Particulars | Expenditure already incurred up to the date of registration. (In Lakhs) | Total Estimated/ Revised cost of project. (In Lakhs) |
Land | 0 | 3390 |
Building | 0 | 2674 |
Infrastructure facilities, etc. | 0 | 4850 |
Other costs including EDC, IDC, etc. | 0 | 4600 |
Total | 0 | 15514 |
Name of the approval | Status | Date |
Layout Plan | Obtained Approval on | 27-09-2012 |
Demarcation Plan | Obtained Approval on | 09-01-2013 |
Zoning Plan | Obtained Approval on | 18-04-2013 |
Service Plans | Obtained Approval on | 14-01-2014 |
Electricity Plans | Obtained Approval on | 14-01-2014 |
Name of the approval | Status | Date |
Demarcation Plan | Have not applied till date | N/A |
Zoning Plan | Have not applied till date | N/A |
Service Plans | Have not applied till date | N/A |
Electricity Plans | Have not applied till date | N/A |
Site Plans | Have not applied till date | N/A |
Building Plans | Have not applied till date | N/A |
FIre NOC | Have not applied till date | N/A |
Total Expenditure on the project | 12124 |
Expenditure made upto the date of Registration | 0 |
EDC due as on the date of Registration | 0 |
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 19198.30 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 19198.30 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 3390 |
2 | Cost of construction of apartments | 2674 |
3 | Cost of infrastructure & other structure | 3090.17 |
4 | Other costs including EDC, taxes, etc | 5854.97 |
Total | 15009.14 | |
Balance | 504.89 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 19198.30 |
3 | Amount withdrawn during the quarter | 19178.86 |
4 | Balance at the end of the quarter | 19.44 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 2 |
2 | B | 10 |
3 | C | 88 |
4 | D | 35 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 3090.17 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 3996.75 |
4 | Others Expenditure | 1858.22 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 5854.97 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 621.98 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 621.98 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 246.94 |
4 | Other costs including EDC, taxes, etc | 258.72 |
Total | 505.66 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 19.44 |
2 | Amount deposited in Escrow Account | 621.98 |
3 | Amount withdrawn during the quarter | 640.96 |
4 | Balance at the end of the quarter | 0.46 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 4 |
3 | C | 19 |
4 | D | 18 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 246.94 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 242.78 |
4 | Others Expenditure | 15.94 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 6097.75 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 420 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 420 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 36.98 |
4 | Other costs including EDC, taxes, etc | 3.14 |
Total | 40.12 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0.46 |
2 | Amount deposited in Escrow Account | 420.08 |
3 | Amount withdrawn during the quarter | 417.58 |
4 | Balance at the end of the quarter | 2.49 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 0 |
3 | C | 0 |
4 | D | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | NA | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | NA | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | .59 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 3.14 |
4 | Others Expenditure | 0.52 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 6100.89 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 305.88 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 305.88 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 26.11 |
4 | Other costs including EDC, taxes, etc | 0.81 |
Total | 26.92 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 2.49 |
2 | Amount deposited in Escrow Account | 305.88 |
3 | Amount withdrawn during the quarter | 278.76 |
4 | Balance at the end of the quarter | 27.11 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 0 |
3 | C | 0 |
4 | D | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | NA | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | NA | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 26.11 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0.81 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 6100 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 87.73 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 87.73 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 7.49 |
4 | Other costs including EDC, taxes, etc | 1.87 |
Total | 9.37 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 27.11 |
2 | Amount deposited in Escrow Account | 87.73 |
3 | Amount withdrawn during the quarter | 108.13 |
4 | Balance at the end of the quarter | 6.71 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | C | 0 |
2 | D | 0 |
3 | A | 0 |
4 | B | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | NA | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | NA | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 7.49 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 1.64 |
4 | Others Expenditure | 0.23 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 6102.53 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 124.42 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 124.42 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 10.95 |
4 | Other costs including EDC, taxes, etc | 12.88 |
Total | 23.83 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 6.71 |
2 | Amount deposited in Escrow Account | 124.42 |
3 | Amount withdrawn during the quarter | 120.95 |
4 | Balance at the end of the quarter | 10.18 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 0 |
3 | C | 0 |
4 | D | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | NA | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | NA | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 10.62 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 12.88 |
4 | Others Expenditure | 0.32 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 6115.42 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 67.74 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 67.74 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 0 |
4 | Other costs including EDC, taxes, etc | 4.50 |
Total | 4.50 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 10.18 |
2 | Amount deposited in Escrow Account | 67.74 |
3 | Amount withdrawn during the quarter | 4.50 |
4 | Balance at the end of the quarter | 73.42 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 0 |
3 | C | 0 |
4 | D | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 4.50 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 6119.92 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 226.79 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 226.79 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 0 |
4 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 73.42 |
2 | Amount deposited in Escrow Account | 226.79 |
3 | Amount withdrawn during the quarter | 226.79 |
4 | Balance at the end of the quarter | 73.42 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 0 |
3 | C | 0 |
4 | D | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 6119.92 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 504.66 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 504.66 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 0 |
4 | Other costs including EDC, taxes, etc | 6.94 |
Total | 6.94 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 73.42 |
2 | Amount deposited in Escrow Account | 504.66 |
3 | Amount withdrawn during the quarter | 504.66 |
4 | Balance at the end of the quarter | 73.42 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 0 |
3 | C | 0 |
4 | D | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 6.94 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 6115.42 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 118.84 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 118.84 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 0 |
4 | Other costs including EDC, taxes, etc | 4.75 |
Total | 4.75 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 73.42 |
2 | Amount deposited in Escrow Account | 118.84 |
3 | Amount withdrawn during the quarter | 192.26 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 0 |
3 | C | 0 |
4 | D | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 4.75 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 0 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 17.60 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 17.60 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 0 |
4 | Other costs including EDC, taxes, etc | 4.20 |
Total | 4.20 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 17.60 |
3 | Amount withdrawn during the quarter | 17.60 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 0 |
3 | C | 0 |
4 | D | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 4.20 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 0 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 4 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 4 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 0 |
4 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 4 |
3 | Amount withdrawn during the quarter | 4 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 0 |
3 | C | 0 |
4 | D | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 0 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 45 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | -45 |
5 | Any other receipt | 0 |
Total | 0 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 0 |
4 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 45 |
3 | Amount withdrawn during the quarter | 45 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 0 |
3 | C | 0 |
4 | D | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 0 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 59 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 59 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 0 |
4 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 59 |
3 | Amount withdrawn during the quarter | 59 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | A | 0 |
2 | B | 0 |
3 | C | 0 |
4 | D | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 0 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 0 |
2 | Amount collected from allottees against booked plots and/or apartments | 103.13 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 0 |
Total | 103.13 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Land | 0 |
2 | Cost of construction of apartments | 0 |
3 | Cost of infrastructure & other structure | 0 |
4 | Other costs including EDC, taxes, etc | 0 |
Total | 0 | |
Balance | 0 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 0 |
2 | Amount deposited in Escrow Account | 103.13 |
3 | Amount withdrawn during the quarter | 103.13 |
4 | Balance at the end of the quarter | 0 |
Total Plots in the colony | 178 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 0 |
Apartments sold upto the date of Registration | 0 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 0 |
2 | EDC due as on date | 0 |
|