HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-1640-2025
Submission Date : 01-03-2025 03:29:19 PM
Applicant Type : Company
Project Type: ONGOING




BPTP LIMITED
OT-14, 3RD FLOOR, NEXT DOOR PARKLANDS, SECTOR-76 FARIDABD FARIDABAD HR 121004 IN
01204492650
9717790021 (Number Shared by Promoter in Public)
Rera.gurugram@bptp.com
http://bptp.com
XXXX442A
U45201HR2003PLC082732
 
 


 
 


 
 


 
 


 
 


 
 







PARK FLOOR II EWS
SECTOR 76 FARIDABAD
FARIDABAD
FARIDABAD
01204492650
9289747444 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com
RAHUL BHATNAGAR
01204492650
9289747444 (Number Shared by Promoter in Public)
rera.gurugram@bptp.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
126608025-02-202559010INDUSIND BANKHRERA Panchkula







0.14 (Acre)
1.75
1.75
24.149 (Acre)
License no 1042- 1046 and 1048 -1061.
No
Address     OT 14 3RD FLOOR NEXT DOOR PARKLANDS SECTOR 76 FARIDABAD HARYANA.
Annexure-B- AS A COLLABORATOR BY VIRTUE OF NCLT ORDER DATED 20.09.2024 AND DTCP ORDER DATED 20.02.2025. DTCP HAS RECOGNIZED ALL THE LICENSES IN FAVOUR OF BPTP LIMITED VIDE ITS ORDER DATED 20.02.2025.
BY VIRTUE OF NCLT ORDER DATED 20.09.2024 AND DTCP ORDER DATED 20.02.2025.DTCP HAS RECOGNIZED ALL THE LICENSES IN FAVOUR OF BPTP LIMITED VIDE ITS ORDER DATED 20.02.2025.
No
BPTP HEREIN AS A COLLABORATOR BY VIRTUE OF NCLT ORDER DATED 20.09.2024 AND DTCP ORDER DATED 20.02.2025.DTCP HAS RECOGNIZED ALL THE LICENSES IN FAVOUR OF BPTP LIMITED VIDE ITS ORDER DATED 20.02.2025.
Yes
No
Yes







1643.19 Lakhs
244.06 Lakhs
1081.06 Lakhs
0 Lakhs
318.07 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.14
3CONSTRUCTION OF ROADS 0
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total0.14




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSFMDANo
WATER SUPPLYFMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALFMDAYes
STORM WATER DRAINAGEFMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS0YET TO BE PREPARED
2WATER SUPPLY SYSTEM0YET TO BE PREPARED
3STORM WATER DRAINAGE0YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM0YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL0YET TO BE PREPARED
6STREET LIGHTING0YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED


NA (date)
03-11-2010 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 APARTMENT/SHOPS/OTHER BUILDINGS Type EWS 0 120 0 70 50 1
Total120070501






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
EWS70OC APPLIED AND CONSTRUCTION IS COMPLETE AT SITE.


03-11-2010
31-12-2016
31-03-2028
03-11-2010
95
31-03-2028
OC APPLIED AND CONSTRUCTION IS COMPLETE AT SITE.
OC ALREADY APPLIED


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
03-11-2010
95
31-03-2025
OC APPLIED AND CONSTRUCTION IS COMPLETE AT SITE.
OC ALREADY APPLIED


0
0
0
51
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments1032.9
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments121485
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments9.16
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter (2026)
Apr-JuneJuly-SepOct-DecJan-Mar












Particulars Remarks, if any
i. No. of Flats/Apartments constructed120EWS Units
ii. No. of Flats/ Apartments booked70EWS Units
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter105 Lakhs-
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter59.06 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter45.94 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter45.94 Lakhs
vii. Amount invested in the project upto the date of application1595.03 Lakhs
Land cost (If any)244.06 Lakhs
Apartments1032.9 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.318.07 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession48.16 Lakhs
(a) In respect of existing allottees48.16 Lakhs
(b) In respect of rest of the project48.16 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS00
II. WATER SUPPLY SYSTEM00
III. STORM WATER DRAINAGE00
IV. ELECTRICITY SUPPLY SYSTEM00
V. SEWAGE TREATMENT & GARBAGE DISPOSAL00
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
No
PNB BANK LCB, DCM BUILDING, NEW DELHI - 110001
2164002100008077
PUNB0814300
110229132
14300
Mr. Kabul Chawla Address: 7, Amrita Shergill Marg Delhi-110003 Mr. Sudhanshu Tripathi Address: 202, 3rd Floor,Jor Bagh, , Delhi -110003 Mr. Manik Malik D-2/2406, VasantKunj, South West Delhi, Delhi- 110070 Mr. Sachin GuptaH.No C-5/32. Yamuna Vihar, Delhi -110053 Mr. RakeshKumar Agrawal D-308 , Narwana Apartment , 89, IPExtension , Patparganj Delhi- 110092 Mr. Amit SinghalAddress: E3/28, Nand Nagri Mandoli Delhi-110093 Mr. Sanjeev Loknath Agrawal Flat no 32 Sudarshan Apartments IPExtension Delhi -110092
As Attached











No
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE NO 1042-1061ALREADY BEEN OBTAINED25-07-2006
II. RENEWAL OF LICENSE APPROVAL 1042-1061ALREADY BEEN OBTAINED12-12-2024
III. BUILDING PLAN APPROVAL LETTERALREADY BEEN OBTAINED03-11-2010
IV. ZONING APPROVAL LETTERALREADY BEEN OBTAINED15-09-2008
V. WATER CONNECTION APPROVALALREADY BEEN OBTAINED16-03-2022
VI. SEWERAGE CONNECTIONALREADY BEEN OBTAINED05-04-2022








Yes


Yes


Allotment of EWS units are done through policies framed under DTCP laws.







BPTP DISTRICT 6 BLOCK L
6.318
0
114
0
109
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1732.142444.912444.91
Cost of the apartments000
Cost of the infrastructure9681237.151237.15
Others costs764.141207.761207.76


9255 Lakhs
2717 Lakhs
0 Lakhs
0 Lakhs
No
01-12-2021
26-08-2026




DISTRICT WALK A
0.495
70
0
53
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1131.60554.78
Cost of the apartments834.000228.01
Cost of the infrastructure000
Others costs297.600326.77


1373 Lakhs
3617 Lakhs
0 Lakhs
0 Lakhs
No
27-07-2020
29-10-2024




DISTRICT WALK B
0.418
70
0
61
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
1051.081684.871684.87
Cost of the apartments000
Cost of the infrastructure826.001030.591030.59
Others costs225.08654.28654.28


3377 Lakhs
1578 Lakhs
0 Lakhs
0 Lakhs
No
27-07-2020
01-11-2024




DISTRICT WALK E
0.312
40
0
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
752.9800
Cost of the apartments685.1500
Cost of the infrastructure000
Others costs67.8300


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
17-10-2022
31-12-2026




BPTP DISTRICT 1 BLOCK B
10.056
0
189
0
178
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3657.63371.583371.58
Cost of the apartments000
Cost of the infrastructure14531462.891462.89
Others costs2204.601908.691908.69


19249 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
06-08-2019
01-05-2025




BPTP DISTRICT 1 BLOCK A
12.373
0
220
0
183
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
4504.3904101.33
Cost of the apartments000
Cost of the infrastructure1786.0001542.19
Others costs2718.3902559.14


15057 Lakhs
975 Lakhs
0 Lakhs
0 Lakhs
No
01-08-2019
29-04-2025




BPTP DISTRICT 1 BLOCK C
12.72
0
244
0
148
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
4640.114726.434726.43
Cost of the apartments000
Cost of the infrastructure1838.002289.562289.56
Others costs2802.112436.872436.87


16115 Lakhs
362 Lakhs
0 Lakhs
0 Lakhs
No
20-08-2019
18-05-2025




BPTP PARKLANDS
18.30625
0
96
0
67
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3193.0701763.48
Cost of the apartments000
Cost of the infrastructure6320568.09
Others costs2561.0701195.39


18900 Lakhs
11790.39 Lakhs
15000 Lakhs
13500 Lakhs
No
01-06-2024
31-03-2029










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSECERAMIC TILES IN TOILETS
2WALL FINISHING DETAILSPLASTER WITH WHITE WASH
3KITCHEN DETAILSKITCHEN COUNTER – IPS, KITCHEN SINK – BOWL ONLY
4BATHROOM FITTINGSGI PIPING AND CPVC AND UPVC ENGLISH WC SIMPLE TAPS
5WOOD WORK ETCFLUSH DOOR WITH MS FRAME
6DOORS AND WINDOS FRAMESGLASS WINDOW WITH MS FRAME
7GLASS WORK-
8ELECTRIC FITTINGSCU WIRING AND ORDINARY SWITCHES WITH BAKELITE SHEET
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGERCC TANK
12LIFT DETAILS-
13EXTERNAL GLAZINGSGLASS WINDOW WITH MS FRAME
13.1WINDOWS/GLAZINGSGLASS WINDOW WITH MS FRAME
14DOORSTOWER BOLT
14.1MAIN DOORSL. DROP
14.2INTERNAL DOORSTOWER BOLT
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSCU WIRING
17CNG PIPE LINENOT PROVIDED
18PROVISION OF WIFI AND BROADBAND FACILITYNOT PROVIDED
19EXTERNAL FINISHING/COLOUR SCHEMEPLASTER WITH WHITE WASH
20INTERNAL FINISHINGFLOORING-IPS
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORIPS
1 . 2 WALLSPLASTER WITH WHITE WASH
1 . 3 CEILINGPLASTER WITH WHITE WASH
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORIPS
2 . 2 WALLSPLASTER WITH WHITE WASH
2 . 3 CEILINGPLASTER WITH WHITE WASH
2 . 4 MODULAR WARDROBESNOT PROVIDED
3 . MASTER TOILET
3 . 1 FLOORCEREMIC TILES
3 . 2 WALLSPLASTER WITH WHITE WASH
3 . 3 CEILINGPLASTER WITH WHITE WASH
3 . 4 COUNTERSIPS
3 . 5 SANITARY WARE/CP FITTINGSENGLISH WC
3 . 6 FITTING/FIXTURESGI, CPVC, UPVC PIPING SINGLE TAP
4 . BED ROOMS
4 . 1 FLOORCERAMIC TILES
4 . 2 WALLSPLASTER WITH WHITE WASH
4 . 3 CEILINGPLASTER WITH WHITE WASH
4 . 4 WARDROBESNOT PROVIDED.
5 . TOILET
5 . 1 FLOORCERAMIC TILES
5 . 2 WALLSPLASTER WITH WHITE WASH
5 . 3 CEILINGPLASTER WITH WHITE WASH
5 . 4 COUNTERSNOT PROVIDED
5 . 5 SANITARY WARE/CP FITTINGSGI, CPVC, UPVC PIPING
5 . 6 FIXTURESSINGLE TAP
6 . KITCHEN
6 . 1 FLOORCERAMIC TILES
6 . 2 WALLSPLASTER WITH WHITE WASH
6 . 3 CEILINGPLASTER WITH WHITE WASH
6 . 4 COUNTERSIPS
6 . 5 FIXTURES-
6 . 6 KITCHEN APPLIANCES-
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 28-02-2025 View Document
2 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 01-03-2025 View Document
3 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 28-02-2025 View Document
4 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 28-02-2025 View Document
5 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 28-02-2025 View Document