HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-1601-2024
Submission Date : 03-10-2025 05:03:24 PM
Applicant Type : Company
Project Type: NEW




RALITH REALTY PVT. LTD.
B-903 NPSC SOCIETY PLOT NO 5 SECTOR 2 DWARKA SOUTH WEST DELHI 110075
01802954141
9996017708 (Number Shared by Promoter in Public)
info@ralithrealty.com
https://ralithrealty.com
XXXX994K
U45309DL2022PTC400328
 
 


 
 


 
 







RALITH RETREAT
VILLAGE AZIZULAPUR, SECTOR-19A, PANIPAT, HARYANA
PANIPAT
PANIPAT
01802954141
9996017708 (Number Shared by Promoter in Public)
info@ralithrealty.com
MAHENDER KUMAR
01802954141
9996017708 (Number Shared by Promoter in Public)
info@ralithrealty.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
12329-09-2025835000HDFC BANKHRERA Panchkula
24539903-10-2025178500HDFC BANKHRERA Panchkula







21.36875 (Acre)
1.00 FOR RESIDENTIAL PLOT AND 1.75 FOR COMMERCIAL
1.00
21.36875 (Acre)
166 0f 2024 Dated 28.11.2024 Valid upto 27.11.2029
Yes







13763.71 Lakhs
7120.23 Lakhs
0 Lakhs
2141.53 Lakhs
4501.95 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 9.95633
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0
3CONSTRUCTION OF ROADS 3.82735
4PAVEMENTS 3.58837
5PARKS AND PLAYGROUNDS 2.07133
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0.45677
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0.08377
13COMMERCIAL 0.83997
14UNDERGROUND 0.05827
15COMMUNITY 0.20167
16UD 0.28492
Total21.36875




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVP-PWDYes
WATER SUPPLYHSVPYes
ELECTRICITYUHBVNYes
SEWAGE DISPOSALHSVPYes
STORM WATER DRAINAGEHSVPYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS575.48AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM244.47AS PER PROJECT REPORT
3STORM WATER DRAINAGE207.34AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM338.16AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL179.21AS PER PROJECT REPORT
6STREET LIGHTING78.78AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING24.67AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS20.27AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM14.76AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER203.67AS PER PROJECT REPORT
15STP64.56AS PER PROJECT REPORT
16UGT28.82AS PER PROJECT REPORT
17RWHP24.81AS PER PROJECT REPORT
18ELECTRIC SUB STATION136.55AS PER PROJECT REPORT


28-11-2024 (date)
NA (date)
01-12-2025
31-03-2030
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 17586.80 40
2 571.56 2
3 1471.60 5
4 4672.00 16
5 5972.40 28
6 7155.75 47
7 761.25 5
Total143


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other3.95
STP0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00055
Water Supply System00010
Sewerage treatment & garbage disposal00010
Electricity Supply System0008
Storm Water Drainage0000
Parks and Playgrounds0003
Clubhouse/community centres0000
Shopping area0000
Other00025
Security Fire Fighting0
street light0
Security and Fire Fighting3

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements55718585
Water Supply System16322626
Sewerage treatment & garbage disposal1015327
Electricity Supply System15000
Storm Water Drainage403846
Parks and Playgrounds2066
Clubhouse/community centres0000
Shopping area0000
Other45481015
Under Ground Water Tank00
Street Light16042
Security and fire fighting0
Rain water Harvesting4
Underground water tank4
Underground Water Tank6
Renewable Energy System0
Security Fire Fighting0
Rain Water Harvesting Pit0

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements65562020
Water Supply System22262223
Sewerage treatment & garbage disposal8153215
Electricity Supply System42601614
Storm Water Drainage6352019
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other25886
Under Ground Water Tank126.82
Street Light11789
Rain water harvesting54
ELECTRIC SUB STATION3420
Renewable Energy44
Security and Fire Fighting59.5
Security Fire Fighting0
Renewable Energy System2
Renewable Energy SysteM0

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00045
Water Supply System15553.47
Sewerage treatment & garbage disposal1010103.21
Electricity Supply System70433220
Storm Water Drainage15883
Parks and Playgrounds0030.27
Clubhouse/community centres0000
Shopping area0000
Other4100
Rain water harvesting371.81
Electric Sub station20141912
Renewable Energy System31.76
STP121824
Street Light9.78
Security Fire Fighting7.17
Renewable energy system0
Street light12

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10503.48
Water Supply System5503
Sewerage treatment & garbage disposal0020
Electricity Supply System5553.16
Storm Water Drainage2111.34
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other2101.72
Electric Sub Station1052.55
STP82.56












Yes
No
ICICI BANK LTD SCO182 SECTOR13-17HUDA PANIPAT
777705705105
ICIC10003726
132229007
3726
1. Mr. Vikas Goel-Building 4 Flat 2B Hibiscus Sector 50 Nirvana Country Gurugram 122018 Haryana 2. Mr. Rakesh Kaul-Experion Windchants Villa 5A Sector 112 Choma Gurugram 122017 Haryana
uploaded











Yes
Yes
Yes
No
No
No
No
No
No
No


Yes
No
Yes
Yes
Yes
No
Yes
No
Statutory Approvals Statutory Approvals StatusDate
I. LOIALREADY BEEN OBTAINED12-08-2024
II. LICENSEALREADY BEEN OBTAINED28-11-2024
III. SITE PLANALREADY BEEN OBTAINED28-11-2024
IV. WATER ASSURANCEALREADY BEEN OBTAINED02-01-2025
V. SEWER ASSURANCEALREADY BEEN OBTAINED02-01-2025
VI. STORM WATER ASSURANCEALREADY BEEN OBTAINED02-01-2025
VII. ACCESS PERMISSIONALREADY BEEN OBTAINED16-08-2024
VIII. FOREST NOCALREADY BEEN OBTAINED06-05-2025
IX. ELECTRICAL ASSURANCEALREADY BEEN OBTAINED23-01-2025








Yes


Yes


AS PER HRERA NORMS AND ATTACHED













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE BEING A PLOTTED COLONY
2WALL FINISHING DETAILSNOT APPLICABLE BEING A PLOTTED COLONY
3KITCHEN DETAILSNOT APPLICABLE BEING A PLOTTED COLONY
4BATHROOM FITTINGSNOT APPLICABLE BEING A PLOTTED COLONY
5WOOD WORK ETCNOT APPLICABLE BEING A PLOTTED COLONY
6DOORS AND WINDOS FRAMESNOT APPLICABLE BEING A PLOTTED COLONY
7GLASS WORKNOT APPLICABLE BEING A PLOTTED COLONY
8ELECTRIC FITTINGSNOT APPLICABLE BEING A PLOTTED COLONY
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE BEING A PLOTTED COLONY
10CUPBOARD DETAILSNOT APPLICABLE BEING A PLOTTED COLONY
11WATER STORAGENOT APPLICABLE BEING A PLOTTED COLONY
12LIFT DETAILSNOT APPLICABLE BEING A PLOTTED COLONY
13EXTERNAL GLAZINGSNOT APPLICABLE BEING A PLOTTED COLONY
13.1WINDOWS/GLAZINGSNOT APPLICABLE BEING A PLOTTED COLONY
14DOORSNOT APPLICABLE BEING A PLOTTED COLONY
14.1MAIN DOORSNOT APPLICABLE BEING A PLOTTED COLONY
14.2INTERNAL DOORSNOT APPLICABLE BEING A PLOTTED COLONY
15AIR CONDITIONINGNOT APPLICABLE BEING A PLOTTED COLONY
16ELECTRICAL FITTINGSNOT APPLICABLE BEING A PLOTTED COLONY
17CNG PIPE LINENOT APPLICABLE BEING A PLOTTED COLONY
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE BEING A PLOTTED COLONY
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE BEING A PLOTTED COLONY
20INTERNAL FINISHINGNOT APPLICABLE BEING A PLOTTED COLONY
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE BEING A PLOTTED COLONY
1 . 2 WALLSNOT APPLICABLE BEING A PLOTTED COLONY
1 . 3 CEILINGNOT APPLICABLE BEING A PLOTTED COLONY
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE BEING A PLOTTED COLONY
2 . 2 WALLSNOT APPLICABLE BEING A PLOTTED COLONY
2 . 3 CEILINGNOT APPLICABLE BEING A PLOTTED COLONY
2 . 4 MODULAR WARDROBESNOT APPLICABLE BEING A PLOTTED COLONY
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE BEING A PLOTTED COLONY
3 . 2 WALLSNOT APPLICABLE BEING A PLOTTED COLONY
3 . 3 CEILINGNOT APPLICABLE BEING A PLOTTED COLONY
3 . 4 COUNTERSNOT APPLICABLE BEING A PLOTTED COLONY
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE BEING A PLOTTED COLONY
3 . 6 FITTING/FIXTURESNOT APPLICABLE BEING A PLOTTED COLONY
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE BEING A PLOTTED COLONY
4 . 2 WALLSNOT APPLICABLE BEING A PLOTTED COLONY
4 . 3 CEILINGNOT APPLICABLE BEING A PLOTTED COLONY
4 . 4 WARDROBESNOT APPLICABLE BEING A PLOTTED COLONY
5 . TOILET
5 . 1 FLOORNOT APPLICABLE BEING A PLOTTED COLONY
5 . 2 WALLSNOT APPLICABLE BEING A PLOTTED COLONY
5 . 3 CEILINGNOT APPLICABLE BEING A PLOTTED COLONY
5 . 4 COUNTERSNOT APPLICABLE BEING A PLOTTED COLONY
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE BEING A PLOTTED COLONY
5 . 6 FIXTURESNOT APPLICABLE BEING A PLOTTED COLONY
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE BEING A PLOTTED COLONY
6 . 2 WALLSNOT APPLICABLE BEING A PLOTTED COLONY
6 . 3 CEILINGNOT APPLICABLE BEING A PLOTTED COLONY
6 . 4 COUNTERSNOT APPLICABLE BEING A PLOTTED COLONY
6 . 5 FIXTURESNOT APPLICABLE BEING A PLOTTED COLONY
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE BEING A PLOTTED COLONY
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE BEING A PLOTTED COLONY
7 . 2 WALLS & CEILINGNOT APPLICABLE BEING A PLOTTED COLONY
7 . 3 TOILETNOT APPLICABLE BEING A PLOTTED COLONY
7 . 4 BALCONYNOT APPLICABLE BEING A PLOTTED COLONY
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE BEING A PLOTTED COLONY
8 . 2 WALLS & CEILINGNOT APPLICABLE BEING A PLOTTED COLONY
8 . 3 RAILINGSNOT APPLICABLE BEING A PLOTTED COLONY
8 . 4 FIXTURESNOT APPLICABLE BEING A PLOTTED COLONY












Sr. No.Document DescriptionDate of Document UploadView Document
1 STORM WATER ASSURANCE 18-01-2025 ------
2 LOI 18-01-2025 ------
3 ACCESS PERMISSION 18-01-2025 ------
4 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 13-01-2025 View Document
5 SEWER ASSURANCE 18-01-2025 ------
6 WATER ASSURANCE 18-01-2025 ------
7 LC-IV & LC-IVA 07-04-2025 ------
8 REGITRY 0.61875 ACRES 07-04-2025 ------
9 AUTHORISED SIGNATORY AADHAR 07-04-2025 ------
10 AUTHORISED SIGNATORY PAN 07-04-2025 ------
11 DIRECTOR VIKAS GOAEL AADHAAR 07-04-2025 ------
12 CERTIFICATE OF INCORPORATION 07-04-2025 ------
13 AOA 07-04-2025 ------
14 AKS SAZRA 07-04-2025 ------
15 DIRECTOR VIKAS GOAEL PAN 07-04-2025 ------
16 COMPANY PAN 07-04-2025 ------
17 MOA 07-04-2025 ------
18 REGISTRY 20.75ACRES 07-04-2025 ------
19 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 21-04-2025 View Document
20 OWNERSHIP CERTIFICATE 01-10-2025 ------
21 DIRECTOR RAKESH KAUL AADHAR 30-09-2025 ------
22 COMPANY MASTER DATA 30-09-2025 ------
23 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 30-09-2025 View Document
24 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 30-09-2025 View Document
25 NEC 01-10-2025 ------
26 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 30-09-2025 View Document
27 FINANCIAL STATEMENT 31.03.2023 30-09-2025 ------
28 UNDETAKING 4 (2)L(D) 30-09-2025 ------
29 DIRECTOR RAKESH KAUL PAN 30-09-2025 ------
30 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 30-09-2025 View Document
31 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 30-09-2025 View Document
32 DEMARCATION PLAN 30-09-2025 View Document
33 FINANCIAL STATEMENTS- 31.03.2024 30-09-2025 ------
34 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 30-09-2025 View Document
35 ZONING PLAN 30-09-2025 View Document
36 MAINTAINANCE 30-09-2025 ------
37 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 01-10-2025 View Document
38 BBA 01-10-2025 ------
39 ALLOTMENT LETTER 01-10-2025 ------
40 CA CERTIFICATE COMPANY NET WORTH 01-10-2025 ------
41 DEMEND DRAFT 01-10-2025 ------
42 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 02-10-2025 View Document
43 JAMABANDI 02-10-2025 ------
44 MUTATION 02-10-2025 ------
45 BR FOR BANK ACCOUNT 02-10-2025 ------