HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1912-2025
Submission Date : 15-04-2025 03:14:33 PM
Applicant Type : Company
Project Type: ONGOING




M/S DLF LIMITED
DLF SHOPPING MALL, 3RD FLOOR, ARJUN MARG, DLF CITY, PHASE-I, GURUGRAM-122002, HARYANA (INDIA)
1244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
https://www.dlf.in
XXXX494N
L70101HR1963PLC002484
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







SUMMIT PLAZA
DLF CITY PHASE V, SECTOR 54, GURUGRAM, HARYANA
GURGAON
GURUGRAM
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
MR NARESH GUPTA
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques/Online Banking:-

Drafts/ Banker’s Cheques

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
152467511-04-20255000ICICI BANK LIMITEDHRERA Gurugram
252478611-04-2025295473ICICI BANK LIMITEDHRERA Gurugram
351910203-07-20212021341ICICI BANK LIMITEDHRERA Gurugram

Online Banking








2.65 (Acre)
2.83
2.77
2.65 (Acre)
License granted from DTCP
Yes







35921.00 Lakhs
1209.11 Lakhs
31545.09 Lakhs
740.91 Lakhs
2426 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 1.5
3CONSTRUCTION OF ROADS 0.74
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0.41
Total2.65




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSCONCERNED AUTHORITYNo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS107.79AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM28.98AS PER PROJECT REPORT
3STORM WATER DRAINAGE22.95AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM106.75AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL72.16AS PER PROJECT REPORT
6STREET LIGHTING36.65AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING99.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM30.43AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15PARKING89.40AS PER PROJECT REPORT
16UNDERGROUND WATER TANK30AS PER PROJECT REPORT
17RAIN WATER HARVESTING116.8AS PER PROJECT REPORT


14-01-2025 (date)
14-01-2025 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 APARTMENT/SHOPS/OTHER BUILDINGS Type RETAIL 12866.4 282 3628324.8 45 237 1
2 APARTMENT/SHOPS/OTHER BUILDINGS Type F&B 1751.8 3 5255.4 0 3 0
3 APARTMENT/SHOPS/OTHER BUILDINGS Type CINEMA 1145.5 2 2291 0 2 0
4 APARTMENT/SHOPS/OTHER BUILDINGS Type WELLNESS 1180.0 1 1180 0 1 0
5 APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE 3597.6 4 14390.4 0 4 0
Total2923651441.6452471






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
RETAIL45UNDER CONSTRUCTION


21-08-2021
30-06-2026
30-06-2026
01-12-2022
38
30-06-2026
ATTACHED
ATTACHED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
01-12-2022
38
31-12-2025
ATTACHED
ATTACHED


442
0
0
0
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops3728.183728.183590.102761.61
Plots0000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System13.88
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Parkings77.78
Rainwater harvesting0
Renewable energy system0
Security and firefighting0
Street lighting0
Underground water tank30

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements21.5632.3432.3421.56
Water Supply System8.697.257.255.8
Sewerage treatment & garbage disposal21.6518.0418.0414.43
Electricity Supply System21.3532.0221.3518.15
Storm Water Drainage6.896.894.594.59
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Parking4.474.472.680
Street lighting0018.3318.33
Rainwater harvesting58.435.0423.360
Renewable energy system3.049.139.139.13
Underground water tank0000
Security and firefighting29.724.7524.7519.8








Cash Flow in each quarter (In Lakhs)












Particulars Remarks, if any
i. No. of Flats/Apartments constructed292
ii. No. of Flats/ Apartments booked45
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter10624.56 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter5295.80 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter5328.76 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter474.93 Lakhs
vii. Amount invested in the project upto the date of application21156 Lakhs
Land cost (If any)1209.11 Lakhs
Apartments17737.02 Lakhs
Infrastructure121.68 Lakhs
EDC/ Taxes Etc.2087.95 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession14765 Lakhs
(a) In respect of existing allottees14765 Lakhs
(b) In respect of rest of the project14765 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 LakhsNA
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 LakhsNA



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS107.790
II. WATER SUPPLY SYSTEM28.980
III. STORM WATER DRAINAGE22.950
IV. ELECTRICITY SUPPLY SYSTEM106.7514.35
V. SEWAGE TREATMENT & GARBAGE DISPOSAL72.160
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER213.8830
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING89.4077.33
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM990
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
No
Account Details
ICICI BANK, 9A, PHELPS BUILDING, CONNAUGHT PLACE, NEW DELHI - 110001
000705051216
ICIC0000007
110229002
0007
Mr. Puneet Rakheja
Yes











No
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. NOC FROM HEIGHT CLEARANCEALREADY BEEN OBTAINED13-04-2020
II. FOREST CLEARANCEALREADY BEEN OBTAINED04-11-2020
III. ASSURANCE FROM DHBVNALREADY BEEN OBTAINED20-11-2020
IV. APPROVAL OF FIRE FIGHTING SCHEMEALREADY BEEN OBTAINED16-04-2025
V. SERVICE PLAN ESTIMATEALREADY BEEN OBTAINED16-07-2025
VI. ASSURANCE FOR WATER SUPPLYALREADY BEEN OBTAINED03-08-2021
VII. ASSURANCE FOR STORM WATER CONNECTION ALREADY BEEN OBTAINED02-08-2021
VIII. ASSURANCE FOR SEWERAGE CONNECTIONALREADY BEEN OBTAINED08-05-2025
IX. LICENSE 54,55,56 OF 1996ALREADY BEEN OBTAINED01-08-2024
X. LICENSE 115,116 OF 1995ALREADY BEEN OBTAINED18-12-2024
XI. BR-IIIALREADY BEEN OBTAINED14-01-2025
XII. ZONING PLANALREADY BEEN OBTAINED12-10-2020
XIII. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINED12-11-2021
XIV. CONSENT TO ESTABLISHALREADY BEEN OBTAINED24-12-2021








Yes


Yes


As per RERA Act







GARDENCITY ARCADE, GURGAON
1.42
99
1
99
1
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6309.196223.004950.19
Cost of the apartments4162.284667.003709.83
Cost of the infrastructure000
Others costs2146.911556.001240.36


6935.16 Lakhs
2537.40 Lakhs
0 Lakhs
5881.00 Lakhs
No
29-04-2025
29-04-2025




DLF GARDENCITY ENCLAVE, GURGAON
26.91875
0
119
0
119
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11999.005197.002705.91
Cost of the apartments4738.003241.001240.00
Cost of the infrastructure0.000.000.00
Others costs7261.001956.001465.91


11164.63 Lakhs
2648.09 Lakhs
0 Lakhs
2871.84 Lakhs
No
28-03-2025
28-03-2025




INDEPENDENT FLOORS AT DLFGARDENCITY ENCLAVE, GURGAON
3.5698
388
97
388
97
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
23468.0028926.0016618.59
Cost of the apartments18345.0026614.0015086.26
Cost of the infrastructure1367.0000
Others costs3756.002312.001532.33


20622.65 Lakhs
34805.50 Lakhs
0 Lakhs
17409.39 Lakhs
No
19-08-2027
19-08-2027




DLF GARDENCITY ENCLAVE PH2
5.0105
544
136
536
134
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
40606.0038844.0014802.81
Cost of the apartments33892.0036030.0012671.98
Cost of the infrastructure0.000.000.00
Others costs6714.002814.002130.83


31080.10 Lakhs
54192.41 Lakhs
0 Lakhs
15967.74 Lakhs
No
30-10-2028
30-10-2028




THE GROVE DLF 5, SECTOR-54,GURU
5.3073
292
73
292
73
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
47346.1754350.0035593.00
Cost of the apartments38532.0952478.0034143.00
Cost of the infrastructure0.000.000.00
Others costs8814.081872.001450.00


143502.00 Lakhs
133888.48 Lakhs
0 Lakhs
54829.00 Lakhs
No
31-12-2025
31-12-2025




DLF PRIVANA SOUTH, SECTOR-77, GURGAON
25.148
1113
0
1113
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
341550.09347582.0032873.54
Cost of the apartments319728.99313993.0017001.18
Cost of the infrastructure0.000.000.00
Others costs21821.1033589.0015872.36


257431.00 Lakhs
668186.28 Lakhs
0 Lakhs
43659.00 Lakhs
No
30-06-2031
30-06-2031




DLF PRIVANA WEST, SECTOR-77, GURGAON
12.572
795
0
795
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
279300.00258243.0023910.00
Cost of the apartments252089.00230077.0012573.00
Cost of the infrastructure000
Others costs27211.0028166.0011337.00


146569.00 Lakhs
507573.69 Lakhs
0 Lakhs
30503.00 Lakhs
No
31-12-2031
31-12-2031




DLF CLUB ARCADE, SECTOR 91
0.89
72
0
49
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
4427.004549.28190.75
Cost of the apartments2575.002704.50181.70
Cost of the infrastructure000
Others costs155.001844.789.05


580.86 Lakhs
4642.86 Lakhs
0 Lakhs
191.00 Lakhs
No
31-03-2028
31-03-2028




THE DAHLIAS, SECTOR-54, GURGAON
16.489
420
0
173
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
613342.00624154.0024368.00
Cost of the apartments608353.00619144.0019635.00
Cost of the infrastructure000
Others costs4989.005010.004733.00


132959.00 Lakhs
1227542.79 Lakhs
0 Lakhs
28799.00 Lakhs
No
31-12-2031
31-12-2031










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSECOURTYARD - GRIT/PIGMENTED CONCRETE /MOSAIC /PAVERS /STONE/ TILES CORRIDORS - GRIT/PIGMENTED CONCRETE/ MOSAIC/ PAVERS/ STONE/ TILES LIFT LOBBY/ ENTRANCE LOBBY - STONE/ TILES SERVICE AREA /DRIVEWAY/ PASSAGES / PARKING AREA - STONE/ TILES/ BARE CONCRETE/ PU ON VDF/IPS WITH EPOXY STAIRCASE - STONE/ TILES TOILET - STONE/ TILES
2WALL FINISHING DETAILS"COURTYARD - SYNTHETIC WASHABLE PAINT/ EXTERIOR GRADE PAINT CORRIDORS - SYNTHETIC WASHABLE PAINT/ EXTERIOR GRADE PAINT LIFT LOBBY/ ENTRANCE LOBBY - ACRYLIC/SEMI ACRYLIC PAINT/ MATT & GLAZED CERAMIC TILE/ STONE/ LAMINATE SERVICE AREA / DRIVEWAY /PASSAGES / PARKING AREA- OBD/ WHITE-WASH/TILES/ENAMEL PAINT STAIRCASE- ACRYLIC/SEMI ACRYLIC PAINT/OBD"
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSMODULAR FITTINGS
9CONDUCTING AND WIRING DETAILSMS/PVC CONDUITS, AS PER BIS
10CUPBOARD DETAILSNA
11WATER STORAGEOHT & UGT WATER TANKS
12LIFT DETAILSBRANDED MAKE
13EXTERNAL GLAZINGSSHOP - NIL OFFICE - GLASS FACADE/PLASTERED
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSMODULAR FITTINGS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEGLAZING/ METAL WORK RAILING-MS/ GLASS/PLASTER
20INTERNAL FINISHINGSHOPS / CINEMA / RESTAURANT / OFFICE - INTERNAL FINISHES - BARE SHELL FLOORS - BARE CONCRETE WALLS/PARTITIONS - UNPLASTERED/UNPAINTED WALLS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNA
1 . 2 WALLSNA
1 . 3 CEILINGNA
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNA
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORNA
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORNA
5 . 2 WALLSNA
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORNA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 14-04-2025 View Document
2 4 BR-III SUMMIT PLAZA (2.65 ACRES DLF5) DT. 14.01.2025 25-07-2025 View Document
3 FOREST NOC 25-07-2025 View Document
4 DEMARCATION PLAN 25-07-2025 View Document
5 ZONING PLAN 25-07-2025 View Document
6 CONVEYANCE DEED 25-07-2025 View Document
7 STORM WATER DRAINAGE_SUMMIT PLAZA_SWD_31-07-2021 25-07-2025 View Document
8 SUMMIT PLAZA_ENVIRONMENTAL CLEARANCE 25-07-2025 View Document
9 APPLICATION FORM - SUMMIT PLAZA 080725 25-07-2025 View Document
10 CTE SUMMIT PLAZA 25-07-2025 View Document
11 STORM WATER DRAINAGE_SUMMIT PLAZA_SWD_31.07.2021 25-07-2025 View Document
12 ZONING PLAN 25-07-2025 View Document
13 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 25-07-2025 View Document
14 ASSURANCE LETTER GMDA WATER SUPPLY 25-07-2025 View Document
15 FOREST NOC 25-07-2025 View Document
16 PAYMENT- RECEIPT SUMMIT PLAZA 25-07-2025 View Document
17 AAI NOC_SUMMIT PLAZA 25-07-2025 View Document
18 REVSIED FIRE-FIGHTING SCHEME APPROVAL 25-07-2025 View Document
19 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 25-07-2025 View Document
20 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 25-07-2025 View Document
21 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 25-07-2025 View Document
22 5 AAI NOC_SUMMIT PLAZA 25-07-2025 View Document
23 TOD FOR COMMERCIAL SITE AREA 2.65 ACRES (ZONG PLAN) DT. 14.10.20 25-07-2025 View Document
24 ASSURANCE LETTER GMDA WATER SUPPLY 25-07-2025 View Document
25 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 25-07-2025 View Document
26 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 25-07-2025 View Document
27 REVISED SERVICE PLAN ESTIMATE APPROVAL 25-07-2025 View Document
28 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 25-07-2025 View Document
29 SUMMIT PLAZA LICENSES & RENEWAL 25-07-2025 View Document
30 CTE SUMMIT PLAZA 25-07-2025 View Document
31 SUMMIT PLAZA_ASSURANCE OF SEWERAGE CONNECTIONS 25-07-2025 View Document
32 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 25-07-2025 View Document
33 SUMMIT PLAZA_ENVIRONMENTAL CLEARANCE 25-07-2025 View Document
34 MINING APPROVAL 25-07-2025 View Document
35 ALLOTMENT LETTER -SUMMIT PLAZA 080725 25-07-2025 View Document
36 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 25-07-2025 View Document
37 SUMMIT PLAZA_ASSURANCE OF SEWERAGE CONNECTIONS 25-07-2025 View Document
38 REVSIED FIRE-FIGHTING SCHEME APPROVAL 25-07-2025 View Document
39 AGREEMENT FOR SALE- MODEL 25-07-2025 View Document