HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-1483-2024
Submission Date : 30-05-2024 01:17:47 AM
Applicant Type : Company
Project Type: NEW




AZUMI DEVELOPERS PVT. LTD.
1962/3, RAJEEV NAGAR GURGAON HARYANA 122001
9891157743
9891157743 (Number Shared by Promoter in Public)
naveenhq@rediffmail.com
XXXX731F
U70109HR2022PTC108777
 
 


 
 


 
 


 
 







MAADHAV GREENS
VILLAGE-LADHUWAS GURJAR, SEC. 34, REWARI,HARYANA
REWARI
REWARI
8882588093
9891157743 (Number Shared by Promoter in Public)
naveenhq@rediffmail.com
VIRENDRA KUMAR
8882588093
9891157743 (Number Shared by Promoter in Public)
naveenhq@rediffmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1115127-05-2024190000HDFC BANK LTDHRERA Panchkula







9 (Acre)
200
200
9 (Acre)
License No.239 of 2023 dated 08.11.2023 valid upto 07.11.2028 obtained from the Director, Towan and country planning Chandigarh.
No
Address     1962/3 RAJEEV NAGAR GURGAON HARYANA 122001
Address     VILLEGE - LADHUWAS GURJAR, POST-SANGWARI , TEHSIL &DIST;. REWARI HARYANA 123401
Address     VILLEGE - LADHUWAS GURJAR, POST-SANGWARI , TEHSIL &DIST;. REWARI HARYANA 123401
Address     VILLEGE - LADHUWAS GURJAR, POST-SANGWARI , TEHSIL &DIST;. REWARI HARYANA 123401
Address     VILLEGE - LADHUWAS GURJAR, POST-SANGWARI , TEHSIL &DIST;. REWARI HARYANA 123401
Address     VILLEGE - LADHUWAS GURJAR, POST-SANGWARI , TEHSIL &DIST;. REWARI HARYANA 123401
Annexure-B- ANNEXURE -B-AS A OWNER AND COLLABORATOR
COLLABORATION AGREEMENT AND GENERAL POWER OF ATTORNEY MADE BEFORE GRANT OF LICENSE
Yes
ALL IMPORTANT DETAILS ARE COVERED IN THE AGREEMENT
No
Yes
Yes







3262.08 Lakhs
704.00 Lakhs
0 Lakhs
1588.08 Lakhs
970.00 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD20073.590
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS8438.270
4PAVEMENTS0
5PARKS AND PLAYGROUNDS2783.000
6GREEN BELTS0
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION26.628
9CLUB HOUSE3643.560
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
13COMMERCIAL1456.660
Total36421.708




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYHSVPNo
ELECTRICITYDHBVNNo
SEWAGE DISPOSALHSVPNo
STORM WATER DRAINAGEHSVPNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS223.00SUBMITTED TO TOWN & COUNTRY PLANNING
2WATER SUPPLY SYSTEM186.5SUBMITTED TO TOWN & COUNTRY PLANNING
3STORM WATER DRAINAGE117.78SUBMITTED TO TOWN & COUNTRY PLANNING
4ELECTRICITY SUPPLY SYSTEM150.00SUBMITTED TO TOWN & COUNTRY PLANNING
5SEWAGE TREATMENT & GARBAGE DISPOSAL100.00AS PER PROJECT REPORT
6STREET LIGHTING34.54SUBMITTED TO TOWN & COUNTRY PLANNING
7SECURITY AND FIRE FIGHTING25.00AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS50.00AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE250.00AS PER PROJECT REPORT
10SHOPPING AREA0SUBMITTED TO TOWN & COUNTRY PLANNING
11RENEWABLE ENERGY SYSTEM0SUBMITTED TO TOWN & COUNTRY PLANNING
12SCHOOL0SUBMITTED TO TOWN & COUNTRY PLANNING
13HOSPITAL/DISPENSARY0SUBMITTED TO TOWN & COUNTRY PLANNING
14ANY OTHER0SUBMITTED TO TOWN & COUNTRY PLANNING
15SEWERAGE123.86SUBMITTED TO TOWN & COUNTRY PLANNING
16PARKING15.00AS PER PROJECT REPORT
17UNDERGROUND WATER TANK37.15AS PER PROJECT REPORT
18RAIN WATER HARVESTING18.00AS PER PROJECT REPORT
19ELECTRICAL SUB STATION62.25AS PER PROJECT REPORT
20EARTH FELLING30.00AS PER PROJECT REPORT
21BOUNDARY WALL125.00AS PER PROJECT REPORT
22MAINTENANCE OF SERVICES FOR TEN YEARS INCLUDING RESURFACING OF ROAD237.21SUBMITTED TO TOWN & COUNTRY PLANNING


NA (date)
NA (date)
01-12-2023
07-11-2028
Plot Area(In Square Meter)Number of plots in the project
150.0040
150.0021
137.6311
92.0013
102.9412
148.404
93.021
102.6013
83.226
94.1015
139.3114
109.6910


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements3030.0030.00
Water Supply System26.501.0025.00
Sewerage treatment & garbage disposal15.0010.0010.00
Electricity Supply System25.0020.0020.00
Storm Water Drainage20.0020.0015.00
Parks and Playgrounds5.005.005.00
Clubhouse/community centres40.0040.0035.00
Shopping area000
Other000
STREET LIGHTING5.005.003.54
SEWERAGE20.0020.0015.86
PARKING2.501.001.00
GATE ENTRY7.007.005.00
BOUNDARY WALL21.0021.0015.00
ELECTRICAL SUB STATION7.007.005.00
RAIN WATER HARVESTING2.002.002.00
UNDER GROUND TANK54.003.00
SECURITY AND FIRE FIGHTING SERVICES2.502.502.50
EARTH FELLING5.003.002.50

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements20.0020.0015.0010.00
Water Supply System20.0015.0010.0010.00
Sewerage treatment & garbage disposal7.007.007.007.00
Electricity Supply System15.0015.0010.0010.00
Storm Water Drainage10.7810.0010.0010.00
Parks and Playgrounds5.005.004.004.00
Clubhouse/community centres22.0020.0015.0010.00
Shopping area0000
Other0000
PARKING111.001.00
SEWERAGE151010.0010.00
STREET LIGHTING332.002.00
UNDER GROUND TANK322.002.00
RAIN WATER HARVESTING1.51.51.501.50
ELECTRICAL SUB STATION5.0044.004.00
EARTH FELLING2.5022.002.00
BOUNDARY WALL15.001010.0010.00
GATE ENTRY3.0032.002.00
SECURITY AND FIRE FIGHTING SERVICES222.002.00

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.0010.0010.0010.00
Water Supply System7.007.007.007.00
Sewerage treatment & garbage disposal5.05.005.005.00
Electricity Supply System5.005.005.005.00
Storm Water Drainage5.005.002.002.00
Parks and Playgrounds3.003.002.002.00
Clubhouse/community centres10.0010.0010.0010.00
Shopping area0000
Other0000
RAIN WATER HARVESTING1.001.001.001.00
PARKING1.001.001.001.00
SEWERAGE5.005.002.002.00
STREET LIGHTING2.002.001.001.00
SECURITY AND FIRE FIGHTING SERVICES1.501.501.251.25
UNDER GROUND TANK2.002.002.002.00
ELECTRICAL SUB STATION4.003.003.003.00
GATE ENTRY2.002.001.001.00
BOUNDARY WALL5.005.002.002.00
EARTH FELLING2.002.001.001.00

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.005.005.005.00
Water Supply System7.005.005.005.00
Sewerage treatment & garbage disposal4.004.004.003.00
Electricity Supply System5.003.003.003.00
Storm Water Drainage2.002.001.001.00
Parks and Playgrounds1.501.501.501.00
Clubhouse/community centres10.005.005.005.00
Shopping area0000
Other0000
RAIN WATER HARVESTING0.500.500.250.25
PARKING0.500.500.500.50
SEWERAGE2.002.002.001.00
STREET LIGHTING1.001.001.001.00
SECURITY AND FIRE FIGHTING SERVICES1.001.001.000.50
GATE ENTRY1.001.001.001.00
BOUNDARY WALL2.002.002.001.00
EARTH FELLING1.001.001.001.00
ELECTRICAL SUB STATION3.002.502.502.50
UNDER GROUND TANK1.501.501.501.50

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements2.001.00
Water Supply System3.002.00
Sewerage treatment & garbage disposal1.001.00
Electricity Supply System0.500.50
Storm Water Drainage1.001.00
Parks and Playgrounds1.000.50
Clubhouse/community centres2.001.00
Shopping area00
Other00
GATE ENTRY0.500.50
BOUNDARY WALL1.001.00
EARTH FELLING0.500.50
ELECTRICAL SUB STATION2.000.75
RAIN WATER HARVESTING0.250.25
UNDER GROUND TANK1.500.65
SECURITY AND FIRE FIGHTING SERVICES0.500
STREET LIGHTING0.500.50
SEWERAGE1.001.00
PARKING0.250.25












Yes
No
HDFC BANK LTD-PALM SQUARE SECTOR 66 GF 2 & 3 GOLF COURSE EXTATION GURGAON HARYANA-12202
50200089319214
HDFC0009110
1102409492
9110
Mr. Chidamber Sharma , 1-A-207, NH-1 FARIDABAD NIT HARYANA 121001
Uploaded











Yes
Yes
Yes
No
No
No
No
No
No
Yes


Yes
Yes
Yes
Yes
Yes
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. 1.LICENSE NO.239 OF 2023ALREADY BEEN OBTAINED08-11-2023
II. 2. ZONING PLAN (DRG. NO. DGTCP 10150ALREADY BEEN OBTAINED22-03-2024
III. 3. FOREST NOCALREADY BEEN OBTAINED06-07-2023
IV. SERVICE PLAN AND ESTIMATEAPPLIED FOR BUT YET TO RECEIVE23-02-2024








Yes


Yes


Provided













SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
2WALL FINISHING DETAILSNOT APPLICABLE
3KITCHEN DETAILSNOT APPLICABLE
4BATHROOM FITTINGSNOT APPLICABLE
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESNOT APPLICABLE
7GLASS WORKNOT APPLICABLE
8ELECTRIC FITTINGSNOT APPLICABLE
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGENOT APPLICABLE
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSNOT APPLICABLE
13.1WINDOWS/GLAZINGSNOT APPLICABLE
14DOORSNOT APPLICABLE
14.1MAIN DOORSNOT APPLICABLE
14.2INTERNAL DOORSNOT APPLICABLE
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSNOT APPLICABLE
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
20INTERNAL FINISHINGNOT APPLICABLE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE
1 . 2 WALLSNOT APPLICABLE
1 . 3 CEILINGNOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE
2 . 2 WALLSNOT APPLICABLE
2 . 3 CEILINGNOT APPLICABLE
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE
3 . 2 WALLSNOT APPLICABLE
3 . 3 CEILINGNOT APPLICABLE
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
3 . 6 FITTING/FIXTURESNOT APPLICABLE
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE
4 . 2 WALLSNOT APPLICABLE
4 . 3 CEILINGNOT APPLICABLE
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORNOT APPLICABLE
5 . 2 WALLSNOT APPLICABLE
5 . 3 CEILINGNOT APPLICABLE
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
5 . 6 FIXTURESNOT APPLICABLE
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE
6 . 2 WALLSNOT APPLICABLE
6 . 3 CEILINGNOT APPLICABLE
6 . 4 COUNTERSNOT APPLICABLE
6 . 5 FIXTURESNOT APPLICABLE
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGNOT APPLICABLE
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYNOT APPLICABLE
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND28-05-2024 View Document
2GST CERTIFICATE OF COMPANY AZUMI28-05-2024 ------
3FOREST NOC 28-05-2024 ------
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN28-05-2024 View Document
5NOC FROM DEPUTY COMMISSIONER28-05-2024 ------
6INVENTORY DETAILS29-05-2024 ------
7PROJECT REPORT28-05-2024 ------
8SECTOR PLAN-34 REWARI28-05-2024 ------
9PERT CHART-IDW AND PROJECT COST28-05-2024 ------
10GOOGLE LOCATION MAP29-05-2024 ------
11GENERAL POWER OF ATTORNEY(GPA)28-05-2024 ------
12CERTIFICATE OF INCORPORATION AZUMI28-05-2024 ------
13LOCATION GOOGLE MAP29-05-2024 ------
14PERMISSIBLE AREA DETAIL29-05-2024 ------
15CASH FLOW STATEMENT OF THE PROPOSED PROJECT29-05-2024 View Document
16ZONING PLAN28-05-2024 View Document
17COPY OF SALE DEED DRAFT28-05-2024 ------
18LIST OF SHAREHOLDERS28-05-2024 ------
19LIST OF DIRECTORS28-05-2024 ------
20COLLABORATION SUPPLEMENTARY DOCUMENT 28-05-2024 ------
21RERA ACCOUNTS-3 NOS28-05-2024 ------
22DEMAND DRAFT 28-05-2024 ------
23AUDITORS REPORT/BALANCE SHEET/DIRECTOR'S REPORT29-05-2024 ------
24IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN29-05-2024 View Document
25AGREEMENT FOR SALE 28-05-2024 ------
26AKS-SHIJARA28-05-2024 ------
27BR FOR AUTHORISED SIGNATORY28-05-2024 ------
28FINAL DEVELOPMENT PLAN REWARI29-05-2024 ------
29TAXIM AND SALE DEED INTKAL28-05-2024 ------
30CA-MR RAVI MALU28-05-2024 ------
31SERVICE PLAN ESTIMATES APPROVED BY HSVP28-05-2024 ------
32CONVEYANCE DEED 28-05-2024 ------
33ARCHITECT - MR. MAYUR GOEL28-05-2024 ------
34JAMABANDI29-05-2024 ------
35REVENUE SEARCH REPORT29-05-2024 ------
36LC-IV(AGREEMENT)28-05-2024 ------
37DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.29-05-2024 View Document
38NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT28-05-2024 View Document
39DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD28-05-2024 View Document
40DEMARCATION PLAN28-05-2024 View Document
41LOI - AZUMI28-05-2024 ------
42ALLOTMENT LETTER DRAFT28-05-2024 ------
43LC-IV-B(BILATERAL AGREEMENT)28-05-2024 ------
44BR AND AUTHORISED SIGNATORY-BANK ACCOUNT28-05-2024 ------
45PAN OF COMPANY AZUMI28-05-2024 ------
46AOA/MOA/FORM NO. SH-7/FORM NO.-INC-3329-05-2024 ------
47TAN OF COMPANY AZUMI29-05-2024 ------
48CLUB PERMISSION 29-05-2024 ------
49A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS29-05-2024 View Document