Quarterly Schedules | ||
HRERA Panchkula | ||
Project Registration Number : 122 OF 2017 DATED 28-08-2017 | ||
Project Name : GROUP HOUSING COLONY ("HAPPY HOMES GRAND") AREA OF 5.05625 ACRES | ||
Project Number : RERA-PKL-611-2019 | ||
Project Type : NEW | ||
Report Online Submission Date : 03-Aug-2019 |
S.No. | Particulars | Amount (In Lakhs) |
1 | Cost of the land (if included in the estimated cost) | 1251 |
2 | Estimated cost of construction of apartments | 11000 |
3 | Estimated cost of infrastructure & other structure | 1950 |
4 | Other cost including EDC taxes, levies, etc | 3700 |
Total | 17901 |
Name of the approval | Status | Date |
Layout Plan | Obtained Approval on | 03-11-2016 |
Demarcation Plan | Obtained Approval on | 04-08-2016 |
Zoning Plan | Obtained Approval on | 20-09-2016 |
Service Plans | Have not applied till date | N/A |
Electricity Plans | Obtained Approval on | 07-12-2017 |
Name of the approval | Status | Date |
Demarcation Plan | Obtained Approval on | 04-08-2016 |
Zoning Plan | Obtained Approval on | 20-09-2016 |
Service Plans | Obtained Approval on | 23-06-2020 |
Electricity Plans | Obtained Approval on | 07-12-2017 |
Site Plans | Obtained Approval on | 03-11-2016 |
Building Plans | Obtained Approval on | 03-11-2016 |
FIre NOC | Obtained Approval on | 28-10-2016 |
Total Expenditure on the project | 13000 |
Expenditure made upto the date of Registration | 6183 |
EDC due as on the date of Registration | 74.05 |
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1325.51 |
2 | Amount collected from allottees against booked plots and/or apartments | 879.54 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 67.40 |
Total | 2272.45 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 547.28 |
2 | Expenditure on infrastructure & other structure | 2.82 |
3 | Other costs including EDC, taxes, etc | 229.95 |
Total | 780.05 | |
Balance | 1492.40 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 1325.51 |
2 | Amount deposited in Escrow Account | 946.94 |
3 | Amount withdrawn during the quarter | 811.05 |
4 | Balance at the end of the quarter | 1461.40 |
Total Apartments in the colony | 730 |
Apartments sold upto the date of Registration | 684 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | A | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 473.4 |
2 | Apartments | 3350.5 |
3 | EDC, IDC, etc | 298.08 |
4 | Others Expenditure | 2061.02 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 298.08 |
2 | EDC due as on date | 74.05 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1492.40 |
2 | Amount collected from allottees against booked plots and/or apartments | 1428.92 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 13.38 |
Total | 1442.3 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 1369.52 |
2 | Expenditure on infrastructure & other structure | 6.58 |
3 | Other costs including EDC, taxes, etc | 162.88 |
Total | 1538.98 | |
Balance | 1264.68 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 1461.40 |
2 | Amount deposited in Escrow Account | 1442.30 |
3 | Amount withdrawn during the quarter | 1639.01 |
4 | Balance at the end of the quarter | 1264.68 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | 0 |
Total Apartments in the colony | 730 |
Apartments sold upto the date of Registration | 684 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | A | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 6.58 |
2 | Apartments | 1369.52 |
3 | EDC, IDC, etc | 77.63 |
4 | Others Expenditure | 85.25 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 77.63 |
2 | EDC due as on date | 70.49 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1264.68 |
2 | Amount collected from allottees against booked plots and/or apartments | 800.90 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 8.25 |
Total | 2073.83 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 449.36 |
2 | Expenditure on infrastructure & other structure | 49.09 |
3 | Other costs including EDC, taxes, etc | 429.68 |
Total | 928.13 | |
Balance | 1120.78 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 1264.68 |
2 | Amount deposited in Escrow Account | 809.16 |
3 | Amount withdrawn during the quarter | 953.06 |
4 | Balance at the end of the quarter | 1120.78 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | NIL | 0 |
Total Apartments in the colony | 730 |
Apartments sold upto the date of Registration | 682 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 3BHK | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | NIL | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 49.09 |
2 | Apartments | 449.36 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 429.68 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 375.58 |
2 | EDC due as on date | 70.49 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1120.78 |
2 | Amount collected from allottees against booked plots and/or apartments | 1476.59 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 26.69 |
Total | 2624.06 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 233.28 |
2 | Expenditure on infrastructure & other structure | 22.73 |
3 | Other costs including EDC, taxes, etc | 40.85 |
Total | 296.86 | |
Balance | 1107.96 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 1120.78 |
2 | Amount deposited in Escrow Account | 1503.28 |
3 | Amount withdrawn during the quarter | 1516.1 |
4 | Balance at the end of the quarter | 1107.96 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | NIL | 0 |
Total Apartments in the colony | 730 |
Apartments sold upto the date of Registration | 682 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 3BHK | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | NIL | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 22.73 |
2 | Apartments | 233.28 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 40.85 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 375.58 |
2 | EDC due as on date | 137.96 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1107.96 |
2 | Amount collected from allottees against booked plots and/or apartments | 925.03 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 4.66 |
Total | 2037.65 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 697.59 |
2 | Expenditure on infrastructure & other structure | 97.48 |
3 | Other costs including EDC, taxes, etc | 257.47 |
Total | 1052.54 | |
Balance | 400.94 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 1107.96 |
2 | Amount deposited in Escrow Account | 929.69 |
3 | Amount withdrawn during the quarter | 1636.7 |
4 | Balance at the end of the quarter | 400.94 |
Total Apartments in the colony | 730 |
Apartments sold upto the date of Registration | 682 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 3BHK | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 97.48 |
2 | Apartments | 697.59 |
3 | EDC, IDC, etc | 149.97 |
4 | Others Expenditure | 107.50 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 519.7 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 400.94 |
2 | Amount collected from allottees against booked plots and/or apartments | 516.95 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 135.76 |
5 | Any other receipt | 2.78 |
Total | 1056.43 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 521.24 |
2 | Expenditure on infrastructure & other structure | 76.37 |
3 | Other costs including EDC, taxes, etc | 155.41 |
Total | 753.02 | |
Balance | 303.41 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 400.94 |
2 | Amount deposited in Escrow Account | 655.49 |
3 | Amount withdrawn during the quarter | 753.02 |
4 | Balance at the end of the quarter | 303.41 |
Total Apartments in the colony | 730 |
Apartments sold upto the date of Registration | 702 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 3BHK | 7 |
2 | 2 BHK | 13 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 76.37 |
2 | Apartments | 521.24 |
3 | EDC, IDC, etc | 64.13 |
4 | Others Expenditure | 91.28 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 64.13 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 303.41 |
2 | Amount collected from allottees against booked plots and/or apartments | 1182.02 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 39.89 |
Total | 1525.32 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 574.33 |
2 | Expenditure on infrastructure & other structure | 9.38 |
3 | Other costs including EDC, taxes, etc | 155.10 |
Total | 738.81 | |
Balance | 786.51 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 303.41 |
2 | Amount deposited in Escrow Account | 1221.91 |
3 | Amount withdrawn during the quarter | 738.81 |
4 | Balance at the end of the quarter | 786.51 |
Total Plots in the colony | 0 |
Plots sold upto the date of Registration | 0 |
S.No. | Type/Size | Plots Sold in the Quarter |
1 | NIL | 0 |
Total Apartments in the colony | 730 |
Apartments sold upto the date of Registration | 702 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | 3BHK | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | NIL | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 9.38 |
2 | Apartments | 574.33 |
3 | EDC, IDC, etc | 4.47 |
4 | Others Expenditure | 150.63 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 583.92 |
2 | EDC due as on date | 0 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 786.51 |
2 | Amount collected from allottees against booked plots and/or apartments | 608.14 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 30.00 |
Total | 1424.65 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 584.65 |
2 | Expenditure on infrastructure & other structure | 24.85 |
3 | Other costs including EDC, taxes, etc | 380.27 |
Total | 989.77 | |
Balance | 434.88 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 786.51 |
2 | Amount deposited in Escrow Account | 638.14 |
3 | Amount withdrawn during the quarter | 989.77 |
4 | Balance at the end of the quarter | 434.88 |
Total Apartments in the colony | 730 |
Apartments sold upto the date of Registration | 702 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | NIL | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 24.85 |
2 | Apartments | 584.65 |
3 | EDC, IDC, etc | 4.05 |
4 | Others Expenditure | 376.22 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 583.83 |
2 | EDC due as on date | 61.04 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 434.88 |
2 | Amount collected from allottees against booked plots and/or apartments | 743.21 |
3 | Amount availed from the bank/financial institutions | 0 |
4 | Amount contributed by the promoters/his associates | 0 |
5 | Any other receipt | 162.10 |
Total | 1340.19 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 292.66 |
2 | Expenditure on infrastructure & other structure | 39.44 |
3 | Other costs including EDC, taxes, etc | 260.66 |
Total | 592.76 | |
Balance | 668.42 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 434.88 |
2 | Amount deposited in Escrow Account | 905.31 |
3 | Amount withdrawn during the quarter | 671.77 |
4 | Balance at the end of the quarter | 668.42 |
Total Apartments in the colony | 730 |
Apartments sold upto the date of Registration | 702 |
S.No. | Type/Size | Apartments Sold in the Quarter |
1 | NIL | 0 |
Total Garages in the colony | 0 |
Garages sold upto the date of Registration | 0 |
S.No. | Type/Size | Garages Sold in the Quarter |
1 | NIL | 0 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 39.44 |
2 | Apartments | 292.66 |
3 | EDC, IDC, etc | 56.21 |
4 | Others Expenditure | 204.45 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 639.80 |
2 | EDC due as on date | 5.19 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1226.21 |
2 | Amount collected from allottees against booked plots and/or apartments | 362.08 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 52.65 |
Total | 414.73 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 7562.71 |
2 | Expenditure on infrastructure & other structure | 1360.00 |
3 | Other costs including EDC, taxes, etc | 4813.78 |
Total | 13736.49 | |
Balance | 1814.51 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 668.42 |
2 | Amount deposited in Escrow Account | 414.73 |
3 | Amount withdrawn during the quarter | 662.70 |
4 | Balance at the end of the quarter | 420.45 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 639.80 |
2 | EDC due as on date | 5.19 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1814.51 |
2 | Amount collected from allottees against booked plots and/or apartments | 140.26 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 8.68 |
Total | 148.94 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 7757.34 |
2 | Expenditure on infrastructure & other structure | 1367.62 |
3 | Other costs including EDC, taxes, etc | 4832.62 |
Total | 13957.58 | |
Balance | 1593.42 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 420.45 |
2 | Amount deposited in Escrow Account | 148.94 |
3 | Amount withdrawn during the quarter | 221.09 |
4 | Balance at the end of the quarter | 348.30 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1593.42 |
2 | Amount collected from allottees against booked plots and/or apartments | 193.90 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 17.00 |
Total | 210.90 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 7801.41 |
2 | Expenditure on infrastructure & other structure | 1450.16 |
3 | Other costs including EDC, taxes, etc | 4832.62 |
Total | 14084.19 | |
Balance | 1466.81 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 348.30 |
2 | Amount deposited in Escrow Account | 210.90 |
3 | Amount withdrawn during the quarter | 126.62 |
4 | Balance at the end of the quarter | 432.58 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1466.81 |
2 | Amount collected from allottees against booked plots and/or apartments | 24.68 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 3.70 |
Total | 28.38 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 7879.78 |
2 | Expenditure on infrastructure & other structure | 1558.18 |
3 | Other costs including EDC, taxes, etc | 4928.07 |
Total | 14366.03 | |
Balance | 1184.97 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 432.58 |
2 | Amount deposited in Escrow Account | 28.38 |
3 | Amount withdrawn during the quarter | 281.85 |
4 | Balance at the end of the quarter | 179.11 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1184.97 |
2 | Amount collected from allottees against booked plots and/or apartments | 1489.71 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 3.89 |
Total | 1493.60 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 9160.82 |
2 | Expenditure on infrastructure & other structure | 1886.09 |
3 | Other costs including EDC, taxes, etc | 4928.07 |
Total | 15974.98 | |
Balance | 1926.02 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 179.11 |
2 | Amount deposited in Escrow Account | 1493.60 |
3 | Amount withdrawn during the quarter | 1608.95 |
4 | Balance at the end of the quarter | 63.76 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 1926.02 |
2 | Amount collected from allottees against booked plots and/or apartments | 1705.48 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 5.98 |
Total | 1711.46 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 10807.42 |
2 | Expenditure on infrastructure & other structure | 1950.00 |
3 | Other costs including EDC, taxes, etc | 4928.07 |
Total | 17685.49 | |
Balance | 215.51 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 63.76 |
2 | Amount deposited in Escrow Account | 1711.46 |
3 | Amount withdrawn during the quarter | 1710.51 |
4 | Balance at the end of the quarter | 64.71 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 215.51 |
2 | Amount collected from allottees against booked plots and/or apartments | 199.42 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 3.80 |
Total | 203.22 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 10999.87 |
2 | Expenditure on infrastructure & other structure | 1950.00 |
3 | Other costs including EDC, taxes, etc | 4937.27 |
Total | 17887.14 | |
Balance | 13.86 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 64.71 |
2 | Amount deposited in Escrow Account | 203.22 |
3 | Amount withdrawn during the quarter | 201.65 |
4 | Balance at the end of the quarter | 66.28 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 13.86 |
2 | Amount collected from allottees against booked plots and/or apartments | 2.36 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 0.00 |
Total | 2.36 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 10999.87 |
2 | Expenditure on infrastructure & other structure | 1950.00 |
3 | Other costs including EDC, taxes, etc | 4938.16 |
Total | 17888.03 | |
Balance | 12.97 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 66.28 |
2 | Amount deposited in Escrow Account | 2.36 |
3 | Amount withdrawn during the quarter | 42.18 |
4 | Balance at the end of the quarter | 26.46 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 12.97 |
2 | Amount collected from allottees against booked plots and/or apartments | 1.50 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 31.76 |
Total | 33.26 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 10999.87 |
2 | Expenditure on infrastructure & other structure | 1950.00 |
3 | Other costs including EDC, taxes, etc | 4941.28 |
Total | 17891.15 | |
Balance | 9.85 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 26.46 |
2 | Amount deposited in Escrow Account | 33.26 |
3 | Amount withdrawn during the quarter | 3.13 |
4 | Balance at the end of the quarter | 56.59 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 9.85 |
2 | Amount collected from allottees against booked plots and/or apartments | 8.31 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 4.12 |
Total | 12.43 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 10999.87 |
2 | Expenditure on infrastructure & other structure | 1950.00 |
3 | Other costs including EDC, taxes, etc | 4943.50 |
Total | 17893.37 | |
Balance | 7.63 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 56.59 |
2 | Amount deposited in Escrow Account | 12.43 |
3 | Amount withdrawn during the quarter | 6.55 |
4 | Balance at the end of the quarter | 62.47 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 7.63 |
2 | Amount collected from allottees against booked plots and/or apartments | 1.73 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 3.28 |
Total | 5.01 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 10999.87 |
2 | Expenditure on infrastructure & other structure | 1950.00 |
3 | Other costs including EDC, taxes, etc | 4944.35 |
Total | 174894.22 | |
Balance | 6.78 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 62.47 |
2 | Amount deposited in Escrow Account | 5.01 |
3 | Amount withdrawn during the quarter | 45.59 |
4 | Balance at the end of the quarter | 21.89 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 6.78 |
2 | Amount collected from allottees against booked plots and/or apartments | 9.26 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 0.74 |
Total | 10.00 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 10999.87 |
2 | Expenditure on infrastructure & other structure | 1950.00 |
3 | Other costs including EDC, taxes, etc | 4945.86 |
Total | 17895.73 | |
Balance | 5.27 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 21.89 |
2 | Amount deposited in Escrow Account | 10.00 |
3 | Amount withdrawn during the quarter | 9.53 |
4 | Balance at the end of the quarter | 22.36 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|
S.No. | Cash Inflow | Amount (In Lakhs) |
1 | Opening Balance | 5.27 |
2 | Amount collected from allottees against booked plots and/or apartments | 3.74 |
3 | Amount availed from the bank/financial institutions | 0.00 |
4 | Amount contributed by the promoters/his associates | 0.00 |
5 | Any other receipt | 0.55 |
Total | 4.29 |
S.No. | Cash Outflow | Amount (In Lakhs) |
1 | Expenditure on construction of apartments | 10999.87 |
2 | Expenditure on infrastructure & other structure | 1950.00 |
3 | Other costs including EDC, taxes, etc | 4948.27 |
Total | 17898.14 | |
Balance | 2.86 |
S.No. | Information relating to Escrow Account | Amount (In Lakhs) |
1 | Opening balance at the beginning of the quarter | 22.36 |
2 | Amount deposited in Escrow Account | 4.29 |
3 | Amount withdrawn during the quarter | 17.15 |
4 | Balance at the end of the quarter | 9.51 |
S.No. | Expenditure on Infrastructure made in the Quarter | Amount (In Lakhs) |
1 | Infrastructure | 0 |
2 | Apartments | 0 |
3 | EDC, IDC, etc | 0 |
4 | Others Expenditure | 0 |
S.No. | Expenditure on Taxes,Levies,EDC etc in the Quarter | Amount (In Lakhs) |
1 | Actual paid as on date | 699.32 |
2 | EDC due as on date | 0.00 |
|