HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1911-2025
Submission Date : 27-03-2025 03:52:41 PM
Applicant Type : Company
Project Type: ONGOING




DLF HOME DEVELOPERS LIMITED
2ND FLOOR, ARJUN MARG, DLF SHOPPING MALL, DLF CITY, PHASE-L, GURGAON, HARYANA, INDIA, 122002
01244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
https://www.dlf.in/
XXXX037H
U74899HR1995PLC082458
 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 


 
 







THE ARBOUR
SECTOR 63, GURUGRAM, HARYANA-122102
BADSHAHPUR ST
GURUGRAM
1244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in
VIKAS LAKRA
1244769000
9711080232 (Number Shared by Promoter in Public)
haryanarera@dlf.in








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
152106909-08-20224878000ICICI BANKHRERA Gurugram
252157806-01-20238350000ICICI BANKHRERA Gurugram
330231110022723-01-202325000ICICI BANK- THROUGH RTGSHRERA Gurugram
458706931023-01-202310000ICICI BANK - THROUGH RTGSHRERA Gurugram
552461725-03-20255000ICICI BANKHRERA Gurugram
652464002-04-20253200000ICICI BANKHRERA Gurugram
75202504107254405710-04-202517612ICICI BANKHRERA Gurugram







25.087 (Acre)
3.15
3.14943
25.087 (Acre)
123 of 2012 (20.12.2012)
No
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE 1, GURUGRAM, HARYANA 122002
Address     2ND FLOOR, ARJUN MARG, DLF SHOPPING MALL, DLF CITY, PHASE-L, GURGAON, HARYANA, INDIA, 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE 1, GURUGRAM, HARYANA 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE 1, GURUGRAM, HARYANA 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE 1, GURUGRAM, HARYANA 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE 1, GURUGRAM, HARYANA 122002
Address     1ST FLOOR, SHOPPING MALL COMPLEX, ARJUN MARG, DLF PHASE 1, GURUGRAM, HARYANA 122002
Annexure-B- ANNEXURE-B- LICENSE HOLDER AND COLLABORATOR
BEFORE GRANT OF LICENSE
Yes
1. ARLIE BUILDERS & DEVELOPERS PVT. LTD. AND DLF HOME DEVELOPERS LIMITED (DA NO.-2799 DATED 08.06.2022) 2. AFAAF BUILDERS & DEVELOPERS PVT. LTD. AND DLF HOME DEVELOPERS LIMITED (DA NO.-2800 DATED 08.06.2022) 3. HOSHI BUILDERS & DEVELOPERS PRIVATE LIMITED AND DLF HOME DEVELOPERS LIMITED (DA NO.- 2795 DATED 08.06.2022) 4. MILDA BUILDWELL PVT. LTD. (ERSTWHILE BEYLA BUILDERS & DEVELOPERS PVT. LTD.) AND DLF HOME DEVELOPERS LIMITED (DA NO.- 2797 DATED 08.06.2022) 5. VAMIL BUILDERS & DEVELOPERS PRIVATE LIMITED AND DLF HOME DEVELOPERS LIMITED (DA NO.- 2798 DATED 08.06.2022) 6. ZANOBI BUILDERS & CONSTRUCTIONS PVT. LTD. AND DLF HOME DEVELOPERS LIMITED (DA NO.-2796 DATED 08.06.2022)
Yes
Yes
Yes







552663.14 Lakhs
31225.35 Lakhs
343005.02 Lakhs
10641.98 Lakhs
167790.79 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 2.68
3CONSTRUCTION OF ROADS 5.2
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 3.79
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 10.609
13AREA 0.09
14SCHOOLS 0.5
15OPEN 0.488
16EWS 0.39
17AREA 1.34
Total25.087




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGURUGRAM METROPOLITAN DEVELOPMENT AUTHORITYYes
WATER SUPPLYGURUGRAM METROPOLITAN DEVELOPMENT AUTHORITYYes
ELECTRICITYDAKSHIN HARYANA BIJLI VITRAN NIGAMYes
SEWAGE DISPOSALGURUGRAM METROPOLITAN DEVELOPMENT AUTHORITYYes
STORM WATER DRAINAGEGURUGRAM METROPOLITAN DEVELOPMENT AUTHORITYYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS855.78AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM846.74AS PER PROJECT REPORT
3STORM WATER DRAINAGE364.34AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM0AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL382.47AS PER PROJECT REPORT
6STREET LIGHTING114.54AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING3498.60AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS127.33AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM35.70AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15MAINTENANCE CHARGES AND SURFACING OF ROADS938.09AS PER PROJECT REPORT
16STP154.40AS PER PROJECT REPORT
17UNDERGROUND WATER TANK91.39AS PER PROJECT REPORT
18RAIN WATER HARVESTING57.12AS PER PROJECT REPORT
19ELECTRICAL SUB STATION3153.50AS PER PROJECT REPORT
20PLANTATION AND ROAD SIDE TREES21.98AS PER PROJECT REPORT


06-09-2024 (date)
06-09-2024 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 APARTMENT/SHOPS/OTHER BUILDINGS Type A1 209.51 1137 238212.87 1137 0 5
2 APARTMENT/SHOPS/OTHER BUILDINGS Type A2 21.008 14 294.112 0 0 0
3 APARTMENT/SHOPS/OTHER BUILDINGS Type A3 12.513 2 25.026 0 0 0
4 APARTMENT/SHOPS/OTHER BUILDINGS Type A4 17.567 2 35.134 0 0 0
Total1155238567.142113705






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
A11137ATTACHED IN FOLDER C


01-10-2022
31-03-2030
31-03-2030
01-10-2022
0
31-03-2030


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
01-10-2022
0
31-03-2030
TOTAL NO. OF UNDERGROUND PARKING ARE 3793 BUT UNABLE TO UPDATE PARKING MORE THAN 1000 IN THE SECTION (VEHICLE PARKINGS DETAILS OF THE PROJECT)


1000
56
0
202
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments2173.435367.967736.76070414356.52953
Shops0000
Plots0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments10186.723847736.7607046860.2600838846.503758
Shops0000
Plots0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments6945.8536456945.8536456945.85364519159.20601
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments19159.2060119159.2060117004.2546216285.93748
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments16285.9374821316.118538240.00115311976.03469
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments10108.0179219448.1017619448.1017630656.20236
Shops0000
Plots0000

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments30656.20236
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System315.35315.350
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other0078.51

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000106.97
Water Supply System00084.67
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other78.5178.5178.5178.51
Security and firefighting233.24233.24

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements106.97106.97106.97106.97
Water Supply System84.6784.6784.6784.67
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other78.5178.5178.5178.51
Security and firefighting233.24233.24233.24233.24

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements106.97106.97106.970
Water Supply System84.6784.6784.6784.67
Sewerage treatment & garbage disposal00063.74
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other78.5178.5178.5178.51
Security and firefighting233.24233.24233.24233.24

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal63.7463.7463.7463.74
Electricity Supply System0001261.40
Storm Water Drainage091.0991.0991.09
Parks and Playgrounds031.8331.8331.83
Clubhouse/community centres0000
Shopping area0000
Other78.5178.5178.5178.51
Security and firefighting233.24233.24233.24233.24

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal63.74
Electricity Supply System1261.40
Storm Water Drainage91.09
Parks and Playgrounds31.83
Clubhouse/community centres0
Shopping area78.51
Other233.24












Particulars Remarks, if any
i. No. of Flats/Apartments constructed1137
ii. No. of Flats/ Apartments booked1137
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter802268 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter383885 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter418382 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter418382 Lakhs
vii. Amount invested in the project upto the date of application92392 Lakhs
Land cost (If any)3252 Lakhs
Apartments64659 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.24481 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession0 Lakhs
(a) In respect of existing allottees460271 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS855.780
II. WATER SUPPLY SYSTEM846.740
III. STORM WATER DRAINAGE364.340
IV. ELECTRICITY SUPPLY SYSTEM00
V. SEWAGE TREATMENT & GARBAGE DISPOSAL382.470
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER8065.32630.70
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.127.330
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
ICICI BANK LIMITED 9A, PHELPS BUILDING, CONNAUGHT PLACE, NEW DELHI 110001
000705053340
ICIC0000007
110229002
0007
01. Mr. Puneet Rakheja (H.No. 386, Sector 31, Faridabad, Haryana 121003) 02. Mr. Pankaj Kumar Jain (C701, Apex Acacia Valley, Sector 3, Vaishali, Ghaziabad, Uttar Pradesh 201010) 03. Mr. Gaurav Arora (A-33, Near Mehfil Banquet Hall, Mahendru Enclave, GT Karnal Road, Delhi 110009) 04. Ms. Sandhya Singla (Neelanchal Apartments, Plot No. 3, Sector 4, Dwarka, Delhi 110075) 05. Mr. Ashok Nanda (A255, Surya Nagar, Chander Nagar, Ghaziabad, Uttar Pradesh 201011) 06. Mr. Rakesh Sharma ( Village Lohani, Postoffice baliah Khurd, Tehsil Barsar, Lohane (32/20), Hamirpur, Himachal Pradesh-174305 ) 07. Mr. Pankaj Kumar (A3, Rajcottage 1/18, Rajendra Nagar, Ghaziabad, Uttar Pradesh 201005) 08. Mr. Amit Bansal (472, Sector-10, Panchkula, Haryana - 134113) 09. Mr. Himanshu Garg ( House No. E-301, Block-E, Ardee City Gate No. 2, Sector 52, Wazirabad, Farrukhnagar, Gurgaon Haryana 122003) 10. Mr. Sujeet Kumar Sinha (House no. R1-E503, 2nd floor, New Chandigarh, DLF Hyde Park Estate, Mullanpur, SAS Nagar (Mohali) Punjab - 140901) 11. Mr. Sanjay Goenka (F-222, Park Place, DLF5, DLF Golf Course Road, Sector 54, Gurgaon 122011) 12. Mr. Sunil Sharma (C-28, 2nd floor, WZ-62-A/2, near ring road, Sharda Puri, New Delhi, Ramesh Nagar, West Delhi, Delhi - 110015) 13. Dinesh Suri (E-404 Bestech Park View Ananda, Sector-81, Sector-82, Gurgaon, Haryana, 122004)
No Default Certificate Annexed











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. ZONING PLAN APPROVALALREADY BEEN OBTAINED02-01-2023
II. LICENSE APPROVALALREADY BEEN OBTAINED20-12-2012
III. BUILDING PLAN /SITE PLAN APPROVALALREADY BEEN OBTAINED06-09-2024








Yes


Yes


As per HARERA Act & Rules







INDEPENDENT FLOORS AT DLF CITY PHASE IV
0.8314
44
0
40
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
838185975268
Cost of the apartments000
Cost of the infrastructure477157175046
Others costs36102879222


18153 Lakhs
1436 Lakhs
0 Lakhs
6537 Lakhs
No
14-11-2024
14-11-2024




GARDENCITY FLOORS
0.965
64
0
64
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
496653764145
Cost of the apartments000
Cost of the infrastructure356051493923
Others costs1405227221


9288 Lakhs
463 Lakhs
0 Lakhs
3807 Lakhs
No
16-06-2025
16-06-2025




MOULSARI ENCLAVE
1.035
40
0
40
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
442353513708
Cost of the apartments000
Cost of the infrastructure328150153348
Others costs1142336361


13610 Lakhs
917 Lakhs
0 Lakhs
5546 Lakhs
No
31-10-2024
31-10-2024




ALAMEDA CENTRAL
2.98125
0
40
0
40
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
442351553693
Cost of the apartments000
Cost of the infrastructure11922165937
Others costs323129902756


6218 Lakhs
3184 Lakhs
0 Lakhs
3908 Lakhs
No
08-09-2027
08-09-2027




ARCADE 68
2
0
16
0
16
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
530835281937
Cost of the apartments000
Cost of the infrastructure6261500328
Others costs247920281609


3314 Lakhs
7797 Lakhs
0 Lakhs
1502 Lakhs
No
10-11-2027
10-11-2027




INDEPENDENT FLOORS AT DLF CITY PHASE I, II & III
0.9092
44
0
42
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
940895784011
Cost of the apartments000
Cost of the infrastructure519660913619
Others costs42123486392


15220 Lakhs
5460 Lakhs
0 Lakhs
5392 Lakhs
No
14-02-2025
14-02-2025




CENTRAL 67
8.6987
75
0
66
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
169982034415498
Cost of the apartments000
Cost of the infrastructure434957451273
Others costs126491459914225


20343 Lakhs
50626 Lakhs
0 Lakhs
11725 Lakhs
No
31-12-2027
31-12-2027




GARDENCITY CENTRAL
8.0396
0
122
0
121
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
9948115379946
Cost of the apartments000
Cost of the infrastructure160843083441
Others costs834072306505


15638 Lakhs
16683 Lakhs
0 Lakhs
9284 Lakhs
No
24-08-2024
24-08-2024




INDEPENDENT FLOORS AT DLF ALAMEDA
2.78
116
0
116
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
17659.231941214180
Cost of the apartments000
Cost of the infrastructure135061624811116
Others costs415431643064


34999 Lakhs
6194 Lakhs
0 Lakhs
13595 Lakhs
No
24-11-2024
24-11-2024




INDEPENDENT FLOORS AT DLF CITY PHASE I & II
0.9726
52
0
44
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
7325.6268525634
Cost of the apartments000
Cost of the infrastructure592165065250
Others costs1405346384


18180 Lakhs
4742 Lakhs
0 Lakhs
5213 Lakhs
No
15-12-2024
15-12-2024




THE GRAND ENCLAVE
10.77
0
76
0
76
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
851391474361
Cost of the apartments000
Cost of the infrastructure56545297555
Others costs285938503806


10065 Lakhs
9862 Lakhs
0 Lakhs
3866 Lakhs
No
31-08-2026
31-08-2026










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETILES / MARBLE / GRANITE / LAMINATED WOOD
2WALL FINISHING DETAILSOBD/ SEMI-ACRYLIC / ACRYLIC EMULSION / TILES
3KITCHEN DETAILSMODULAR KITCHEN WITH APPLIANCES AS PER POINT 6.6 IN UNIT WISE SPECIFICATIONS, CABINETRY AND SS SINK
4BATHROOM FITTINGSCP FITTINGS, WASH BASIN, WC WITH ACCESSORIES
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESMS / UPVC / AL / WOOD / COMPOSITE MATERIAL
7GLASS WORKCLEAR / TINTED / COATED / FROSTED GLASS AS PER POINT NUMBER 13
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSPVC CONDUITS, FR WIRING
10CUPBOARD DETAILSMODULAR WARDROBES IN BEDROOMS
11WATER STORAGEOHT & UGT WATER TANKS
12LIFT DETAILSBRANDED MAKE
13EXTERNAL GLAZINGSUPVC / ALUMINIUM
13.1WINDOWS/GLAZINGSUPVC / ALUMINIUM
14DOORSWOODEN FLUSH DOOR
14.1MAIN DOORSWOODEN FIRE RESISTANT FLUSH DOOR
14.2INTERNAL DOORSWOODEN FLUSH DOOR
15AIR CONDITIONINGVRV / VRF WITH HIGH WALL UNITS IN LIVING, DINING, BEDROOMS, UTILITY & KITCHEN
16ELECTRICAL FITTINGSSWITCH BOX AND SOCKETS. HOME AUTOMATION IN SELECT AREAS AS PER DESIGN
17CNG PIPE LINEGAS PIPE LINE PROVISION ONLY
18PROVISION OF WIFI AND BROADBAND FACILITYPROVISION ONLY
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERIOR GRADE PAINT
20INTERNAL FINISHINGNIL
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORMARBLE
1 . 2 WALLSACRYLIC EMULSION
1 . 3 CEILINGACRYLIC EMULSION
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORLAMINATED WOODEN FLOORING
2 . 2 WALLSACRYLIC EMULSION
2 . 3 CEILINGACRYLIC EMULSION
2 . 4 MODULAR WARDROBESMODULAR WARDROBES
3 . MASTER TOILET
3 . 1 FLOORTILES / MARBLE / GRANITE
3 . 2 WALLSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT & MIRROR
3 . 3 CEILINGACRYLIC EMULSION
3 . 4 COUNTERSMARBLE / GRANITE / SYNTHETIC STONE
3 . 5 SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC, TOWEL RAIL / RING, TOILET PAPER HOLDER
3 . 6 FITTING/FIXTURESGLASS SHOWER-PARTITION, EXHAUST FAN, GEYSER
4 . BED ROOMS
4 . 1 FLOORLAMINATED WOODEN FLOORING
4 . 2 WALLSACRYLIC EMULSION
4 . 3 CEILINGACRYLIC EMULSION
4 . 4 WARDROBESMODULAR WARDROBES
5 . TOILET
5 . 1 FLOORTILES / MARBLE / GRANITE
5 . 2 WALLSCOMBINATION OF TILES, ACRYLIC EMULSION PAINT & MIRROR
5 . 3 CEILINGACRYLIC EMULSION
5 . 4 COUNTERSGRANITE / MARBLE /SYNTHETIC STONE
5 . 5 SANITARY WARE/CP FITTINGSCP FITTINGS, WASH BASIN, WC, TOWEL RAIL / RING, TOILET PAPER HOLDER
5 . 6 FIXTURESGLASS SHOWER-PARTITION, EXHAUST FAN, GEYSER
6 . KITCHEN
6 . 1 FLOORTILES / GRANITE
6 . 2 WALLSTILES UP TO 2’ ABOVE COUNTER / EMULSION PAINT IN THE BALANCE AREA
6 . 3 CEILINGACRYLIC EMULSION
6 . 4 COUNTERSGRANITE /SYNTHETIC STONE
6 . 5 FIXTURESCP FITTINGS, SS SINK, EXHAUST FAN
6 . 6 KITCHEN APPLIANCESHOB, CHIMNEY, OVEN, MICROWAVE, DISHWASHER, REFRIGERATOR, GEYSER, WASHING MACHINE(IN BALCONY)
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORTILES
7 . 2 WALLS & CEILINGOBD / SEMI-ACRYLIC / TILES
7 . 3 TOILETCP FITTINGS, WC, WASH BASIN
7 . 4 BALCONYTILES / CEMENT-BASED EXTERIOR GRADE PAINT
8 . SIT-OUTS
8 . 1 FLOORTILES
8 . 2 WALLS & CEILINGEXTERIOR GRADE PAINT
8 . 3 RAILINGSMS / SS / AL / GLASS
8 . 4 FIXTURESCEILING LIGHTS












Sr. No.Document DescriptionDate of Document UploadView Document
1 TOWER B-ALL SECTION AND ELEVATION 16-04-2025 ------
2 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 17-04-2025 View Document
3 TOWER A-ALL FLOOR PLAN AND AREA CALCULATION 16-04-2025 ------
4 DEMARCATION PLAN 17-04-2025 View Document
5 TOWER A-ALL SECTION AND ELEVATION 16-04-2025 ------
6 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 17-04-2025 View Document
7 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 17-04-2025 View Document
8 TOWER E-ALL SECTION AND ELEVATION 16-04-2025 ------
9 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 27-03-2025 View Document
10 CERTIFICATE FOR BUDGET COST ESTIMATED 16-04-2025 ------
11 PROMOTER'S AFFIDAVIT WITH DECLARATION 16-04-2025 ------
12 BASEMENT 3 PLAN AND AREA CALCULATION 16-04-2025 ------
13 TOILET DETAIL 16-04-2025 ------
14 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 17-04-2025 View Document
15 ZONING 16-04-2025 ------
16 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 17-04-2025 View Document
17 TOWER D-ALL FLOOR PLAN AND AREA CALCULATION 16-04-2025 ------
18 BASEMENT 1 PLAN AND AREA CALCULATION 16-04-2025 ------
19 SITE PLAN WITH SERVICES AND GREEN AREA 16-04-2025 ------
20 TOWER B-ALL FLOOR PLAN AND AREA CALCULATION 16-04-2025 ------
21 TOWER C-ALL FLOOR PLAN AND AREA CALCULATION 16-04-2025 ------
22 ZONING PLAN 17-04-2025 View Document
23 BR-III_APPROVAL OF PHASING PLAN & REVISED BP OF LICENCE NO. 123 OF 2012_06.09.2024 16-04-2025 ------
24 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 17-04-2025 View Document
25 LICENSE ALONG WITH LAND SCHEDULE 16-04-2025 ------
26 SUPERIMPOSED_PLAN 16-04-2025 ------
27 TOWER C-ALL SECTION AND ELEVATION 16-04-2025 ------
28 TOWER D-ALL SECTION AND ELEVATION 16-04-2025 ------
29 TOWER E-ALL FLOOR PLAN AND AREA CALCULATION 16-04-2025 ------
30 BASEMENT 2 PLAN AND AREA CALCULATION 16-04-2025 ------
31 CONVENIENT SHOPPING 16-04-2025 ------
32 EWS ALL DRAWINGS 16-04-2025 ------
33 AIRPORT HEIGHT APPROVAL 16-04-2025 ------
34 INFORMATION TO REVENUE 16-04-2025 ------
35 ELECTRICAL LOAD 16-04-2025 ------
36 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 17-04-2025 View Document
37 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 17-04-2025 View Document