OT-14, 3RD FLOOR, NEXT DOOR PARKLANDS, SECTOR-76 FARIDABAD FARIDABAD HR 121004 IN
01149572787
9871883334 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
http://bptp.com
XXXX442A
U45201HR2003PLC082732
PARK ARENA
SECTOR 80, FARIDABAD
FARIDABAD
FARIDABAD
8800414400
8800414400 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
VINOD KUMAR
8800414400
8800414400 (Number Shared by Promoter in Public)
rera.panchkula@bptp.com
As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-
Sr No.
Draft/Cheque No.
Draft Date
Amount
Payee Bank
Payable To
1
217501
11-08-2020
1005447
INDUSIND BANK
HRERA Panchkula
2
748264
28-07-2017
311603
RBL BANK LIMITED
HRERA Panchkula
75259.868 (Acre)
1.75
1.7495
75259.868 (Acre)
1269-1271 of 2006
No
Address M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Address M 11 MIDDLE CIRCLE CONNAUGHT CIRCUS NEW DELHI 110001
Annexure-B- ANNEXURE-B- AS A PROMOTER. (AS PER THE MASTER DEVELOPMENT AGREEMENT DATED AUGUST 03, 2007 WITH THE LICENSE HOLDERS).
APPLICANT IS APPLYING ON THE BASIS OF MASTER DEVELOPMENT
AGREEMENT (MDA) WHICH WAS ENTERED ON AUGUST 03,2007.
No
AS PER POINT (C) OF PARTY RELATED RECITALS OF THE MASTER
DEVELOPMENT AGREEMENT THE LAND OWNERS HAVE ENTERED A
COLLABORATION AGREEMENTS WITH THE COUNTRYWIDE
PROMOTERS PRIVATE LIMITED (HEREIN REFERRED AS
COUNTRYWIDE) AND COUNTRYWIDE IN TURN HAD ALSO ENTERED
COLLABORATION AGREEMENT WITH BPTP LIMITED (HEREIN
REFERRED AS BPTP) WHICH GIVES EXCLUSIVE RIGHT OF THE
DEVELOPMENT TO THE BPTP; ATTACHED HEREWITH FOR YOUR
KIND PERUSAL.
No
No
Yes
30044.58 Lakhs
1518.63 Lakhs
16368.90 Lakhs
2762.05 Lakhs
9395.00 Lakhs
Sr. No.
Land area under usage
Area of land (Square Meters)
1
PLOTS TO BE SOLD
0
2
LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS
75259.868
3
CONSTRUCTION OF ROADS
0
4
PAVEMENTS
0
5
PARKS AND PLAYGROUNDS
0
6
GREEN BELTS
0
7
VEHICLE PARKINGS
0
8
ELECTRICITY SUB-STATION
0
9
CLUB HOUSE
0
10
SEWAGE AND SOLID WASTE TREATMENT FACILITY
0
11
AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES
0
12
ANY OTHER
0
Total
75259.868
Facility
External/ connecting service to be provided by (Name the agency)
Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADS
HSVP
No
WATER SUPPLY
HSVP
No
ELECTRICITY
DHBVN
No
SEWAGE DISPOSAL
HSVP
No
STORM WATER DRAINAGE
HSVP
No
Sr. No.
Name of the facility
Estimated cost (In Lakhs)(Within the project area only)
Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1
INTERNAL ROADS AND PAVEMENTS
592.73
SUBMITTED TO HUDA
2
WATER SUPPLY SYSTEM
829.80
SUBMITTED TO HUDA
3
STORM WATER DRAINAGE
0
SUBMITTED TO HUDA
4
ELECTRICITY SUPPLY SYSTEM
889.09
SUBMITTED TO HUDA
5
SEWAGE TREATMENT & GARBAGE DISPOSAL
94.84
SUBMITTED TO HUDA
6
STREET LIGHTING
0
SUBMITTED TO HUDA
7
SECURITY AND FIRE FIGHTING
355.59
SUBMITTED TO HUDA
8
PLAYGROUNDS AND PARKS
0
SUBMITTED TO HUDA
9
CLUB HOUSE/COMMUNITY CENTRE
0
SUBMITTED TO HUDA
10
SHOPPING AREA
0
SUBMITTED TO HUDA
11
RENEWABLE ENERGY SYSTEM
0
SUBMITTED TO HUDA
12
SCHOOL
0
SUBMITTED TO HUDA
13
HOSPITAL/DISPENSARY
0
SUBMITTED TO HUDA
14
ANY OTHER
0
SUBMITTED TO HUDA
31-05-2011 (date)
31-05-2011 (date)
Sr. No.
Plot/ apartment type
Size of the plot/carpet area of the apartments
Total number of plots/apartments in the project
Plots/apartments booked/ sold upto the date of application
Yet to be sold/ booked
No. of towers to be/ being constructed for booked apartments
1
APARTMENT/SHOPS/OTHER BUILDINGS Type APARTMENTS
55623.98
624
62
562
10
Type
Number of apartments booked/ sold
Write or Annex the stage of construction of the booked/ sold apartments in folder C
APARTMENTS
62
NA
01-01-2012
31-03-2014
31-08-2025
01-01-2012
5
31-08-2025
AS MENTIONED.
NA
Plots
Booked/sold
Stage of handing over the possession (Write or Annex details)
PLOT
0
0
01-01-2012
5
31-08-2025
AS MENTIONED.
NA
0
0
468
156
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Apartments
6292.31
Shops
0
Plots
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
350
390.02
400
Shops
0
0
0
Plots
0
0
0
Particulars
Year-2021
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
425
550
450
350
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2022
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
550
450
425
400
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2023
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
440
350
500
450
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
550
390.02
400
350
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
450
450
350
425
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
350
350
400
550
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
400
500
450
440
Shops
0
0
0
0
Plots
0
0
0
0
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Apartments
350
350
550
450
Shops
0
0
0
0
Plots
0
0
0
0
Expenditure incurred till the date of application (In Lakhs)
Particulars
Expenditure
Roads & Pavements
0
Water Supply System
17.00
Sewerage treatment & garbage disposal
0
Electricity Supply System
49.00
Storm Water Drainage
0
Parks and Playgrounds
0
Clubhouse/community centres
0
Shopping area
0
Other
0
Expenditure to be made in each quarter (In Lakhs)
Particulars
Year-2020
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
20
15
18
Water Supply System
20
20
25
Sewerage treatment & garbage disposal
0
0
0
Electricity Supply System
20
20
25
Storm Water Drainage
0
0
0
Parks and Playgrounds
0
0
0
Clubhouse/community centres
0
0
0
Shopping area
0
0
0
Other
0
0
0
Particulars
Year-2021
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
18
22
16
20
Water Supply System
28
22
24
20
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
28
22
24
20
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Year-2022
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
20
22
24
22
Water Supply System
20
22
24
22
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
20
22
24
22
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Year-2023
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
20
18
19
16
Water Supply System
26
26
28
30
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
26
26
28
30
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
0
0
0
0
Particulars
Year-2024
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
16
15
18
20
Water Supply System
18
20
25
20
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
28
20
25
20
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
18
20
25
28
Particulars
Year-2025
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
20
22
16
18
Water Supply System
20
22
24
28
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
0
22
24
28
Storm Water Drainage
20
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
22
15
18
16
Particulars
Year-2026
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
22
16
20
24
Water Supply System
28
30
26
22
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
30
30
26
20
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
29
22
18
22
Particulars
Year-2027
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
20
16
20
19
Water Supply System
22
18
26
28
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
24
20
26
30
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
25
24
20
18
Particulars
Year-2028
Jan-Mar
Apr-June
July-Sep
Oct-Dec
Roads & Pavements
14
18
16
20
Water Supply System
18
26
26
30
Sewerage treatment & garbage disposal
0
0
0
0
Electricity Supply System
24
30
28
22
Storm Water Drainage
0
0
0
0
Parks and Playgrounds
0
0
0
0
Clubhouse/community centres
0
0
0
0
Shopping area
0
0
0
0
Other
30
22
20
18
Particulars
Remarks, if any
i. No. of Flats/Apartments constructed
624
ii. No. of Flats/ Apartments booked
62
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter
2757.15 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter
2406.71 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter
350.44 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter
350.44 Lakhs
vii. Amount invested in the project upto the date of application
13771.38 Lakhs
Land cost (If any)
1518.63 Lakhs
Apartments
6226.31 Lakhs
Infrastructure
66.00 Lakhs
EDC/ Taxes Etc.
5894.44 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession
21797.30 Lakhs
(a) In respect of existing allottees
0 Lakhs
(b) In respect of rest of the project
21797.30 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
0 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C)
1926.99 Lakhs
Particulars
Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)
Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS
592.73
0
II. WATER SUPPLY SYSTEM
829.80
17.00
III. STORM WATER DRAINAGE
0
0
IV. ELECTRICITY SUPPLY SYSTEM
889.09
49.00
V. SEWAGE TREATMENT & GARBAGE DISPOSAL
94.84
0
VI. CLUB HOUSE/COMMUNITY CENTRE
0
0
VII. SCHOOL
0
0
VIII. ANY OTHER
0
0
IX. SOLID WASTE COLLECTION & MGMT SYSTEM
0
0
X. CLUBHOUSE
0
0
XI. NEIGHBOURHOOD SHOPPING
0
0
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.
0
0
XIII. COVERED PARKING
0
0
XIV. OPEN PARKING
0
0
XV. GARAGES
0
0
XVI. SECURITY SYSTEM
355.59
0
XVII. OTHER FACILITIES AS PER PROJECT REPORT
0
0
Yes
Yes
ALLAHABAD BANK, 17 PARLIAMENT STREET, INDUSTRIAL FINANCE BRANCH, NEW DELHI-110001
50067283807
ALLA0211893
110010037
211893
Mr. Kabul Chawla or Jointly Any Two
Mr. (Sudhansu Tripathi /Manik Malik
/Rakesh Aggarwal /Sanjeev Lokesh
Aggarwal /Amit Kumar Singhal)
As Attached.
No
No
No
Yes
Yes
No
No
No
No
Yes
No
No
No
No
No
No
No
No
Statutory Approvals
Statutory Approvals Status
Date
I. LICENSE NO (1269-1271 OF 2006)
ALREADY BEEN OBTAINED
11-11-2006
II. BUILDING PLAN APPROVAL
ALREADY BEEN OBTAINED
31-05-2011
III. ENVIRONMENTAL CLERANCE
ALREADY BEEN OBTAINED
31-12-2012
IV. ZONNING PLAN
ALREADY BEEN OBTAINED
28-06-2007
V. ELECTRICAL LOAD APPROVAL
ALREADY BEEN OBTAINED
10-10-2011
Yes
Yes
As Already provided.
PARK TERRA, SEC 37D GURUGRAM
840305
456
0
373
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
35269.38
0
20987.44
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
30900 Lakhs
30900 Lakhs
6500.00 Lakhs
4500.00 Lakhs
Yes
31-12-2012
12-10-2020
PARK SENTOSA, SECTOR 77 FARIDABAD
743720
420
0
159
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
22701.65
0
5630.20
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
3600 Lakhs
10100 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2013
31-07-2022
VISSIONAIRE VILLAS, SECTOR 70 GURUGRAM
56233
10
10
5
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
932.83
0
493.28
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
1300 Lakhs
1000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020
PEDESTAL FLOORS SECTOR 70A GURUGRAM
303304
174
0
58
0
Initially estimated cost (In Lakhs)
Revised cost (In Lakhs)
Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project (Other than cost of land)
5550.87
0
2718.42
Cost of the apartments
0
0
0
Cost of the infrastructure
0
0
0
Others costs
0
0
0
10200 Lakhs
8000 Lakhs
0 Lakhs
0 Lakhs
Yes
30-04-2015
31-07-2020
SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1
FLOORING DETAILS OF VARIOUS PARTS OF HOUSE
VITRIFIED TILES IN LIVING ROOMS & BEDROOM. LAMINATED
WOODEN FLOORING/VITRIFIED TILES IN MASTER BEDROOM.
ANTI-SKID CERAMIC TILES IN KITCHEN. ANTI-SKID CERAMIC
TILES IN TOILETS AND BALCONY. SELECT GRANITE/MARBLE IN
STAIRCASE. VITRIFIED TILES IN LIFT LOBBY (TYPICAL FLOORS
2
WALL FINISHING DETAILS
OBD IN IN LIVING ROOM, DINING AND BEDROOM. SELECTED
MARBLE/GRANITE CLADDING LIFT / LOBBIES AND ACRYLIC
EMULSION. EXTERNAL FAçADE OF TOWERS- TEXTURE PAINTS
3
KITCHEN DETAILS
DADO: 2.0 INCH ABOVE KITCHEN COUNTER, REST OBD.
PLATFORM: GRANITE COUNTER WITH SINGLY BOWL STAINLESS
STEEL SINK WITH DRAIN BOARD.