UNIT NO. 912, TOWER-B, EMAAR DIGITAL GREENS, SECTOR-61, GURUGRAM-122102
01244488063
8178464761 (Number Shared by Promoter in Public)
admin@jmkbuild.in
Https://www.jmkbuild.in
XXXX458L
U70109HR2010PTC041267
GREEHAA FLOORS (PHASE-II)
POCKET L, SECTOR 8, MODEL ECONOMIC TOWNSHIP (MET CITY), VILLAGE YAKUBPUR, TEHSIL- BADLI, ON STATE HIGHWAY-15A, HARYANA -124515
BADLI
JHAJJAR
0000000000
8052331298 (Number Shared by Promoter in Public)
admin@jmkbuild.in
SUNIL KUMAR YADAV
0000000000
8052331298 (Number Shared by Promoter in Public)
admin@jmkbuild.in
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
514439
25-05-2023
33000.00
ICICI BANK, VIPUL ORCHID PLAZA, SECTOR-54, SUNCITY, GURUGRAM-122003
HRERA Panchkula
0.27 (Acre)
200
264
1016.10 (Acre)
License No 06 of 2012 dated 01.02.2012, 16 of 2018 dated 23.02.2018, 129 of 2019 dated 04.12.2019 and 11 of 2021 dated 12.03.2021 in the name of M/s. Model Economic Township Limited.
Yes
1254.69 Lakhs
356.69 Lakhs
772.00 Lakhs
0 Lakhs
126.00 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
1094.80
3
CONSTRUCTION OF ROADS
0
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
0
6
GREEN BELTS
0
7
VEHICLE PARKINGS
0
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0
Total
1094.8
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
PWD
Yes
WATER SUPPLY
METL
Yes
ELECTRICITY
UHBVNL
Yes
SEWAGE DISPOSAL
IRRIGATION DEPARTMENT
Yes
STORM WATER DRAINAGE
IRRIGATION DEPARTMENT
Yes
LAYOUT PLAN
DTP, JHAJJAR
Yes
ZONING PLAN
DTCP, CHANDIGARH
Yes
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
0
YET TO BE PREPARED
2
WATER SUPPLY SYSTEM
0
YET TO BE PREPARED
3
STORM WATER DRAINAGE
0
YET TO BE PREPARED
4
ELECTRICITY SUPPLY SYSTEM
0
YET TO BE PREPARED
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
0
YET TO BE PREPARED
6
STREET LIGHTING
0
YET TO BE PREPARED
7
SECURITY AND FIRE FIGHTING
0
YET TO BE PREPARED
8
PLAYGROUNDS AND PARKS
0
YET TO BE PREPARED
9
CLUB HOUSE/COMMUNITY CENTRE
0
YET TO BE PREPARED
10
SHOPPING AREA
0
YET TO BE PREPARED
11
RENEWABLE ENERGY SYSTEM
0
YET TO BE PREPARED
12
SCHOOL
0
YET TO BE PREPARED
13
HOSPITAL/DISPENSARY
0
YET TO BE PREPARED
14
ANY OTHER
0
YET TO BE PREPARED
17-05-2023 (date)
17-05-2023 (date)
18-05-2023
17-05-2025
Plot Area(In Square Meter)
Number of plots in the project
0
0
Type
Carpet area(In Square Meter)
Number of apartments
Number of towers
Apartment/Shops/Other Buildings
79.973
30
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
0
Shops
0
Plots
0
Land Cost
356.69
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2023
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
98
97
Shops
0
0
Plots
0
0
Others
17
17
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
97
95
96
95
Shops
0
0
0
0
Plots
0
0
0
0
Others
16
17
15
16
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
98
96
Shops
0
0
Plots
0
14
Others
15
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
0
Water Supply System
0
Sewerage treatment & garbage disposal
0
Electricity Supply System
0
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Expenditure to be made in each quarter (2025)
Apr-June
July-Sep
Oct-Dec
Jan-Mar
Yes
No
ICICI BANK LIMITED, VIPUL, ORCHID PLAZA, SECTOR-54, SUNCITY, GURUGRAM, HARYANA-122003
777705004339
ICIC0000399
110229060
399
1. Mohammad Arif
2. Dipak Chakraborty
Yes
No
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
Yes
Statutory Approvals
Statutory Approvals Status
Date
I. BUILDING PLAN
ALREADY BEEN OBTAINED
17-05-2023
Yes
Yes
Name of project "Greehaa Floors (Phase-II)", Nature of project-Residential Floors, Total No. of Plots are 10, size of each plot is 109.480 Sqm., we will construct stilt + 3 floors on each plot.
3BHK, 2 toilet, kitchen and drawing room area of flat 796.239 Sqft. Stilt area for car parking for each flat.
GREEHAA FLOORS (PHASE-I), POCKET L, SECTOR 8, MODEL ECONOMIC TOWNSHIP (MET CITY), VILLAGE YAKUBPUR, TEHSIL- BADLI, ON STATE HIGHWAY-15A, HARYANA -124515
1094.80
40
10
26
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
1034.22
1034.22
407.02
Cost of the apartments
800.00
800.00
245.74
Cost of the infrastructure
0
0
0
Others costs
234.22
234.22
161.28
249.05 Lakhs
790.95 Lakhs
0 Lakhs
0 Lakhs
No
14-01-2024
14-01-2024
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
VERTIFIED GLAZED TILES.
2
WALL FINISHING DETAILS
TEXTURE PAINT WEATHER RESISTANT AND PLASTIC PAINT.
3
KITCHEN DETAILS
COUNTER TOP FOR KITCHEN, SINGLE BOWL STAINLESS STEEL SINK (AS PER SPACE), CERAMIC TILES (2 FT ABOVE COUNTER AND 5FT ABOVE FLOOR ON NON-COUNTER WALLS.
4
BATHROOM FITTINGS
KEROVIT BY KAJARIA AND THE LIKES, KEROVIT AND LIKES, COUNTER TOP FOR BASIN.
5
WOOD WORK ETC
WOOD WORK-BOTH UNDER & ABOVE THE COUNTER, WARDROBE IN TWO OF THE BEDROOMS
6
DOORS AND WINDOS FRAMES
32 MM THICK-FLUSH DOOR WITH BOTH SIDE LAMINATION-FLUSH DOOR, COMMERCIAL FLUSH DOOR PAINTED WITH ENAMEL PAINT, DOOR G AND EQUIVALENT, UPVC.
7
GLASS WORK
UPVC
8
ELECTRIC FITTINGS
COPPER ELECTRICAL WIRING THROUGHOUT IN CONCEALED CONDUIT FOR LIGHT POINTS.
9
CONDUCTING AND WIRING DETAILS
POWER PINTS, T.V. & PHONE SOCKETS WITH MCBS, MODULAR SWITCHES INCLUDING 16 AMP SWITCH/ SOCKET IN EACH ROOM, AC SOCKET IN BEDROOMS AND LIVING ROOM.
10
CUPBOARD DETAILS
WARDROBE IN TWO OF THE BEDROOMS.
11
WATER STORAGE
PVC TANK.
12
LIFT DETAILS
ECE INDUSTRIES LTD.
13
EXTERNAL GLAZINGS
NIL
13.1
WINDOWS/GLAZINGS
UPVC
14
DOORS
WOODEN FLUSH DOOR
14.1
MAIN DOORS
WOODEN FLUSH DOOR
14.2
INTERNAL DOORS
WOODEN FLUSH DOOR
15
AIR CONDITIONING
NIL
16
ELECTRICAL FITTINGS
LED BULBS, MODULAR SMART FANS, EXHAUST FANS, CHIMNEY, GAS STOVE, GEYSER, ETC.
CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT