HRERA GurugramTemp Project Id : RERA-GRG-PROJ-1747-2024
Submission Date : 30-09-2024 03:21:14 PM
Applicant Type : Company
Project Type: ONGOING




LOON LAND DEVELOPMENT LIMITED
OFFICE NO. 1221-A, DEVIKA TOWER, 12TH FLOOR, 6, NEHRU PLACE,DELHI-110019
01244732000
8929012754 (Number Shared by Promoter in Public)
loonlanddevelopmentltd@gmail.com
https://Www.loonlanddevelopment.in
XXXX705A
U70109DL2014PLC267465
 
 


 
 


 
 


 
 


 
 







M3M ANTALYA HILLS 3
SECTOR 79, GURUGRAM
MANESAR
GURUGRAM
124473200000
8929012754 (Number Shared by Promoter in Public)
loonlanddevelopmentltd@gmail.com
RAJNEESH SACHDEVA
124473200000
8929034470 (Number Shared by Promoter in Public)
loonlanddevelopmentltd@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques/Online Banking:-

Drafts/ Banker’s Cheques

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
150243627-09-2024424200ICICI BANK LIMITEDHRERA Gurugram
250243727-09-2024253700ICICI BANK LIMITEDHRERA Gurugram

Online Banking








4.42 (Acre)
2.64
2.64
24.74375 (Acre)
Licence no 195 of 2022 dated 29-11-2022 by Director Town and Country Planning Haryana
No
Address     VILLAGE SIKHOPUR
Address     VILLAGE SIKHOPUR
Address     VILLAGE SIKHOPUR
Address     VILLAGE SIKHOPUR
Address     VILLAGE SIKHOPUR
Address     OFFICE NO 1221 A DEVIKA TOWER 12TH FLOOR 6 NEHRU PLACE NEW DELHI
Annexure-B- THE APPLICANT IS THE LICENSE HOLDER AS WELL AS THE COLLABORATOR
NO
No
NA
No
Yes
Yes







45861.40 Lakhs
3961.50 Lakhs
22862.55 Lakhs
1731.42 Lakhs
17305.94 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 4.42
3CONSTRUCTION OF ROADS 0
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total4.42




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDAYes
WATER SUPPLYGMDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDAYes
STORM WATER DRAINAGEGMDAYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS202.20AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM62.23AS PER PROJECT REPORT
3STORM WATER DRAINAGE27.54AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM0AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL33.56AS PER PROJECT REPORT
6STREET LIGHTING27.46AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING54.74AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS43.71AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0AS PER PROJECT REPORT
15HARDSCAPE AND SOFTSCAPE62.44AS PER PROJECT REPORT
16BOUNDARY WALL116.42AS PER PROJECT REPORT
17MAIN ENTRANCE WORK AND GUARD HOUSE56.30AS PER PROJECT REPORT
18PARKING MARKING4.41AS PER PROJECT REPORT
19STP60.15AS PER PROJECT REPORT
20ELECTRIFICATION31.22AS PER PROJECT REPORT
21UNDERGROUND TANK35.02AS PER PROJECT REPORT
22RAIN WATER HARVESTING24.32AS PER PROJECT REPORT
23ELECTRICAL SUB STATION465.11AS PER PROJECT REPORT
24SWITCHING STATION112.39AS PER PROJECT REPORT
25CONSULTANCY156.10AS PER PROJECT REPORT
26INFRA ESTABLISHMENTS156.10AS PER PROJECT REPORT


02-11-2023 (date)
24-09-2024 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 APARTMENT/SHOPS/OTHER BUILDINGS Type P-1 301.97 4 1207.88 0 4 0
2 APARTMENT/SHOPS/OTHER BUILDINGS Type P-2 242 4 968 0 4 0
3 APARTMENT/SHOPS/OTHER BUILDINGS Type P-3 217.63 4 870.52 2 2 0
4 APARTMENT/SHOPS/OTHER BUILDINGS Type P-4 180.24 4 720.96 0 4 0
5 APARTMENT/SHOPS/OTHER BUILDINGS Type P-5 206.24 4 824.96 0 4 0
6 APARTMENT/SHOPS/OTHER BUILDINGS Type P-6 206.61 4 826.44 0 4 0
7 APARTMENT/SHOPS/OTHER BUILDINGS Type P-7 150.87 4 603.48 0 4 0
8 APARTMENT/SHOPS/OTHER BUILDINGS Type P-8 207.82 4 831.28 0 4 0
9 APARTMENT/SHOPS/OTHER BUILDINGS Type P-9 303.08 4 1212.32 1 3 0
10 APARTMENT/SHOPS/OTHER BUILDINGS Type P-10 258.00 4 1032 0 4 0
11 APARTMENT/SHOPS/OTHER BUILDINGS Type P-11 343.65 4 1374.6 2 2 0
12 APARTMENT/SHOPS/OTHER BUILDINGS Type P-12 308.59 4 1234.36 0 4 0
13 APARTMENT/SHOPS/OTHER BUILDINGS Type P-13 214.73 4 858.92 0 4 0
14 APARTMENT/SHOPS/OTHER BUILDINGS Type P-14 341.95 4 1367.8 0 4 0
15 APARTMENT/SHOPS/OTHER BUILDINGS Type P-15 331.27 4 1325.08 0 4 0
16 APARTMENT/SHOPS/OTHER BUILDINGS Type P-16 294.45 4 1177.8 1 3 0
17 APARTMENT/SHOPS/OTHER BUILDINGS Type P-17 296.65 4 1186.6 0 4 0
18 APARTMENT/SHOPS/OTHER BUILDINGS Type P-18 313.27 4 1253.08 0 4 0
19 APARTMENT/SHOPS/OTHER BUILDINGS Type P-19 327.91 4 1311.64 0 4 0
20 APARTMENT/SHOPS/OTHER BUILDINGS Type P-20 197.76 4 791.04 0 4 0
21 APARTMENT/SHOPS/OTHER BUILDINGS Type P-21 94.76 4 379.04 3 1 0
22 APARTMENT/SHOPS/OTHER BUILDINGS Type P-22 251.98 4 1007.92 0 4 0
23 APARTMENT/SHOPS/OTHER BUILDINGS Type P-23 356.72 4 1426.88 3 1 0
24 APARTMENT/SHOPS/OTHER BUILDINGS Type P-24 354.20 4 1416.8 0 4 0
25 APARTMENT/SHOPS/OTHER BUILDINGS Type P-25 339.45 4 1357.8 0 4 0
26 APARTMENT/SHOPS/OTHER BUILDINGS Type P-32 296.03 4 1184.12 0 4 0
27 APARTMENT/SHOPS/OTHER BUILDINGS Type P-33 294.71 4 1178.84 1 3 0
28 APARTMENT/SHOPS/OTHER BUILDINGS Type P-34 294.71 4 1178.84 1 3 0
29 APARTMENT/SHOPS/OTHER BUILDINGS Type P-35 260.01 4 1040.04 2 2 0
30 APARTMENT/SHOPS/OTHER BUILDINGS Type P-36 259.30 4 1037.2 3 1 0
31 APARTMENT/SHOPS/OTHER BUILDINGS Type P-37 269.51 4 1078.04 3 1 0
32 APARTMENT/SHOPS/OTHER BUILDINGS Type P-38 274.67 4 1098.68 3 1 0
33 APARTMENT/SHOPS/OTHER BUILDINGS Type P-39 176.00 4 704 2 2 0
34 APARTMENT/SHOPS/OTHER BUILDINGS Type P-40 231.86 4 927.44 2 2 0
35 APARTMENT/SHOPS/OTHER BUILDINGS Type P-41 157.93 4 631.72 0 4 0
36 APARTMENT/SHOPS/OTHER BUILDINGS Type P-42 279.60 4 1118.4 0 4 0
37 APARTMENT/SHOPS/OTHER BUILDINGS Type P-B2 8426.04 140 1179645.6 28 112 0
38 APARTMENT/SHOPS/OTHER BUILDINGS Type L 5010.62 80 400849.6 10 70 0
39 APARTMENT/SHOPS/OTHER BUILDINGS Type A1 10554.72 132 1393223.04 17 115 0
40 APARTMENT/SHOPS/OTHER BUILDINGS Type N 617.86 8 4942.88 3 5 0
41 APARTMENT/SHOPS/OTHER BUILDINGS Type G-06A 345.06 4 1380.24 1 3 0
42 APARTMENT/SHOPS/OTHER BUILDINGS Type G-06B 345.06 4 1380.24 2 2 0
43 APARTMENT/SHOPS/OTHER BUILDINGS Type COMM-2 2223.71 107 237936.97 0 107 0
44 APARTMENT/SHOPS/OTHER BUILDINGS Type COMM-04 163.23 3 489.69 0 3 0
45 APARTMENT/SHOPS/OTHER BUILDINGS Type COMM-03 559.87 7 3919.09 0 7 0
Total6293261511.87905390






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
P-320
P-910
P-1120
P-1610
P-2130
P-2330
P-3310
P-3410
P-3520
P-3630
P-3730
P-3830
P-3920
P-4020
B2280
L100
A1170
N30
G-06A10
G-06B20


01-07-2024
31-10-2028
31-10-2028
01-07-2024
0
31-10-2028


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
01-07-2024
0
31-10-2028


0
0
0
0
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments2902.67
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments492.15
Shops0
Plots0

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments848.151116.911176.281511.34
Shops0000
Plots0000

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1663.192171.542350.052476.27
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1923.371719.17748.74687.67
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments1076.26
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Rain Water harvesting0.49
STP1.20
Consultancy3.12
Infra Establishment3.12

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00012.13
Water Supply System003.113.73
Sewerage treatment & garbage disposal001.682.01
Electricity Supply System0000
Storm Water Drainage001.381.65
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
STP1.802.413.013.61
Infra Establishment4.686.247.809.37
Consultancy4.686.247.809.37
Rain Water harvesting0.730.971.221.46
Under Ground Water Tank4.20

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements14.1520.2224.2630.33
Water Supply System4.366.227.479.33
Sewerage treatment & garbage disposal2.353.364.035.03
Electricity Supply System0000
Storm Water Drainage1.932.753.304.13
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Infra Establishment10.9315.6118.3723.41
Consultancy10.9315.6118.3723.41
Underground water tank3.504.205.25
STP4.216.027.229.02
Hardscape and Softscape12.49009.37
Rain Water harvesting1.702.432.923.65

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements22.2420.228.098.09
Water Supply System9.336.224.982.49
Sewerage treatment & garbage disposal5.033.362.681.34
Electricity Supply System07.807.807.80
Storm Water Drainage4.132.752.201.10
Parks and Playgrounds010.9310.9310.93
Clubhouse/community centres0000
Shopping area0000
Other0000
Parking Marking0.880.880.880.88
Consultancy17.1715.616.246.24
Switching Station028.1028.1028.10
Electrical Sub Station0116.28116.28116.28
Rain Water harvesting2.682.430.970.97
Underground water tank7.003.502.452.10
STP6.626.022.412.41
Security10.9510.9510.9510.95
Street Light5.495.495.495.49
Infra Establishment17.1715.616.246.24
Main Entrance work Guard House11.2611.2611.2611.26
Boundary wall23.2823.2823.2823.28
Hardscape and Softscape12.4912.496.245.62

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements42.46
Water Supply System4.98
Sewerage treatment & garbage disposal2.68
Electricity Supply System0
Storm Water Drainage2.20
Parks and Playgrounds10.93
Clubhouse/community centres0
Shopping area0
Other0
Hardscape and Softscape3.75
STP4.21
Underground water tank2.80
Rain Water harvesting1.70
Street Light5.49
Consultancy10.93
Infra Establishment10.93
Boundary wall23.28
Main Entrance work Guard House11.26
parking Marking0.88
Electrification7.80
Switching Sub Station28.10
Electrical Sub Station116.28
Security10.95








Cash Flow in each quarter (In Lakhs)












Particulars Remarks, if any
i. No. of Flats/Apartments constructed629
ii. No. of Flats/ Apartments booked90
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter14055.25 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter357.44 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter13697.81 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter13697.81 Lakhs
vii. Amount invested in the project upto the date of application7372.50 Lakhs
Land cost (If any)3961.50 Lakhs
Apartments2902.67 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.17305.94 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession38488.91 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project38488.91 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS202.200
II. WATER SUPPLY SYSTEM63.230
III. STORM WATER DRAINAGE27.540
IV. ELECTRICITY SUPPLY SYSTEM31.220
V. SEWAGE TREATMENT & GARBAGE DISPOSAL33.560
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.43.710
XIII. COVERED PARKING4.410
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM54.740
XVII. OTHER FACILITIES AS PER PROJECT REPORT1271.800









Yes
Yes
Account Details
ICICI BANK LTD, M3M TEE POINT SECTOR-65,GURUGRAM, HARYANA
777705006711
ICIC0007242
110229338
007242
1) Mr. Vyom Shakti Nigam-D3/103 Paras city E3 AreraColony Bhopal M.P. 462016 2) MS. Amarjot Kaur Sahni-3/66Subhash Nagar West Delhi 110027 3) Ms. Shubhra Bakshi-House No 10/6, DLF Phase-1, Sikanderpur Ghosi, Gurgaon,Haryana- 122002 4)Mr. Vidya Sagar-3G-208, Faridabad, NIT Faridabad,Haryana- 121001 5) Mr. Pradeep Kumar Katiyar- 357,Bakhothi Purwa, Thana Bilaur, Kanpur- 209202, UP 6) Mr. Pratap Singh-10A Pocket 2 MayurVihar East Delhi 110096 7) Ms. Meenal Sood- C-81A, Moti Nagar, Ramesh Nagar H.O, West Delhi, Delhi 110015 8) Mr. Anurag Kulshrestha- 1 F Pocket-3, Mayur Vihar, Phase 1, Chilla Saroda Khadar, East Delhi 9) Mr. Surender Kumar Gupta- 954 Gokul Dham, Society 1st Floor Krishna Colony, Gurugram 10) Mr.Rajiv Kumar Verma- House No.-06 E,Pratap Enclave,Mohan Garden,Uttam Nagar,,West Delhi 11) Mr.Ashok Kumar- Hajipur(15),Guragon,Haryana 12) Mr.Amit Saxena- 163,Sarai Nazar Ali,Behind M.M,G Hospital,Ghaziabad Uttar Pradesh
Uploaded











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. LICENSE APPROVALALREADY BEEN OBTAINED29-11-2022
II. REVISED ZONING PLANALREADY BEEN OBTAINED17-11-2023








Yes


Yes


AS PER THE TERMS AND REGULATIONS OF THE AUTHORITY







M3M ANTALYA HILLS PHASE I
8.7111
636
159
196
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
29946.1829946.184010.74
Cost of the apartments19053.5719053.572676.79
Cost of the infrastructure2823.962823.960.00
Others costs6482.196482.19787.04


4728.41 Lakhs
24974.39 Lakhs
52400 Lakhs
0 Lakhs
No
31-12-2025
31-12-2025




M3M ANTALYA HILLS PHASE II
10.074
1392
348
1392
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
95563.3895563.3815103.57
Cost of the apartments58526.9358526.937872.30
Cost of the infrastructure7703.427703.42153
Others costs25070.0825070.084988.72


63954.40 Lakhs
136528.20 Lakhs
93420 Lakhs
39540 Lakhs
No
31-03-2026
31-03-2026










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEVITRIFIED TILES/LAMINATE WOODEN FOR BEDROOM ; ANTISKID CERAMIC TILES FOR TOILET
2WALL FINISHING DETAILSPLASTER AND OBD
3KITCHEN DETAILSVITRIFIED TILES, PLASTER AND OBD
4BATHROOM FITTINGSAS PER APPROVED MAKE
5WOOD WORK ETCFLUSH DOOR FOR ENTRANCE AND INTERNAL DOORS, FINISHED WITH LAMINATE/VENEER
6DOORS AND WINDOS FRAMESUPVC / ALUMINIUM POWDER COATED FOR EXTERNAL
7GLASS WORKEXTERNAL DOORS AND WINDOWS, RAILINGS AS PER DESIGN
8ELECTRIC FITTINGSAS PER APPROVED MAKE
9CONDUCTING AND WIRING DETAILSAS PER APPROVED MAKE
10CUPBOARD DETAILSWOODEN WITH LAMINATE/VENEER
11WATER STORAGEPVC TANK; UGT
12LIFT DETAILS4 TO 6 PASSENGER LIFTS AS PER NORMS
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSALUMINUM GLAZING / UPVC GLAZING
14DOORSWOODEN WITH LAMINATE/VENEER
14.1MAIN DOORSWOODEN WITH LAMINATE/VENEER
14.2INTERNAL DOORSWOODEN WITH LAMINATE/VENEER
15AIR CONDITIONINGPROVISION ONLY
16ELECTRICAL FITTINGSAS PER APPROVED MAKE
17CNG PIPE LINEPROVISION ONLY
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMEAS PER APPROVED DESIGN
20INTERNAL FINISHINGPLASTER AND OBD
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORVITRIFIED TILES / LAMINATE WOODEN / CERAMIC TILE
1 . 2 WALLSPLASTER WITH OBD
1 . 3 CEILINGOBD AND PUTTY
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORVITRIFIED TILES / LAMINATE WOODEN / CERAMIC TILE
2 . 2 WALLSPLASTER WITH OBD
2 . 3 CEILINGOBD AND PUTTY
2 . 4 MODULAR WARDROBESWOODEN WITH LAMINATE/VENEER
3 . MASTER TOILET
3 . 1 FLOORANTISKID CERAMIC TILES
3 . 2 WALLSPLASTER AND DADO
3 . 3 CEILINGGRID FALSE CEILING / OBD
3 . 4 COUNTERSAS PER APPROVED MAKE
3 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
3 . 6 FITTING/FIXTURESAS PER APPROVED MAKE
4 . BED ROOMS
4 . 1 FLOORVITRIFIED TILES / LAMINATE WOODEN
4 . 2 WALLSPLASTER AND OBD
4 . 3 CEILINGOBD
4 . 4 WARDROBESWOODEN WITH LAMINATE/VENEER
5 . TOILET
5 . 1 FLOORANTISKID CERAMIC TILES
5 . 2 WALLSPLASTER AND DADO
5 . 3 CEILINGOBD
5 . 4 COUNTERSAS PER APPROVED MAKE
5 . 5 SANITARY WARE/CP FITTINGSAS PER APPROVED MAKE
5 . 6 FIXTURESAS PER APPROVED MAKE
6 . KITCHEN
6 . 1 FLOORVITRIFIED TILES
6 . 2 WALLSPLASTER AND DADO ABOVE COUNTER
6 . 3 CEILINGOBD
6 . 4 COUNTERSAS PER APPROVED MAKE
6 . 5 FIXTURESAS PER APPROVED MAKE
6 . 6 KITCHEN APPLIANCESAS PER APPROVED MAKE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORANTISKID VITRIFIED TILES
7 . 2 WALLS & CEILINGPLASTER AND PAINT
7 . 3 TOILETANTISKID CERAMIC TILES
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 30-09-2024 View Document
2 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 30-09-2024 View Document
3 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 30-09-2024 View Document
4 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 30-09-2024 View Document
5 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 30-09-2024 View Document
6 CA CERTIFICATE INVENTORY 20-12-2024 View Document
7 BASEMENT FLOOR PLAN- COMMERCIAL 2 20-12-2024 View Document
8 BUILDING PLAN SET-3 20-12-2024 View Document
9 CA CERTIFICATE- NET WORTH 20-12-2024 View Document
10 FIRE APPROVAL COMMERCIAL 2 20-12-2024 View Document
11 MUTATIONS 20-12-2024 View Document
12 WATER SUPPLY PLAN 20-12-2024 View Document
13 STORM WATER LAYOUT 20-12-2024 View Document
14 APPROVAL OF SERVICE PLANS & ESTIMATES 20-12-2024 View Document
15 BR-III- COMMERCIAL-04 20-12-2024 View Document
16 BUILDING PLAN SET-4 20-12-2024 View Document
17 BR-III, COMMERCIAL-03 20-12-2024 View Document
18 BUILDING PLAN SET-9 20-12-2024 View Document
19 GROUND & 1ST FLOOR PLAN- COMMERCIAL 2 20-12-2024 View Document
20 BUILDING PLAN SET-11 20-12-2024 View Document
21 COMMERCIAL-2- ZONING PLAN 20-12-2024 View Document
22 ELECTRICITY SUPPLY PLAN 20-12-2024 View Document
23 LOI 20-12-2024 View Document
24 BUILDING PLAN SET-5 20-12-2024 View Document
25 DEMARCATION PLAN 20-12-2024 View Document
26 BUILDING PLAN SET-8 20-12-2024 View Document
27 BUILDING PLAN SET-6 20-12-2024 View Document
28 FIRE APPROVAL COMMERCIAL 3 20-12-2024 View Document
29 LC-IV AND BILATERAL AGREEMENT 20-12-2024 View Document
30 BUILDING PLAN SET-1 20-12-2024 View Document
31 FIRE APPROVAL COMMERCIAL 4 20-12-2024 View Document
32 LICENSE 20-12-2024 View Document
33 REP-II 20-12-2024 View Document
34 BUILDING PLAN SET-10 20-12-2024 View Document
35 SEWERAGE LAYOUT 20-12-2024 View Document
36 STREET LIGHT PLAN 20-12-2024 View Document
37 ZONING PLAN APPROVED 20-12-2024 View Document
38 FOREST NOC 20-12-2024 View Document
39 BR-III COMMERCIAL 2- CORRIGENDUM 20-12-2024 View Document
40 PAYMENT PLAN 20-12-2024 View Document
41 JAMABANDI (1) 20-12-2024 View Document
42 BR-III COMMERCIAL-2 20-12-2024 View Document
43 BR-III FORM 20-12-2024 View Document
44 BUILDING PLAN SET-7 20-12-2024 View Document
45 BUILDING PLAN SET-12 20-12-2024 View Document
46 CA CERTIFICATE EXPENDITURE 20-12-2024 View Document
47 CA CERTIFICATE NON DEFAULT 20-12-2024 View Document
48 COMMERCIAL- 3 & 4- ZONING PLAN APPROVED 20-12-2024 View Document
49 LAYOUT PLAN 20-12-2024 View Document
50 TERRACE FLOOR PLAN- COMMERCIAL 2 20-12-2024 View Document