HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1780-2024
Submission Date : 25-10-2024 10:41:12 AM
Applicant Type : Company
Project Type: NEW




CORONA REALTORS PVT. LTD
11TH FLOOR, PARAS TWIN TOWER, SECTOR - 54, GURUGRAM
01242456500
9810818355 (Number Shared by Promoter in Public)
vipin.yadav@parasbuildtech.com
https://www.parasbuildtech.com
XXXX575G
U70102DL2014PTC270765
 
 


 
 


 
 







THE FLORETT ENQLAVE
SECTOR 59, GURUGRAM
WAZIRABAD ST
GURUGRAM
01244561500
9810818355 (Number Shared by Promoter in Public)
vipin.yadav@parasbuildtech.com
NARENDRA SINGH
01244561500
9810818355 (Number Shared by Promoter in Public)
narendra.singh@parasbuildtech.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150609123-10-2024200000ICICI BNAKHRERA Gurugram
26271607-06-2024467420HDFC BANKHRERA Gurugram
350586826-11-2024294365HDFC BANKHRERA Gurugram
450573428-06-202470356HDFC BANKHRERA Gurugram







2.1780 (Acre)
2.64
2.60
6.2250 (Acre)
Licence No. 89 of 2022 dated 07.07.2022
No
Address     GURUGRAM
Address     GURUGRAM
Address     GURUGRAM
Address     GURUGRAM
Annexure-B- COLLABORATOR
YES
Yes
70 % PROMOTER AND 30% LAND OWNERS
No
Yes
Yes







22901.97 Lakhs
2419.05 Lakhs
12890.27 Lakhs
285.73 Lakhs
7306.92 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 8814.05
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0.00
3CONSTRUCTION OF ROADS 0.00
4PAVEMENTS 0.00
5PARKS AND PLAYGROUNDS 0.00
6GREEN BELTS 0.00
7VEHICLE PARKINGS 0.00
8ELECTRICITY SUB-STATION 0.00
9CLUB HOUSE 0.00
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0.00
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0.00
12ANY OTHER 0.00
Total8814.05




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSCONNECTEDNo
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS85.38AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM56.02AS PER PROJECT REPORT
3STORM WATER DRAINAGE30.59AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM0YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL41.19AS PER PROJECT REPORT
6STREET LIGHTING9.44AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS6.76AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15MTC CHARGES56.35AS PER PROJECT REPORT


08-07-2022 (date)
14-10-2024 (date)
01-11-2024
31-12-2029
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 66
Total66


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings9051760
Apartment/Shops/Other Buildings515440
Apartment/Shops/Other Buildings64780
Apartment/Shops/Other Buildings66040
Apartment/Shops/Other Buildings645280
Apartment/Shops/Other Buildings53040





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0
Interest to financial institutions262.19
Land Cost1911.28
Others259.03

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0
Interest to financial institutions48.03
Land Cost24.17
Administrative cost0
Marketing cost11.90
Taxes28.56

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Land Cost24.1724.1724.1724.17
Marketing cost95.2295.22256.6656.66
Interest to financial institutions48.0348.0348.0348.03
Taxes28.5628.5628.5628.56
Administrative cost219.42219.42219.42219.42

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Administrative cost219.42219.42219.42219.42
Land Cost24.1724.1724.1724.17
Interest to financial institutions48.0348.0348.0348.03
Taxes28.5628.5628.5628.56
Marketing cost56.6656.6656.6656.66

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Taxes28.5628.5628.5628.56
Marketing cost56.6656.6656.6656.66
Land Cost24.1724.1724.1724.17
Administrative cost219.42219.42219.42219.42
Interest to financial institutions48.0348.0800

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Interest to financial institutions0000
Taxes28.5628.5628.5628.56
Administrative cost219.42219.42219.42219.42
Land Cost24.1724.1724.1724.17
Marketing cost56.6656.6656.6656.66

ParticularsYear-2029
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Marketing cost56.6656.6656.6624.76
Taxes28.5628.5628.5628.80
Interest to financial institutions0000
Administrative cost219.42219.42219.42219.42
Land Cost24.1724.1724.1724.37




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements33.97
Water Supply System22.29
Sewerage treatment & garbage disposal16.39
Electricity Supply System0
Storm Water Drainage12.17
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Street Lighting0.78

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter (2029)
Apr-JuneJuly-SepOct-DecJan-Mar












Yes
No
ICICI BANK LTD, OFFICE NUMBER 11, TIMES TOWER, M G ROAD, GURGAON, HARYANA 122001
777705114304
ICIC0001143
1100229199
1143
Kunal Rishi and Narender . Address - S - 550/51 School BS - 550/51 School Block Shakarpur East Delhi Delhi 110092lock Shakarpur East Delhi Delhi 110092
Yes











Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes


Yes
No
Yes
Yes
Yes
No
Yes
No
Statutory Approvals Statutory Approvals StatusDate
I. LICENCE 89 OF 2022ALREADY BEEN OBTAINED07-07-2022
II. LAYOUT BUILDING PLANALREADY BEEN OBTAINED14-10-2024
III. ECALREADY BEEN OBTAINED17-02-2025
IV. ASSURANCE OF DRINKING WATERALREADY BEEN OBTAINED04-08-2022
V. ASSURANCE OF POWER SUPPLYALREADY BEEN OBTAINED20-07-2022
VI. ASSURANCE OF SEWAGE CONNECTIONALREADY BEEN OBTAINED29-07-2022
VII. ASSURANCE OF STP WATERALREADY BEEN OBTAINED29-07-2022
VIII. NON ENCUMBRANCE REPORTALREADY BEEN OBTAINED10-03-2022
IX. FOREST UNDERTAKINGALREADY BEEN OBTAINED20-07-2022
X. GMDA STORM WATERALREADY BEEN OBTAINED18-07-2024
XI. LC-IVALREADY BEEN OBTAINED07-07-2022
XII. LOIALREADY BEEN OBTAINED31-12-2021
XIII. TITLE SEARCH REPORTALREADY BEEN OBTAINED06-06-2024
XIV. ZONINGALREADY BEEN OBTAINED09-11-2022
XV. SERVICE ESTIMATE ALREADY BEEN OBTAINED02-12-2022








Yes


Yes


Yes







PARAS FLORETT, SECTOR 59, GURUGRAM
6.225
0
101
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6926.456926.455371.90
Cost of the apartments000
Cost of the infrastructure1530.631530.63392.00
Others costs5395.825395.8225.01


0 Lakhs
0 Lakhs
6000 Lakhs
4900 Lakhs
No
31-03-2027
31-03-2027




FLORETT CENTRAL
0.249
39
0
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
2381.92381.90
Cost of the apartments616.70616.700
Cost of the infrastructure128.85128.850
Others costs632.96632.960


0 Lakhs
0 Lakhs
6000 Lakhs
4900 Lakhs
No
06-11-2023
30-06-2027










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVERTIFILED TILES
2WALL FINISHING DETAILSOBD PLASTIC EMULSION PAINT
3KITCHEN DETAILSFLUSH DOOR
4BATHROOM FITTINGSSTEEL FITTINGS
5WOOD WORK ETCFLUSH DOOR & WINDOWS
6DOORS AND WINDOS FRAMESMODULAR DOOR & FLUSH DOOR
7GLASS WORKTOUGHENED GLASS
8ELECTRIC FITTINGSSWITCH 61/16A, WIRE-FRLS, LIGHTS
9CONDUCTING AND WIRING DETAILSFRLS
10CUPBOARD DETAILSNA
11WATER STORAGEPVC TANKS
12LIFT DETAILSKONE/THYSEN KRUPP/JOHNSON OR EQUIVALENT
13EXTERNAL GLAZINGSWEATHER COAT PAINT AS PER DRAWINGS & ELEVATIONS
13.1WINDOWS/GLAZINGSHARDWOOD FRAME
14DOORSMODULAR DOOR & LAMINATE DOOR
14.1MAIN DOORSMODULAR DOOR
14.2INTERNAL DOORSFLUSH DOOR WITH LAMINATE
15AIR CONDITIONINGSPLIT AC/VRV
16ELECTRICAL FITTINGSSWITCH 61/16A, WIRE-FRLS, LIGHTS
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEWEATHER COAT PAINT AS PER DRAWINGS
20INTERNAL FINISHINGOBD PLASTIC EMULSION PAINT
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVERTIFILED TILES AS PER DESIGN
1 . 2 WALLSOBD/ ACRYLIC PAINT
1 . 3 CEILINGOBD/ ACRYLIC PAINT
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVERTIFILED ITALIAN FINISH TILES
2 . 2 WALLSWALL CLADDING WOOD, GLASS MOUNDING
2 . 3 CEILINGOBD/ ACRYLIC PAINT
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORANTI SKID TILES
3 . 2 WALLSWALL CLADDING WOOD, GLASS MOUNDING AS PER DESIGN
3 . 3 CEILINGOBD/ ACRYLIC PAINT
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORVERTIFILED TILES
4 . 2 WALLSWALL CLADDING WOOD, GLASS MOUNDING AS PER DESIGN
4 . 3 CEILINGOBD/ ACRYLIC PAINT
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORANTI SKID TILES
5 . 2 WALLSWALL CLADDING WOOD, GLASS MOUNDING AS PER DESIGN
5 . 3 CEILINGWALL CLADDING WOOD, GLASS MOUNDING AS PER DESIGN
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORVERTIFILED ITALIAN FINISH TILES AS PER DESIGN
6 . 2 WALLSWALL CLADDING WOOD, GLASS MOUNDING AS PER DESIGN AS PER DESIGN PAINT
6 . 3 CEILINGOBD/ ACRYLIC PAINT
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORVERTIFILED ITALIAN FINISH TILES AS PER DESIGN
7 . 2 WALLS & CEILINGWALL CLADDING WOOD, GLASS MOUNDING AS PER DESIGN AS PER DESIGN PAINT
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORVERTIFILED TILES
8 . 2 WALLS & CEILINGOIL BOND DISTEMPER
8 . 3 RAILINGSOIL BOND DISTEMPER
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 BBA 01-08-2025 View Document
2 APPROVED BUILDING PLANS- DRAWING-TYPE-H-H1 28-07-2025 View Document
3 DC REPORT - NON ENCUMBRANCE 28-07-2025 View Document
4 APPROVED BUILDING PLANS- LETTERS-TYPE-F-F1-F7 28-07-2025 View Document
5 UNDERTAKING - EDC DUES 28-07-2025 View Document
6 APPROVED BUILDING PLANS- DRAWING-TYPE-A-A29-A32 28-07-2025 View Document
7 APPROVED BUILDING PLANS- DRAWING-TYPE-C-C6 28-07-2025 View Document
8 APPROVED BUILDING PLANS- LETTERS-TYPE-D-D1-D2 28-07-2025 View Document
9 APPROVED BUILDING PLANS- DRAWING-TYPE-D-D1-D2 28-07-2025 View Document
10 APPROVED BUILDING PLANS- LETTERS-TYPE-A-A18-A26 28-07-2025 View Document
11 APPROVED BUILDING PLANS- LETTERS-TYPE-A-A9-A17 28-07-2025 View Document
12 LOAN FACILITY UNDERATKING_L&T FINANCIALS 28-07-2025 View Document
13 APPROVED BUILDING PLANS- DRAWING-TYPE-A-A21-A24 28-07-2025 View Document
14 PROJECT REPORT 28-07-2025 View Document
15 APPLICATION FORM 01-08-2025 View Document
16 LAYOUT APPROVED PARAS 28-07-2025 View Document
17 APPROVED BUILDING PLANS- DRAWING-TYPE-A-A13-A16 28-07-2025 View Document
18 APPROVED BUILDING PLANS- DRAWING-TYPE-F-F1-F3 28-07-2025 View Document
19 JAMABANDI 28-07-2025 View Document
20 LC-IV-B-BILATERAL 28-07-2025 View Document
21 ZONNING PLAN-COMMERCIAL SITE 28-07-2025 View Document
22 APPROVED BUILDING PLANS- LETTERS-TYPE-A-A36-A44 28-07-2025 View Document
23 ASSURANCE DRINKING WATER SUPPLY 28-07-2025 View Document
24 LC-IV 28-07-2025 View Document
25 LOI FOR 140.356 ACRES PLOTTED 28-07-2025 View Document
26 UNDERTAKING - 10% LAND TRANSFER TO GOVT 28-07-2025 View Document
27 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 25-10-2024 View Document
28 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 25-10-2024 View Document
29 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 25-10-2024 View Document
30 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 25-10-2024 View Document
31 DEMARCATION PLAN 25-10-2024 View Document
32 ZONING PLAN 25-10-2024 View Document
33 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 25-10-2024 View Document
34 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 25-10-2024 View Document
35 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 25-10-2024 View Document
36 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 25-10-2024 View Document
37 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 25-10-2024 View Document
38 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 25-10-2024 View Document
39 APPROVED BUILDING PLANS- DRAWING-TYPE-A-A25-A28 28-07-2025 View Document
40 MUTATION 28-07-2025 View Document
41 LAND TTILE SEARCH REPORT 28-07-2025 View Document
42 APPROVED BUILDING PLANS- DRAWING-TYPE-A-A1-A4 28-07-2025 View Document
43 TSR 28-07-2025 View Document
44 APPROVED BUILDING PLANS- DRAWING-TYPE-F-F4-F7 28-07-2025 View Document
45 APPROVED BUILDING PLANS- DRAWING-TYPE-C-C7-C11 28-07-2025 View Document
46 LOI -CORONA REALTORS 28-07-2025 View Document
47 GMDA_STORM WATER 28-07-2025 View Document
48 ASSURANCE FOR POWER SUPPLY - DHBVN 28-07-2025 View Document
49 CONVEYANCE DEED 01-08-2025 View Document
50 AKS-SIZRA 28-07-2025 View Document
51 APPROVED BUILDING PLANS- DRAWING-TYPE-A-A17-A20 28-07-2025 View Document
52 NOC FOR NO REQUIREMENT OF POWER LINE SHIFTING 28-07-2025 View Document
53 APPROVED BUILDING PLANS- DRAWING-TYPE-C-C1-C5 28-07-2025 View Document
54 COLLABORATION AGREEMENT 28-07-2025 View Document
55 APPROVED BUILDING PLANS- DRAWING-TYPE-A-A33-A36 28-07-2025 View Document
56 APPROVED BUILDING PLANS- DRAWING-TYPE-A-A41-A44 28-07-2025 View Document
57 APPROVED BUILDING PLANS- LETTERS-TYPE-A-A27-A35 28-07-2025 View Document
58 APPROVED BUILDING PLANS- LETTERS-TYPE-C-C7-C11 28-07-2025 View Document
59 NOC NO FOREST LAND DIVERSION 28-07-2025 View Document
60 APPROVED BUILDING PLANS- DRAWING-TYPE-A-A37-A40 28-07-2025 View Document
61 ASSURANCE SEWERAGE CONNECTION 28-07-2025 View Document
62 APPROVED BUILDING PLANS- LETTERS-TYPE-C-C1-C6 28-07-2025 View Document
63 NCZ LETTER - DTP TO STP 28-07-2025 View Document
64 APPROVED BUILDING PLANS- DRAWING-TYPE-A-A5-A8 28-07-2025 View Document
65 FOREST UNDERTAKING 28-07-2025 View Document
66 APPROVED BUILDING PLANS- DRAWING-TYPE-A-A9-A12 28-07-2025 View Document
67 ASSURANCE STP WATER 28-07-2025 View Document
68 PRESCRIBED ROC 28-07-2025 View Document
69 APPROVED BUILDING PLANS- LETTERS-TYPE-A-A1-A8 28-07-2025 View Document
70 LOI 110.84 ACRES (PLOTTED) 28-07-2025 View Document
71 NOC NCZ 28-07-2025 View Document
72 NOC NO TREE CUTTING 28-07-2025 View Document
73 ALLOTMENT LETTER 01-08-2025 View Document
74 ANNUAL RETURN 01-08-2025 View Document
75 APPROVED BUILDING PLANS- DRAWING-TYPE-E-E1 28-07-2025 View Document