HRERA GurugramTemp Project Id : RERA-GRG-PROJ-116-2018
Submission Date : 30-01-2019 10:47:20 AM
Applicant Type : Company
Project Type: NEW




ASHIANA HOUSING LIMITED
11G, EVEREST, 46/C, CHOWRINGHEE ROAD, KOLKATA 700071 WEST BENGAL
01142654265
9234509892 (Number Shared by Promoter in Public)
shantanu.haldule@ashianahousing.com
https://www.ashianahousing.com/
XXXX093P
L70109WB1986PLC040864
 
 


 
 


 
 


 
 







ASHIANA ANMOL PLAZA PHASE I
REVENUE VILLAGE DHUNELA, SECTOR 33, TEHSIL SOHNA
SOHNA
GURUGRAM
09500052792
9599052793 (Number Shared by Promoter in Public)
shantanu.haldule@ashianahousing.com
MS CHAUHAN
09500052792
9599052793 (Number Shared by Promoter in Public)
ms.chauhan@ashianahousing.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
11489606-12-201824050HDFC BANKHRERA Gurugram







0.339 (Acre)
0.9596
0.5098
13.3375 (Acre)
20 of 2014
No
Address     5G/1, EVEREST, 46C, CHOWRANGHEE ROAD, KOLKATTA
Annexure-B- DEVELOPMENT AGREEMENT AND POWER OF ATTORNEY
THE POWER OF ATTORENY IS DULY REGISTERED BEFORE THE SUB REGISTRAR, SOHNA DATED 24TH JULY 2014 VIDE DOCUMENT NO. 44, BAHI NO. 4, ZILD NO. 124, PAGE NO. 12
Yes
N/A
No
No
No







34128314 Lakhs
4131285 Lakhs
26413605 Lakhs
2626160 Lakhs
957264 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD 0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 411.49
3CONSTRUCTION OF ROADS 273.18
4PAVEMENTS 101.04
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 199.87
7VEHICLE PARKINGS 388.42
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0
12ANY OTHER 0
Total1374




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSN/ANo
WATER SUPPLYHUDAYes
ELECTRICITYDHBVNYes
SEWAGE DISPOSALHUDAYes
STORM WATER DRAINAGEN/ANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS113000YET TO BE PREPARED
2WATER SUPPLY SYSTEM43000YET TO BE PREPARED
3STORM WATER DRAINAGE85000YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM893000YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL153000YET TO BE PREPARED
6STREET LIGHTING21000YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING408000YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER910000YET TO BE PREPARED


NA (date)
NA (date)
31-07-2016
31-10-2019
Sr. No Plot Area(In Square Meter)Number of plots in the project
1 0 0
Total0


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings16.18681
Apartment/Shops/Other Buildings13.3711
Apartment/Shops/Other Buildings1461
Apartment/Shops/Other Buildings14.0211





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments12403746
Shops1685450
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System16000
Sewerage treatment & garbage disposal153000
Electricity Supply System195000
Storm Water Drainage38000
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Security and Firefighting306000
Street Lighting4000

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar












Yes
No
HDFC BANK LTD., GREATER KAILASH 2, NEW DELHI 110048
50200036328296
HDFC0000027
110240005
000027
Vishal Gupta, Ankur Gupta, Varun Gupta, Shantanu Haldule
It has been attached.











Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes


Yes
No
Yes
No
Yes
No
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. 1. BUILDING PLAN APPROVALALREADY BEEN OBTAINED30-01-2015
II. 2. AAI HEIGHT NOCALREADY BEEN OBTAINED30-09-2019
III. 3. ENVIRONMENTAL CLEARANCEALREADY BEEN OBTAINED28-12-2015
IV. 4. CONSENT TO ESTABLISHMENTALREADY BEEN OBTAINED01-04-2016
V. 5. FIRE FIGHTING SCHEME APPROVALALREADY BEEN OBTAINED22-11-2016








Yes


Yes









ASHIANA SURBHI PHASE I,II,III BHIWADI
11681.68
288
0
231
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
414630432414630432488577865
Cost of the apartments3500159763500159760
Cost of the infrastructure64614456646144560
Others costs000


554172906 Lakhs
20610541 Lakhs
0 Lakhs
0 Lakhs
No
02-05-2017
02-05-2017




ASHIANA NAVRANG PHASE I, II, III GUJARAT
43573.732
256
0
216
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
30593477030593477075775101
Cost of the apartments253603000253603000272895399
Cost of the infrastructure523317705233177066007601
Others costs002489195


294598886 Lakhs
8684132 Lakhs
0 Lakhs
0 Lakhs
Yes
30-09-2019
30-09-2019




ASHIANA DWARKA PHASE I, II JODHPUR
35644.41
187
0
163
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
351997878351997878339513113
Cost of the apartments278564628278564628244766581
Cost of the infrastructure524154555241545563104490
Others costs210177952101779531642042


825284280 Lakhs
4125296 Lakhs
0 Lakhs
0 Lakhs
No
30-04-2019
30-04-2019




ASHIANA ANMOL PHASE I SOHNA
15381.37
300
0
162
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11823046331182304633823946760
Cost of the apartments746536494746536494425167286
Cost of the infrastructure202725503202725503170607749
Others costs233042636233042636228171725


836004505 Lakhs
178548437.7 Lakhs
0 Lakhs
0 Lakhs
Yes
31-10-2019
31-10-2019




ASHIANA DWARKA EWS LIG
1282
102
0
101
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
720761157207611551108278
Cost of the apartments565706975657069736907453
Cost of the infrastructure770242877024286852425
Others costs780242878024287348400


412642140 Lakhs
2062648 Lakhs
0 Lakhs
0 Lakhs
No
31-01-2019
31-01-2019




ASHIANA SHUBHAM PHASE I
13754
144
0
142
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
244727271244727271307064679
Cost of the apartments193978999193978999251007861
Cost of the infrastructure507482715074827156056818
Others costs000


508113500 Lakhs
45010794 Lakhs
0 Lakhs
0 Lakhs
No
30-11-2018
31-03-2018




ASHIANA SURBHI PHASEIV
5203
96
0
76
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
165716762165716762146838446
Cost of the apartments1274410681274410680
Cost of the infrastructure35468654354686540
Others costs000


170075521 Lakhs
30033761 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2018
31-10-2017




ASHIANA SURBHI PHASE V BHIWADI
1974
96
0
27
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
447877044478770460604193
Cost of the apartments33701304337013040
Cost of the infrastructure10275200102752000
Others costs8112008112000


35071956 Lakhs
24824635 Lakhs
0 Lakhs
0 Lakhs
No
30-04-2019
31-07-2018




ASHIANA SURBHI PHASE II A BHIWADI
1100
41
0
34
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
2963977929639779202220374
Cost of the apartments24126279241262790
Cost of the infrastructure551349955134990
Others costs000


15569555 Lakhs
1653779 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2016
31-10-2016




ASHIANA UMANG PHASE I JAIPUR
12956
288
0
282
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
492739737.6492739737.6629833689
Cost of the apartments43069382443069382437841116.8
Cost of the infrastructure620459146204591467760141
Others costs000


1031210543 Lakhs
7897552 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2017
31-03-2017




ASHIANA UMANG PHASE II JAIPUR
23346.02
288
0
261
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
493253376493253376517902777
Cost of the apartments431207462431207462428016520
Cost of the infrastructure620459146204591481721670
Others costs008164587


1021895435 Lakhs
17902535 Lakhs
0 Lakhs
0 Lakhs
No
31-07-2017
31-07-2017




ASHIANA UMANG PHASE III JAIPUR
7208
144
0
139
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
272083866272083866253639606
Cost of the apartments237125876237125876211381235
Cost of the infrastructure313495143134951437537226
Others costs472114547211454721145


510297577 Lakhs
3874251 Lakhs
0 Lakhs
0 Lakhs
No
31-10-2018
31-10-2018




ASHIANA UMANG PHASE IV JAIPUR
7703
192
0
75
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
42627334042627334029281210
Cost of the apartments29089008029089008026792015
Cost of the infrastructure52102452521024520
Others costs83280808832808082489195


19844627 Lakhs
233880341 Lakhs
0 Lakhs
0 Lakhs
No
31-10-2021
31-10-2021




ASHIANA TARANG BHIWADI
9429
192
0
141
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
3675140763675140760
Cost of the apartments2871030962871030960
Cost of the infrastructure75059200750592000
Others costs535177953517793326210560


388929451 Lakhs
52000983 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2019
30-09-2018




ASHIANA NIRMAY PHASE 1 BHIWADI
9504
460
0
149
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
407454707407454707380993018
Cost of the apartments3152331003152331000
Cost of the infrastructure86262991862629910
Others costs595861659586160


624533547 Lakhs
88077542 Lakhs
0 Lakhs
0 Lakhs
Yes
30-06-2018
31-01-2018




ASHIANA NIRMAY PHASE II BHIWADI
5143
96
0
32
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
23944640023944640032958597
Cost of the apartments1494085511494085510
Cost of the infrastructure1494085511494085510
Others costs43818624438186240


624533547 Lakhs
88077542 Lakhs
0 Lakhs
0 Lakhs
Yes
31-05-2021
31-05-2021




ASHIANA TOWN PHASE I BHIWADI
21858.02
448
0
405
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
699736874699736874870487364
Cost of the apartments6320470006320470000
Cost of the infrastructure67689874676898740
Others costs000


1488778462 Lakhs
10199428 Lakhs
0 Lakhs
0 Lakhs
Yes
14-06-2016
14-06-2016




ASHIANA TOWN PHASE II BHIWADI
16480.87
336
0
239
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
5250440665250440660
Cost of the apartments4740062294740062290
Cost of the infrastructure51037837510378370
Others costs000


900461603 Lakhs
24590881 Lakhs
0 Lakhs
0 Lakhs
Yes
14-06-2016
14-06-2016




ASHIANA TOWN PHASE III & III A
19603.45
392
0
263
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
6264930786264930780
Cost of the apartments5657852595657852590
Cost of the infrastructure60707819607078190
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
Yes
02-05-2017
02-05-2017




ASHIANA TOWN PHASE IV EWS/SHOPS
6145.64
283
0
244
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
626493078626493078782238341
Cost of the apartments5657852595657852590
Cost of the infrastructure60707819607078190
Others costs000


149366976 Lakhs
1834492 Lakhs
0 Lakhs
0 Lakhs
Yes
31-10-2016
31-10-2016




ASHIANASHUBHAM PHASE II
12361
144
0
79
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
27979614027979614055308748
Cost of the apartments17560344517560344532498271
Cost of the infrastructure455731004557310015659388
Others costs58619595586195957151089


92941648 Lakhs
135971384 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2021
31-03-2021










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSETHE FLOORING IS CERAMIC IN THE ENTIRE UNIT.
2WALL FINISHING DETAILSTHE INTERNAL WALLS AND INTERNAL CEILING-OIL BOUND DISTEMPER; EXTERNAL PAINT- CEMENT PAINT; AND RAILINGS AND GRILLS- ENAMEL PAINT.
3KITCHEN DETAILSFLOORING- CERAMIC DADO- CERAMIC KITCHEN COUNTER-KOTA STONE OR EQUIVALENT SS SINK-16’’X16””, S.S. SINGLE BOWL
4BATHROOM FITTINGSPILLAR COCK – WASH BASIN- CP, PRAYAG OR EQUIVALENT BIB COCK LONG BODY – BATH- CP, PRAYAG OR EQUIVALENT HEALTH FAUCET FOR EWC- CP, PRAYAG OR EQUIVALENT SINK COCK SWIVEL- CP, PRAYAG OR EQUIVALENT BIB COCK WITH NOZZLE FOR WASH MACHINE-CP, PRAYAG OR EQUIVALENT ANGLE VALVE BELOW WASHBASIN/CISTERN/RO- PVC, PRAYAG OR EQUIVALENT PVC GRATING- PVC, SUPREME OR EQUIVALENT TOWEL ROD-C.P., PRAYAG OR EQUIVALENT WASH BASIN-WHITE CHINA WARE IWC- WHITE CHINAWARE WITH PVC TANK EWC CISTERN- PVC TANK
5WOOD WORK ETCN/A
6DOORS AND WINDOS FRAMESDOOR FRAME- MS PRESSED STEEL WINDOW FRAME- ALUMINIUM ANODIZED OR POWDER COATED FRAME WITH FLOAT GLASS
7GLASS WORKN/A
8ELECTRIC FITTINGSPIANO TYPE ISI APPROVED, SSK OR EQUIVALENT
9CONDUCTING AND WIRING DETAILSN/A
10CUPBOARD DETAILSN/A
11WATER STORAGEN/A
12LIFT DETAILSJOHNSON
13EXTERNAL GLAZINGSN/A
13.1WINDOWS/GLAZINGSN/A
14DOORSNA
14.1MAIN DOORSMAIN DOOR SHUTTER- 35 MM THICK FLUSH DOOR BOTH SIDE PAINTED LOCK AND HANDLE- ANODISED ALUMINIUM L-DROP WITH C TYPE HANDLE TOWER BOLT- ALUMINIUM ANODISED DOOR STOPPER- ALUMINIUM ANODISED
14.2INTERNAL DOORS30 MM THICK FLUSH DOOR BOTH SIDE PAINTED ALL OTHER DOORS LOCK AND HANDLE- ANODISED ALUMINIUM L-DROP WITH C TYPE HANDLE TOWER BOLT- ALUMINIUM ANODISED DOOR STOPPER- ALUMINIUM ANODISED
15AIR CONDITIONINGN/A
16ELECTRICAL FITTINGSSAME AS ABOVE
17CNG PIPE LINEN/A
18PROVISION OF WIFI AND BROADBAND FACILITYN/A
19EXTERNAL FINISHING/COLOUR SCHEMECEMENT PAINT
20INTERNAL FINISHINGOIL BOUND DISTEMPER
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORN/A
1 . 2 WALLSN/A
1 . 3 CEILINGN/A
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORCERAMIC
2 . 2 WALLSOIL BOUND DISTEMPER
2 . 3 CEILINGOIL BOUND DISTEMPER
2 . 4 MODULAR WARDROBESN/A
3 . MASTER TOILET
3 . 1 FLOORCERAMIC
3 . 2 WALLSOIL BOUND DISTEMPER
3 . 3 CEILINGOIL BOUND DISTEMPER
3 . 4 COUNTERSN/A
3 . 5 SANITARY WARE/CP FITTINGSPILLAR COCK – WASH BASIN- CP, PRAYAG OR EQUIVALENT BIB COCK LONG BODY – BATH- CP, PRAYAG OR EQUIVALENT HEALTH FAUCET FOR EWC- CP, PRAYAG OR EQUIVALENT SINK COCK SWIVEL- CP, PRAYAG OR EQUIVALENT BIB COCK WITH NOZZLE FOR WASH MACHINE-CP, PRAYAG OR EQUIVALENT ANGLE VALVE BELOW WASHBASIN/CISTERN/RO-PVC, PRAYAG OR EQUIVALENT PVC GRATING- PVC, SUPREME OR EQUIVALENT TOWEL ROD-C.P., PRAYAG OR EQUIVALENT
3 . 6 FITTING/FIXTURESWASH BASIN-WHITE CHINA WARE IWC- WHITE CHINAWARE WITH PVC TANK EWC CISTERN- PVC TANK
4 . BED ROOMS
4 . 1 FLOORN/A
4 . 2 WALLSN/A
4 . 3 CEILINGN/A
4 . 4 WARDROBESN/A
5 . TOILET
5 . 1 FLOORN/A
5 . 2 WALLSN/A
5 . 3 CEILINGN/A
5 . 4 COUNTERSN/A
5 . 5 SANITARY WARE/CP FITTINGSN/A
5 . 6 FIXTURESN/A
6 . KITCHEN
6 . 1 FLOORCERAMIC
6 . 2 WALLSOIL BOUND DISTEMPER
6 . 3 CEILINGOIL BOUND DISTEMPER
6 . 4 COUNTERSKOTA STONE OR EQUIVALENT
6 . 5 FIXTURESSS SINK-16’’X16’’, SS-SINGLE BOWL
6 . 6 KITCHEN APPLIANCESN/A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN/A
7 . 2 WALLS & CEILINGN/A
7 . 3 TOILETN/A
7 . 4 BALCONYN/A
8 . SIT-OUTS
8 . 1 FLOORN/A
8 . 2 WALLS & CEILINGN/A
8 . 3 RAILINGSN/A
8 . 4 FIXTURESN/A












Sr. No.Document DescriptionDate of Document UploadView Document
1 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 10-01-2019 View Document
2 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 10-01-2019 View Document
3 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 17-11-2018 View Document
4 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 28-11-2018 View Document
5 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 17-12-2018 View Document