
19EXTERNAL FINISHING/COLOUR SCHEMETBD
20INTERNAL FINISHINGCEMENT/ GYPSUM PLASTER/ ACRYLIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE/ ENGINEERED STONE OR EQUIVALENT
1 . 2 WALLSACRYLIC EMULSION PAINT ON POP PUNNING WITH GYPSUM PLASTER
1 . 3 CEILINGACRYLIC EMULSION PAINT WITH GYPSUM PLASTER
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORWOODEN FLOORING ., MARBLE, ENGINEERED STONE OR EQUIVALENT
2 . 2 WALLSACRYLIC EMULSION PAINT ON POP PUNNING WITH GYPSUM PLASTER
2 . 3 CEILINGACRYLIC EMULSION PAINT WITH GYPSUM PLASTER
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORMARBLE/ENGINEERED STONE/ VITRIFIED TILE OR EQUIVALENT
3 . 2 WALLSCOMBINATION OF STONE/TILES & ACRYLIC EMULSION PAINT, GLAZED VITRIFIED TILES
3 . 3 CEILINGACRYLIC EMULSION PAINT OR EQUIVALENT
3 . 4 COUNTERSMARBLE/ GRANITE/ENGINEERED STONE OR EQUIVALENT
3 . 5 SANITARY WARE/CP FITTINGSSTANDARD BRANDS FITTINGS
3 . 6 FITTING/FIXTURESSHOWER PARTITION, MIRROR,
4 . BED ROOMS
4 . 1 FLOORENGINEERED STONE / VITRIFIED TILE OR EQUIVALENT
4 . 2 WALLSACRYLIC EMULSION PAINT ON POP PUNNING WITH GYPSUM PLASTER
4 . 3 CEILINGACRYLIC EMULSION PAINT WITH GYPSUM PLASTER
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORENGINEERED STONE/ ANTI SLIP VITRIFIED TILES OR EQUIVALENT
5 . 2 WALLSCOMBINATION OF STONE/TILES & ACRYLIC EMULSION PAINT / GLAZED VITRIFIED [POIUFDXZ TILES
5 . 3 CEILINGACRYLIC EMULSION PAINT OR EQUIVALENT
5 . 4 COUNTERSMARBLE/ GRANITE/ENGINEERED STONE OR EQUIVALENT
5 . 5 SANITARY WARE/CP FITTINGSSTANDARD BRANDS FITTINGS
5 . 6 FIXTURESSHOWER PARTITION, MIRROR
6 . KITCHEN
6 . 1 FLOORMARBLE / ENGINEERED STONE / VITRIFIED TILE OR EQUIVALENT
6 . 2 WALLSCOMBINATION OF VITRIFIED TILES & ACRYLIC EMULSION
6 . 3 CEILINGACRYLIC EMULSION PAINT WITH GYPSUM PLASTER
6 . 4 COUNTERSGRANITE/ENGINEERED STONE COUNTER TOP OR EQUIVALENT / CERAMIC TILES ABOVE COUNTER
6 . 5 FIXTURESMODULAR KITCHEN
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVITRIFIED TILES OR EQUIVALENT
7 . 2 WALLS & CEILINGACRYLIC EMULSION PAINT OR EQUIVALENT
7 . 3 TOILETANTI-SKID VITRIFIED TILES OR EQUIVALENT
7 . 4 BALCONYVITRIFIED TILES OR EQUIVALENT
8 . SIT-OUTS
8 . 1 FLOORANTI-SKID VITRIFIED TILES OR EQUIVALENT
8 . 2 WALLS & CEILINGACRYLIC EMULSION PAINT OR EQUIVALENT
8 . 3 RAILINGSCOMBINATION OF MS STEEL AND GLASS
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 29-05-2025 View Document
2 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 28-05-2025 View Document
3 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 28-05-2025 View Document
4 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 28-05-2025 View Document
5 ZONING PLAN 28-05-2025 View Document
6 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 29-05-2025 View Document
7 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 28-05-2025 View Document
8 DEMARCATION PLAN 28-05-2025 View Document
9 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 28-05-2025 View Document
10 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 29-05-2025 View Document
11 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 02-06-2025 View Document
12 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 02-06-2025 View Document