HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-338-2018
Submission Date : 23-10-2018 02:28:11 AM
Applicant Type : Company
Project Type: ONGOING




RPS INFRASTRUCTURE LTD.
1117-1120, TOWER-B, DLF TOWERS, JASOLA DISTRICT CENTRE, NEW DELHI-110025
01140543200
0114054320 (Number Shared by Promoter in Public)
info@rpsgroupindia.com
http://www.rpsgroupindia.com
XXXX288F
U45201DL2005PLC140779
 
 


 
 


 
 







RPS INFINIA PHASE III
VILLAGE SARAI KHAWAJA, SEC 27 A
BADKHAL
FARIDABAD
01294054320
9871099619 (Number Shared by Promoter in Public)
ramneek@rpsgroupindia.com
B P SHARMA
01294054320
8860085284 (Number Shared by Promoter in Public)
bpsharma@rpsgroupindia.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
184569129-07-2017311037ORIENTAL BANK OF COMMERCEHRERA Panchkula







1.68 (Acre)
15494.70
250
7.587 (Acre)
19 of 2010
No
Address     UNIT NO. 111, BLOCK NO.1 , FIRST FLOOR, TRIBHUVAN COMPLEX, ISHWAR NAGAR, NEW DELHI- 110065
Address     UNIT NO. 111, BLOCK NO.1 , FIRST FLOOR, TRIBHUVAN COMPLEX, ISHWAR NAGAR, NEW DELHI- 110065
Annexure-B- ANNEXURE-BCOLLABORATOR AND DEVELOPER
COLLABORATION AGREEMENT AND POWER OF ATTORNEY
No
COLLABORATION AGREEMENT IS ATTACHED
No
No
Yes







11270 Lakhs
4313 Lakhs
5996 Lakhs
697 Lakhs
264 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS7602.66
3CONSTRUCTION OF ROADS10032
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS4147.20
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER8921.59
Total30703.45




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSDTCP/MCF/HUDANo
WATER SUPPLYDTCP/MCF/HUDANo
ELECTRICITYDTCP/MCF/HUDANo
SEWAGE DISPOSALDTCP/MCF/HUDANo
STORM WATER DRAINAGEDTCP/MCF/HUDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS45AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM74AS PER PROJECT REPORT
3STORM WATER DRAINAGE22AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM148AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL45AS PER PROJECT REPORT
6STREET LIGHTING0YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS119AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER59AS PER PROJECT REPORT
15EXTERNAL FIRE FIGHTING104AS PER PROJECT REPORT
16SOLID WASTE MANAGEMENT SYSTEM7AS PER PROJECT REPORT
17VD FLOORING, WHITE WASH & OTHER ACTIVITIES IN BASEMENT74AS PER PROJECT REPORT


11-10-2018 (date)
11-10-2018 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE6451101
2APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE7451101
3APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE6491101
4APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE1951101
5APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE2071101
6APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE2061101
7APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE2001101
8APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE2141101
9APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE2951011
10APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE42110436681
11APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE4319091
12APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE4337354191
13APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE4519451
14APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE4389451
15APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE4329541
16APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE8571101
17APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE119781101
18APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE52711101
19APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE4621011
20APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE4223031
21APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE4353031
22APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE6111011






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
OFFICE114STRUCTURE COMPLETED


30-11-2012
30-11-2015
30-09-2023
31-10-2020
0
30-09-2023


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
31-10-2020
0
30-09-2023


0
0
175
35
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments68.59
Shops0
Plots0

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments68.59102.88102.88137.18
Shops0000
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments137.18137.18171.47171.47
Shops0000
Plots0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments171.47171.47171.47171.47
Shops0000
Plots0000

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments137.18137.18155.01
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
External fire fighting0
Solid waste management0
VD Flooring, White Wash & Other Activities in basement0

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System7.41
Sewerage treatment & garbage disposal2.96
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System11.8614.8314.8313.35
Sewerage treatment & garbage disposal5.9311.868.908.90
Electricity Supply System14.8322.2551.9344.51
Storm Water Drainage02.967.417.41
Parks and Playgrounds02.9614.8320.77
Clubhouse/community centres0000
Shopping area0000
Other0000
External fire fighting7.4137.0944.51
VD Flooring, White Wash & Other Activities in basement14.8314.8322.25

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements029.6714.830
Water Supply System11.86000
Sewerage treatment & garbage disposal5.93000
Electricity Supply System14.83000
Storm Water Drainage4.45000
Parks and Playgrounds20.7729.6729.670
Clubhouse/community centres0000
Shopping area0000
Other00014.83
VD Flooring, White Wash & Other Activities in basement22.25
External fire fighting14.83

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other14.8314.8314.83
Solid waste management system3.70
Solid Waste Management System3.70












Particulars Remarks, if any
i. No. of Flats/Apartments constructed233
ii. No. of Flats/ Apartments booked114
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter7031.07 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter4781.20 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter2249.87 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter610.39 Lakhs
vii. Amount invested in the project upto the date of application0 Lakhs
Land cost (If any)2875 Lakhs
Apartments3783 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.264 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession6821 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
406 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 406 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS00
II. WATER SUPPLY SYSTEM00
III. STORM WATER DRAINAGE00
IV. ELECTRICITY SUPPLY SYSTEM00
V. SEWAGE TREATMENT & GARBAGE DISPOSAL00
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
ORIENTAL BANK OF COMMERCE, SECTOR-16, DAULTABAD, FARIDABAD
01981131004435
ORBC0100198
110022060
0198
Directors of the Company











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLANALREADY BEEN OBTAINED11-10-2018








Yes


Yes


Yes







RPS CENTRAL, FARIDABAD
0.399
74
0
74
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
9360376
Cost of the apartments6900315
Cost of the infrastructure18600
Others costs6100


1828.06 Lakhs
603.96 Lakhs
300 Lakhs
100 Lakhs
No
31-10-2018
30-09-2019










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEINTERNAL FLOORING OF UNITS : TO BE DONE BY CUSTOMER AS PER PREFERENCE & REQUIREMENT. LOBBY/CORRIDORS/STAIRS: KOTA STONE/VITRIFIED TILES IN PLEASANT SHADES/COMBINATIONS
2WALL FINISHING DETAILSINTERNAL WALLS OF UNITS: TO BE DONE BY CUSTOMER AS PER PREFERENCE & REQUIREMENT. LOBBY/CORRIDORS/STAIRS: PLASTER WITH PLEASANT SHADES OF DISTEMPER
3KITCHEN DETAILSNOT APPLICABLE
4BATHROOM FITTINGSCHINAWARE & CHROME PLATED(CP) FITTINGS
5WOOD WORK ETCNOT APPLICABLE
6DOORS AND WINDOS FRAMESFRAMELESS/UPVC/ALUMINUM FRAME
7GLASS WORKGLAZED SHUTTERS/FIXED GLASS FOR INTERNAL DOORS & WINDOWS
8ELECTRIC FITTINGSISI MARKED LIGHTING FIXTURES IN COMMON AREA
9CONDUCTING AND WIRING DETAILSPVC CONDUITS FOR CONCEALED WIRING AND MS CONDUITS FOR EXPOSED WIRING WITH ISI MARKED CABLES AS PER REQUIREMENT
10CUPBOARD DETAILSNOT APPLICABLE
11WATER STORAGEUNDER GROUND AND OVER HEAD RCC TANKS
12LIFT DETAILSPASSENGER LIFTS OF SUITABLE/APPROVED CAPACITY
13EXTERNAL GLAZINGSSTRUCTURE GLAZING WITH TOUGHENED GLASS IN EXTERNAL FAçADE
13.1WINDOWS/GLAZINGSSTRIP WINDOWS WITH TOUGHENED GLASS
14DOORSGLAZED DOORS OF SPECIFIED SIZE
14.1MAIN DOORSGLAZED DOORS OF SPECIFIED SIZE
14.2INTERNAL DOORSGLAZED DOORS OF SPECIFIED SIZE
15AIR CONDITIONINGCENTRALIZED AIR CONDITIONING THROUGH DUCTING/ SPLIT AIR CONDITIONERS
16ELECTRICAL FITTINGSISI MARKED LIGHTING FIXTURES IN COMMON AREA
17CNG PIPE LINENOT APPLICABLE
18PROVISION OF WIFI AND BROADBAND FACILITYTO BE PROVIDED
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL PAINT IN PLEASANT SHADE FOR AREAS OTHER THAN GLASS AND STONE CLADDING
20INTERNAL FINISHINGPLASTER WITH PLEASANT SHADES OF DISTEMPER ON WALLS AND KOTA STONE/VITRIFIED TILES IN PLEASANT SHADES/COMBINATIONS IN FLOORING
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNA
1 . 2 WALLSNA
1 . 3 CEILINGNA
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNA
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORNA
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORNA
5 . 2 WALLSNA
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORNA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT23-10-2018 View Document
2COPY OF LICENSE ALONG WITH SCHEDULE OF LAND23-10-2018 View Document
3DEMARCATION PLAN23-10-2018 View Document
4ZONING PLAN23-10-2018 View Document
5IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN23-10-2018 View Document
6NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT23-10-2018 View Document
7IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN23-10-2018 View Document
8A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS23-10-2018 View Document












Sr. No.Document DescriptionDate of Document UploadView Document
1 RC UPLOADED EXTENSION 22-03-2024 View Document