HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-1280-2023
Submission Date : 23-05-2023 04:47:59 PM
Applicant Type : Company
Project Type: NEW




MODEL ECONOMIC TOWNSHIP LIMITED
3RD FLOOR, 77-B, IFFCO ROAD, SECTOR 18 GURUGRAM- 122015
1243527369
9910612499 (Number Shared by Promoter in Public)
shankar.mukkavilli@ril.com
http://www.modeleconomictownship.com
XXXX037Q
U70109HR2006PLC036416
 
 


 
 


 
 


 
 


 
 


 
 


 
 







MET HABITAT
SECTOR-3, DADRI TOE, MODEL ECONOMIC TOWNSHIP LIMITED
BADLI
JHAJJAR
9998987100 (Number Shared by Promoter in Public)
rakesh.b.sinha@ril.com
RAKESH B SINHA
01243527369
9998987100 (Number Shared by Promoter in Public)
rakesh.b.sinha@ril.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
156139104-05-2023450000HDFC BANKHRERA Panchkula







20.39515 (Acre)
0
0
776.9747 (Acre)
L-214 OF 2022 valid till 29.12.2027
Yes







5018 Lakhs
2383 Lakhs
0 Lakhs
2593 Lakhs
42 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD9.7292
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS2.24095
4PAVEMENTS0
5PARKS AND PLAYGROUNDS8.09600
6GREEN BELTS0.25
7VEHICLE PARKINGS0
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0.079
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER0
Total20.39515




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSPWDYes
WATER SUPPLYIRRIGATION DEPT.Yes
ELECTRICITYUHBVNNo
SEWAGE DISPOSALHSVP DEPT. GOHYes
STORM WATER DRAINAGEHSVP DEPT. GOHYes
LAYOUT PLANDTCP,HARYANAYes
LICENSE FOR PROJECTDTCP,HARYANAYes
ZONING PLANDTCP,HARYANANo
SERVICE PLAN ESTIMATE DTCP,HARYANANo
ENVIRONMENTAL CLEARANCEMOEFYes
CTE PERMISSION HARYANA STATE POLLUTION CONTROL BOARDYes




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS573YET TO BE PREPARED
2WATER SUPPLY SYSTEM123YET TO BE PREPARED
3STORM WATER DRAINAGE144YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM487YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL135YET TO BE PREPARED
6STREET LIGHTING31YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15HORTICULTURE500YET TO BE PREPARED
16CONSULTANCY FEES AND GATE COMPLEX ETC600YET TO BE PREPARED


30-12-2022 (date)
NA (date)
01-04-2023
31-03-2028
Plot Area(In Square Meter)Number of plots in the project
469.003
469.251
499.808
421.4024
453.154
454.003
410.791
440.281
223.461
223.732
224.031
373.732
374.111
321.004
300.0047
1229.971
728.201


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings000





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops0
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsExpenditure to be made in each quarter ()
Apr-JuneJuly-SepOct-DecJan-Mar




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System25
Sewerage treatment & garbage disposal0
Electricity Supply System45
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
Consultancy Fees And Gate complex etc0
Horticulture0
Street Lighting0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements2334
Water Supply System46
Sewerage treatment & garbage disposal58
Electricity Supply System2727
Storm Water Drainage69
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Consultancy Fees And Gate complex etc2436
Street Lighting22
Horticulture00

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements37373429
Water Supply System6665
Sewerage treatment & garbage disposal9887
Electricity Supply System29243335
Storm Water Drainage9997
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Lighting2222
Consultancy Fees And Gate complex etc39393630
Horticulture00050

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements29342337
Water Supply System5647
Sewerage treatment & garbage disposal7859
Electricity Supply System35332929
Storm Water Drainage79610
Parks and Playgrounds0000
Clubhouse/community centres0200
Shopping area05000
Other03600
Horticulture504050
Consultancy Fees And Gate complex etc302436
Street Lighting222

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements34341515
Water Supply System7754
Sewerage treatment & garbage disposal9975
Electricity Supply System33341212
Storm Water Drainage101076
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Street Lighting2221
Horticulture50504040
Consultancy Fees And Gate complex etc36302520

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements1524
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System1217
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00
Consultancy Fees And Gate complex etc1320
Street Lighting10
Horticulture2060












Yes
No
ICICI BANK SECTOR 5 , VILLAGE DADRI TOE , JHAJJAR HARYANA- 124515
459405000002
ICIC0004594
124229056
004594
Mr. Sudhir Jain/ Mr. Ashish Jain/ Mr. Amit Kumar Garg C/o Model Economic Township Limited, 3rd Floor, 77-B, IFFCO Road, Sector-18, Gurugram-122015, Haryana
Attached











Yes
Yes
No
No
No
No
No
No
No
No


Yes
No
Yes
Yes
Yes
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. LAYOUT PLANALREADY BEEN OBTAINED30-12-2022








Yes


Yes


NA







INDUSTRIAL COLONY FOR 125.36 ACRES IN SECTOR – 2B, VILLAGE SHEOJIPURA, DIST. JHAJJAR (AS ON 31 MAR, 2023)
125.36
0
87
0
65
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
8765101112899
Cost of the apartments000
Cost of the infrastructure838237472534
Others costs383364365


21205.45 Lakhs
10332.46 Lakhs
0 Lakhs
0 Lakhs
No
31-03-2027
31-03-2027




A COMMERCIAL PLOT (SUPERMART) OF 3.356 ACRES, PART OF INDUSTRIAL TOWNSHIP OF 1034.59375 ACRES IN VILLAGE YAKUBPUR, DIST. JHAJJAR (AS ON 31 MAR, 2023)
3.356
0
50
0
41
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11241265154
Cost of the apartments000
Cost of the infrastructure11081253141
Others costs161313


2684.3 Lakhs
1706.73 Lakhs
0 Lakhs
0 Lakhs
No
30-06-2027
30-06-2027




A COMMERCIAL PLOT (HIGHWAY MART) OF 4.96 ACRES, PART OF INDUSTRIAL TOWNSHIP OF 1034.59375 ACRES IN VILLAGE YAKUBPUR, DIST. JHAJJAR (AS ON 31 MAR, 2023)
4.96
0
69
0
38
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
11242021995
Cost of the apartments000
Cost of the infrastructure11082006980
Others costs161515


2947.38 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-03-2024
01-03-2024




INDUSTRIAL RESIDENTIAL COLONY FOR 85.703 ACRES IN SECTOR 10A, VILLAGE SONDHI, DIST. JHAJJAR (AS ON 31 MAR, 2023)
85.703
0
52
0
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
65366602601
Cost of the apartments000
Cost of the infrastructure63666453451
Others costs170149149


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-11-2027
30-11-2027




INDUSTRIAL COLONY FOR 54.638 ACRES IN SECTOR – 8, POCKET J & K, VILLAGE YAKUBPUR & SONDHI, DIST. JHAJJAR (AS ON 31 MAR, 2023)
54.638
0
684
0
663
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
605276131323
Cost of the apartments000
Cost of the infrastructure587274491150
Others costs173182172


19312.53 Lakhs
21793.33 Lakhs
0 Lakhs
0 Lakhs
No
31-05-2027
31-05-2027




INDUSTRIAL COLONY FOR 34.931 ACRES IN SECTOR – 8, POCKET C & D, VILLAGE YAKUBPUR & SONDHI, DIST. JHAJJAR (AS ON 31 MAR, 2023)
34.931
0
540
0
290
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
41525186232
Cost of the apartments000
Cost of the infrastructure40775102147
Others costs758585


3818.73 Lakhs
16762.1 Lakhs
0 Lakhs
0 Lakhs
No
30-11-2027
30-11-2027




INDUSTRIAL COLONY OVER 258.44 ACRES IN VILLAGE DADRI TOI AND BIR DADRI, DIST. JHAJJAR (AS ON 31 MAR, 2023)
258.44
0
121
0
77
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
14246.082484722717
Cost of the apartments000
Cost of the infrastructure13251.882383121701
Others costs994.210161016


36726.03 Lakhs
720 Lakhs
0 Lakhs
0 Lakhs
No
30-09-2022
30-06-2023




INDUSTRIAL COLONY FOR 79.756 ACRES IN VILLAGE DADRI TOI, SONDHI AND YAKUBPUR, DIST. JHAJJAR (AS ON 31 MAR 2023)
79.756
0
812
0
797
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
13237121816705
Cost of the apartments000
Cost of the infrastructure12363119646488
Others costs874217217


23636.18 Lakhs
4342.41 Lakhs
0 Lakhs
0 Lakhs
No
30-06-2026
30-06-2026




INDUSTRIAL COLONY FOR 68.325 ACRES IN VILLAGE DADRI TOI, SONDHI AND YAKUBPUR, DIST. JHAJJAR (AS ON 31 MAR, 2023)
68.325
0
103
0
85
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
341067994684
Cost of the apartments000
Cost of the infrastructure324566034518
Others costs165196165


18835.87 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
30-12-2024
30-09-2025




INDUSTRIAL COLONY FOR 557.777 ACRES IN VILLAGE DADRI TOI, SONDHI AND YAKUBPUR, DIST. JHAJJAR (AS ON 31 MAR, 2023)
557.777
0
282
0
262
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
317294892636045
Cost of the apartments000
Cost of the infrastructure301564731534477
Others costs157316111568


91380.47 Lakhs
257.73 Lakhs
0 Lakhs
0 Lakhs
No
11-05-2024
11-02-2025










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENOT APPLICABLE
2WALL FINISHING DETAILSNOT APPLICABLE
3KITCHEN DETAILSNOT APPLICABLE
4BATHROOM FITTINGSNOT APPLICABLE
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESNOT APPLICABLE
7GLASS WORKNOT APPLICABLE
8ELECTRIC FITTINGSNOT APPLICABLE
9CONDUCTING AND WIRING DETAILSNOT APPLICABLE
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGENOT APPLICABLE
12LIFT DETAILSNOT APPLICABLE
13EXTERNAL GLAZINGSNOT APPLICABLE
13.1WINDOWS/GLAZINGSNOT APPLICABLE
14DOORSNOT APPLICABLE
14.1MAIN DOORSNOT APPLICABLE
14.2INTERNAL DOORSNOT APPLICABLE
15AIR CONDITIONINGNOT APPLICABLE
16ELECTRICAL FITTINGSNOT APPLICABLE
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYNOT APPLICABLE
19EXTERNAL FINISHING/COLOUR SCHEMENOT APPLICABLE
20INTERNAL FINISHINGNOT APPLICABLE
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNOT APPLICABLE
1 . 2 WALLSNOT APPLICABLE
1 . 3 CEILINGNOT APPLICABLE
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNOT APPLICABLE
2 . 2 WALLSNOT APPLICABLE
2 . 3 CEILINGNOT APPLICABLE
2 . 4 MODULAR WARDROBESNOT APPLICABLE
3 . MASTER TOILET
3 . 1 FLOORNOT APPLICABLE
3 . 2 WALLSNOT APPLICABLE
3 . 3 CEILINGNOT APPLICABLE
3 . 4 COUNTERSNOT APPLICABLE
3 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
3 . 6 FITTING/FIXTURESNOT APPLICABLE
4 . BED ROOMS
4 . 1 FLOORNOT APPLICABLE
4 . 2 WALLSNOT APPLICABLE
4 . 3 CEILINGNOT APPLICABLE
4 . 4 WARDROBESNOT APPLICABLE
5 . TOILET
5 . 1 FLOORNOT APPLICABLE
5 . 2 WALLSNOT APPLICABLE
5 . 3 CEILINGNOT APPLICABLE
5 . 4 COUNTERSNOT APPLICABLE
5 . 5 SANITARY WARE/CP FITTINGSNOT APPLICABLE
5 . 6 FIXTURESNOT APPLICABLE
6 . KITCHEN
6 . 1 FLOORNOT APPLICABLE
6 . 2 WALLSNOT APPLICABLE
6 . 3 CEILINGNOT APPLICABLE
6 . 4 COUNTERSNOT APPLICABLE
6 . 5 FIXTURESNOT APPLICABLE
6 . 6 KITCHEN APPLIANCESNOT APPLICABLE
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNOT APPLICABLE
7 . 2 WALLS & CEILINGNOT APPLICABLE
7 . 3 TOILETNOT APPLICABLE
7 . 4 BALCONYNOT APPLICABLE
8 . SIT-OUTS
8 . 1 FLOORNOT APPLICABLE
8 . 2 WALLS & CEILINGNOT APPLICABLE
8 . 3 RAILINGSNOT APPLICABLE
8 . 4 FIXTURESNOT APPLICABLE












Sr. No.Document DescriptionDate of Document UploadView Document
1NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT04-05-2023 View Document
2IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN04-05-2023 View Document
3IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN04-05-2023 View Document
4COPY OF LICENSE ALONG WITH SCHEDULE OF LAND04-05-2023 View Document
5DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.04-05-2023 View Document
6NO DEFAULT CERTIFICATE FROM CA27-06-2023 ------
7COPY OF LICENSE WITH SCHEDULE OF LAND27-06-2023 ------
8DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER27-06-2023 ------
9LATEST LAYOUT PLAN27-06-2023 ------