HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-327-2018
Submission Date : 13-11-2018 12:51:34 PM
Applicant Type : Registered Society or Trust or Authority
Project Type: ONGOING




ESTATE OFFICER HSVP ROHTAK
HSVP BUILDING, SECTOR-3, ROHTAK
01262279839
9812562240 (Number Shared by Promoter in Public)
eorohtakhuda2@gmail.com
https://hsvphry.org.in
XXXX087M
NA
AS PER HSVP ACT 1977
 
 


 
 











SECTOR-21 COMMERCIAL ROHTAK
ESTATE OFFICE HSVP ROHTAK
ROHTAK
ROHTAK
01262279839
9812562240 (Number Shared by Promoter in Public)
eorohtakhuda2@gmail.com
ESTATE OFFICE HSVP ROHTAK
01262279839
9812562240 (Number Shared by Promoter in Public)
eorohtakhuda2@gmail.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1172712-11-20182110640HDFC BANK HRERA Panchkula







94.60 (Acre)
137906
182
85.87 (Acre)
DTP(R)1980/18 dated 03.04.2018
Yes







4416381311 Lakhs
687411311 Lakhs
0 Lakhs
513970000 Lakhs
3215000000 Lakhs




Sr. No.Land area under usageArea of land (Acres)
1PLOTS TO BE SOLD 642
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS 0
3CONSTRUCTION OF ROADS 0
4PAVEMENTS 0
5PARKS AND PLAYGROUNDS 0
6GREEN BELTS 0
7VEHICLE PARKINGS 0
8ELECTRICITY SUB-STATION 0
9CLUB HOUSE 0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY 0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES 0.39
12ANY OTHER 0
13AREAUNDERSECTORROAD 8.23
14AREABOOSTINGSTATION 0.50
15NETPLANNEDAREA 85.87
16AREAUNDERSHOP 27.698
17DISPENSARY 0.25
18PUBLICUTILITYSERVICE 0.34
19ROADSPARKINGPAVEMENTGREENBELT 57.192
20GREENBELT 23.57
Total846.04




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSHSVPNo
WATER SUPPLYPUBLIC HEALTH ENGINEERING DEPARTMENTYes
ELECTRICITYRELATES TO E.E. (ELECT.)No
SEWAGE DISPOSALPUBLIC HEALTH ENGINEERING DEPARTMENTNo
STORM WATER DRAINAGEPUBLIC HEALTH ENGINEERING DEPARTMENTNo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS3606.50YET TO BE PREPARED
2WATER SUPPLY SYSTEM102.65YET TO BE PREPARED
3STORM WATER DRAINAGE428.35YET TO BE PREPARED
4ELECTRICITY SUPPLY SYSTEM125.47YET TO BE PREPARED
5SEWAGE TREATMENT & GARBAGE DISPOSAL128.70YET TO BE PREPARED
6STREET LIGHTING131.53YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING25YET TO BE PREPARED
8PLAYGROUNDS AND PARKS0.405YET TO BE PREPARED
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY343.45YET TO BE PREPARED
14ANY OTHER0YET TO BE PREPARED
15ANY OTHERLIMEASH206.50YET TO BE PREPARED


03-04-2018 (date)
03-04-2018 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartments Total number of plots/apartments in the project Total size of the plots/carpet area of the apartments Plots/apartments booked/ sold upto the date of application Yet to be sold/ booked No. of towers to be/ being constructed for booked apartments
1 APARTMENT/SHOPS/OTHER BUILDINGS Type IRON & STEEL SHOPS (WITH DOUBLE STOREY OFFICE BLOCK) 1944 12 23328 0 12 0
2 APARTMENT/SHOPS/OTHER BUILDINGS Type CORNER SHOPS 657.936 4 2631.744 0 4 0
3 APARTMENT/SHOPS/OTHER BUILDINGS Type WOOD/ TIMBER SHOPS (WITH DOUBLE STOREY OFFICE BLOCK) 60685.62 182 11044782.84 0 182 0
4 APARTMENT/SHOPS/OTHER BUILDINGS Type CORNER SHOPS 10212.28 30 306368.4 0 30 0
5 APARTMENT/SHOPS/OTHER BUILDINGS Type WOOD/ TIMBER SHOPS (WITH DOUBLE STOREY OFFICE BLOCK) 39465.93 178 7024935.54 0 178 0
6 APARTMENT/SHOPS/OTHER BUILDINGS Type CORNER SHOPS 7292.80 32 233369.6 0 32 0
7 APARTMENT/SHOPS/OTHER BUILDINGS Type DOUBLE STOREY SHOPS (WITH BASEMENT) 11797.5 100 1179750 0 100 0
8 APARTMENT/SHOPS/OTHER BUILDINGS Type CORNER SHOPS 1474.990 12 17699.88 0 12 0
9 APARTMENT/SHOPS/OTHER BUILDINGS Type DHABAS (DOUBLE STOREY WITH BASEMENT) 181.50 2 363 0 2 0
10 APARTMENT/SHOPS/OTHER BUILDINGS Type CORNER DHABAS 189.09 2 378.18 0 2 0
11 APARTMENT/SHOPS/OTHER BUILDINGS Type BOOTHS (WITH STORAGE ON FIRST FLOOR WITH BASEMENT) 3720.75 82 305101.5 0 82 0
12 APARTMENT/SHOPS/OTHER BUILDINGS Type CORNER BOOTHS 283.635 6 1701.81 0 6 0
Total64220140410.49406420






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
NA0NA


31-03-2013
31-03-2022
31-03-2022
31-03-2013
40
31-03-2022


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT0NA
31-03-2013
40
31-03-2022
NA
NA


0
0
0
100
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments00
Shops4842.154842.15
Plots00

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops4842.12
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2017
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements00
Water Supply System00
Sewerage treatment & garbage disposal00
Electricity Supply System00
Storm Water Drainage00
Parks and Playgrounds00
Clubhouse/community centres00
Shopping area00
Other00

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements3606.50
Water Supply System102.65
Sewerage treatment & garbage disposal128.70
Electricity Supply System0
Storm Water Drainage429.35
Parks and Playgrounds0
Clubhouse/community centres343.45
Shopping area0
Other0
LimeAsh206.50
FirFighting25.00

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements3606.50
Water Supply System102.65
Sewerage treatment & garbage disposal128.70
Electricity Supply System130.54
Storm Water Drainage429.35
Parks and Playgrounds40.55
Clubhouse/community centres0
Shopping area0
Other0












Particulars Remarks, if any
i. No. of Flats/Apartments constructed0NA
ii. No. of Flats/ Apartments booked0NA
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter0 LakhsNA
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter0 LakhsNA
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter0 LakhsNA
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter0 LakhsNA
vii. Amount invested in the project upto the date of application0 LakhsNA
Land cost (If any)687411311 Lakhs
Apartments0 Lakhs
Infrastructure513970000 Lakhs
EDC/ Taxes Etc.3215000000 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession0 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 LakhsNa
x. Total liabilities against the project up-to-date. (Annex details in folder C) 0 LakhsNA



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS3606.501629.23
II. WATER SUPPLY SYSTEM102.65121.91
III. STORM WATER DRAINAGE428.350
IV. ELECTRICITY SUPPLY SYSTEM00
V. SEWAGE TREATMENT & GARBAGE DISPOSAL128.70104.14
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM25.000
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
No
PNB MANIMAJRA
1183005900001699
PUNB0118300
00
PUNB0118300
CA, HSVP, Panchkula.
NA











Yes
No
No
No
Yes
No
No
No
Yes
Yes


Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Statutory Approvals Statutory Approvals StatusDate
I. CA, HSVP, PANCHKULAALREADY BEEN OBTAINED03-04-2018








No


No


NA







SECTOR-14 (PART-II) AND SECTOR33(PART-1)
0
2878
0
0
2878
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
05-05-2013
05-05-2013




MANDI TOWNSHIP KALANWALI (SIRSA)
0
0
903
0
903
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
10-03-2014
03-10-2019




RESIDENTIAL SECTOR-32 (PART-1) & 33 (PART) KARNAL
0
0
1135
0
1135
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
12-03-2014
12-03-2019




RESIDENTIAL SECTOR-30 PINJORE
0
0
901
0
901
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
12-03-2014
12-03-2019




SECTOR-56A FARIDABAD
0
0
453
0
453
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-09-2014
01-10-2019




SECTOR-12 PALWAL
0
0
333
0
333
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-09-2014
01-10-2019




SECTOR-11 FATEHABAD
0
0
891
0
891
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
08-10-2014
08-10-2019




SECTOR-27 AMBALA
0
0
474
0
474
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
08-10-2014
08-10-2019




SECTOR-1 TARAORI
0
0
617
0
617
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
12-10-2014
12-10-2019




SECTOR-8 DADRI
0
0
225
0
225
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
14-08-2015
14-08-2020




SECTOR-9 DADRI
0
0
297
0
297
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
14-08-2015
14-08-2020




SECTOR-7 SAFIDON
0
0
334
0
334
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
14-08-2015
14-08-2020




SECTOR-77 & 78 FARIDABAD
0
0
654
0
654
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
19-10-2015
19-10-2020




SECTOR-10, BAHADURGARH
0
0
540
0
540
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
21-09-2016
21-09-2021




SECTOR-21 (PART) ROHTAK
0
0
249
0
249
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
28-12-2016
28-12-2021




SECTOR-9A, 10 & 11(P)J MAHENDRAGARH
0
0
105
0
105
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
28-12-2016
28-12-2021




SECTOR-16 KARNAL
0
0
424
0
424
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
01-01-2018
01-01-2023




AUTO MARKET HANSI
0
0
690
0
690
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
000
Cost of the apartments000
Cost of the infrastructure000
Others costs000


0 Lakhs
0 Lakhs
0 Lakhs
0 Lakhs
No
04-10-2018
04-10-2023










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSENA
2WALL FINISHING DETAILSNA
3KITCHEN DETAILSNA
4BATHROOM FITTINGSNA
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESNA
7GLASS WORKNA
8ELECTRIC FITTINGSNA
9CONDUCTING AND WIRING DETAILSNA
10CUPBOARD DETAILSNA
11WATER STORAGENA
12LIFT DETAILSNA
13EXTERNAL GLAZINGSNA
13.1WINDOWS/GLAZINGSNA
14DOORSNA
14.1MAIN DOORSNA
14.2INTERNAL DOORSNA
15AIR CONDITIONINGNA
16ELECTRICAL FITTINGSNA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYNA
19EXTERNAL FINISHING/COLOUR SCHEMENA
20INTERNAL FINISHINGNA
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNA
1 . 2 WALLSNA
1 . 3 CEILINGNA
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNA
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORNA
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORNA
5 . 2 WALLSNA
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORNA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1 CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT 14-10-2018 View Document
2 DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED. 14-10-2018 View Document
3 SERVICE PLANS SHOWING THE SERVICES ON THE LAYOUT PLAN 29-10-2018 View Document
4 IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN 29-10-2018 View Document
5 DEMARCATION PLAN 29-10-2018 View Document
6 ZONING PLAN 29-10-2018 View Document
7 IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN 29-10-2018 View Document
8 A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS 29-10-2018 View Document
9 COPY OF LICENSE ALONG WITH SCHEDULE OF LAND 29-10-2018 View Document
10 CASH FLOW STATEMENT OF THE PROPOSED PROJECT 29-10-2018 View Document
11 DOCUMENTS RELATING TO THE ENTRY OF LICENSE AND COLLABORATION AGREEMENT IN THE REVENUE RECORD 29-10-2018 View Document
12 NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT 29-10-2018 View Document