HRERA PanchkulaTemp Project Id : RERA-PKL-PROJ-336-2018
Submission Date : 23-10-2018 12:41:19 PM
Applicant Type : Company
Project Type: ONGOING




RPS INFRASTRUCTURE LIMITED
1117-1120, TOWER-B, DLF TOWERS, JASOLA DISTRICT CENTRE, NEW DELHI-110025
01140543200
0114054320 (Number Shared by Promoter in Public)
info@rpsgroupindia.com
http://www.rpsgroupindia.com
XXXX288F
U45201DL2005PLC140779
 
 


 
 


 
 







RPS INFINIA PHASE II
VILLAGE SARAI KHAWAJA, SEC 27 A
BADKHAL
FARIDABAD
01294054320
9871099619 (Number Shared by Promoter in Public)
ramneek@rpsgroupindia.com
B P SHARMA
01294054320
8860085284 (Number Shared by Promoter in Public)
bpsharma@rpsgroupindia.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
184568929-07-2017309042ORIENTAL BANK OF COMMERCEHRERA Panchkula







1.47 (Acre)
18896.28
250
7.587 (Acre)
19 of 2010
No
Address     UNIT NO. 111, BLOCK NO.1, FIRST FLOOR, TRIBHUVAN COMPLEX, ISHWAR NAGAR, NEW DELHI- 110065
Address     UNIT NO. 111, BLOCK NO.1, FIRST FLOOR, TRIBHUVAN COMPLEX, ISHWAR NAGAR, NEW DELHI- 110065
Annexure-B- COLLABORATOR AND DEVELOPER
COLLABORATION AGREEMENT AND POWER OF ATTORNEY
No
COLLABORATION AGREEMENT IS ATTACHED
No
No
Yes







13743 Lakhs
5260 Lakhs
7287 Lakhs
876 Lakhs
320 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD0
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS7602.66
3CONSTRUCTION OF ROADS10032
4PAVEMENTS0
5PARKS AND PLAYGROUNDS0
6GREEN BELTS0
7VEHICLE PARKINGS4147.20
8ELECTRICITY SUB-STATION0
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER8921.59
Total30703.45




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSDTCP/MCF/HUDANo
WATER SUPPLYDTCP/MCF/HUDANo
ELECTRICITYDTCP/MCF/HUDANo
SEWAGE DISPOSALDTCP/MCF/HUDANo
STORM WATER DRAINAGEDTCP/MCF/HUDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS45AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM89AS PER PROJECT REPORT
3STORM WATER DRAINAGE37AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM297AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL52AS PER PROJECT REPORT
6STREET LIGHTING0YET TO BE PREPARED
7SECURITY AND FIRE FIGHTING0YET TO BE PREPARED
8PLAYGROUNDS AND PARKS104AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0YET TO BE PREPARED
10SHOPPING AREA0YET TO BE PREPARED
11RENEWABLE ENERGY SYSTEM0YET TO BE PREPARED
12SCHOOL0YET TO BE PREPARED
13HOSPITAL/DISPENSARY0YET TO BE PREPARED
14ANY OTHER59AS PER PROJECT REPORT
15SOLID WASTE MANAGEMENT SYSTEM7AS PER PROJECT REPORT
16EXTERNAL FIRE FIGHTING89AS PER PROJECT REPORT
17VD FLOORING, WHITE WASH & OTHER ACTIVITIES IN BASEMENT97AS PER PROJECT REPORT


11-10-2018 (date)
11-10-2018 (date)


Sr. No.Plot/ apartment type Size of the plot/carpet area of the apartmentsTotal number of plots/apartments in the projectPlots/apartments booked/ sold upto the date of applicationYet to be sold/ bookedNo. of towers to be/ being constructed for booked apartments
1APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE3581101
2APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE10901011
3APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE16822021
4APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE16891011
5APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE16941011
6APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE16471011
7APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE5681011
8APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE6261011
9APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE25381011
10APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE921101
11APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE1011101
12APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE1151101
13APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE17941101
14APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE15881101
15APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE6722201
16APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE2131011
17APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE51281101
18APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE57711101
19APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE22791101
20APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE18041101
21APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE10231011
22APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE16681011
23APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE16371011
24APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE13941101
25APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE3171011
26APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE57741101
27APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE57753301
28APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE51221101
29APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE50791101
30APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE5195141
31APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE3455231
32APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE7785231
33APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE8435231
34APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE83010461
35APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE8415141
36APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE7935231
37APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE8005141
38APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE8195141
39APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE8315141
40APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE7905231
41APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE8745141
42APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE2325141
43APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE95022111
44APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE21062111
45APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE41552021
46APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE34831011
47APARTMENT/SHOPS/OTHER BUILDINGS Type OFFICE41691011






TypeNumber of apartments booked/ sold Write or Annex the stage of construction of the booked/ sold apartments in folder C
OFFICE42STRUCTURE COMPLETED


30-11-2011
30-11-2014
30-09-2022
31-01-2020
0
30-09-2022


PlotsBooked/soldStage of handing over the possession (Write or Annex details)
PLOT00
31-01-2020
0
30-09-2022


0
0
221
44
0





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0

ParticularsYear-2019
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments80.20120.30120.30
Shops000
Plots000

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments200.51200.51304.78336.86
Shops0000
Plots0000

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments336.86336.86288.74256.65
Shops0000
Plots0000

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments80.2080.2029.82
Shops000
Plots000




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2018
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0
External fire fighting0
Solid Waste Management System0
VD Flooring and other activities in basement0

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System014.8317.8017.80
Sewerage treatment & garbage disposal07.4111.8611.86
Electricity Supply System014.8359.3474.18
Storm Water Drainage02.968.908.90
Parks and Playgrounds7.417.417.417.41
Clubhouse/community centres0000
Shopping area0000
Other0000
VD Flooring and other activities in basement7.417.417.417.41
External fire fighting14.8322.25

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements10.38103814.838.90
Water Supply System17.8020.7700
Sewerage treatment & garbage disposal11.868.9000
Electricity Supply System74.1874.1800
Storm Water Drainage8.907.4100
Parks and Playgrounds14.8314.8322.2522.25
Clubhouse/community centres0000
Shopping area0000
Other0000
External fire fighting22.2529.67
VD Flooring and other activities in basement7.4114.8322.2522.25

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements000
Water Supply System000
Sewerage treatment & garbage disposal000
Electricity Supply System000
Storm Water Drainage000
Parks and Playgrounds000
Clubhouse/community centres000
Shopping area000
Other14.8322.2522.25
Solid Waste Management System7.41












Particulars Remarks, if any
i. No. of Flats/Apartments constructed111
ii. No. of Flats/ Apartments booked42
iii. Total amount sale value of booked Flats, on the date of application/end of last quarter6654.22 Lakhs
iv. Total amount received from the allottees (booked Flats), on the date of application/end of last quarter5678.71 Lakhs
v. Balance amount to be received from the allottees (booked Flats, after completion), on the date of application/end of last quarter975.52 Lakhs
vi. Balance amount due and recoverable from the allottees (booked Flats) as on the date of application /end of last quarter214.38 Lakhs
vii. Amount invested in the project upto the date of application0 Lakhs
Land cost (If any)3506 Lakhs
Apartments4514 Lakhs
Infrastructure0 Lakhs
EDC/ Taxes Etc.320 Lakhs
viii. Balance cost to be incurred for completion of the project and delivery of possession5403 Lakhs
(a) In respect of existing allottees0 Lakhs
(b) In respect of rest of the project0 Lakhs
ix. The amount of loan raised from the banks/ financial institutions/ private persons against the project
Annex detail of the securities furnished to the banks/ financial institutions against the aforesaid loans in folder C
495 Lakhs
x. Total liabilities against the project up-to-date. (Annex details in folder C) 495 Lakhs



Particulars Estimated expenditure planned to be incurred as per service plan estimates or the project report. (In Lakhs)Actual expenditure incurred upto the date of application. (In Lakhs)
I. INTERNAL ROADS AND PAVEMENTS00
II. WATER SUPPLY SYSTEM00
III. STORM WATER DRAINAGE00
IV. ELECTRICITY SUPPLY SYSTEM00
V. SEWAGE TREATMENT & GARBAGE DISPOSAL00
VI. CLUB HOUSE/COMMUNITY CENTRE00
VII. SCHOOL00
VIII. ANY OTHER00
IX. SOLID WASTE COLLECTION & MGMT SYSTEM00
X. CLUBHOUSE00
XI. NEIGHBOURHOOD SHOPPING00
XII. GREEN AREAS,PARKS,PLAYGROUNDS ETC.00
XIII. COVERED PARKING00
XIV. OPEN PARKING00
XV. GARAGES00
XVI. SECURITY SYSTEM00
XVII. OTHER FACILITIES AS PER PROJECT REPORT00









Yes
Yes
ORIENTAL BANK OF COMMERCE, SECTOR-16, DAULTABAD, FARIDABAD
01981131004435
ORBC0100198
110022060
0198
Directors of the Company











Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes


No
No
No
No
No
No
No
Yes
Statutory Approvals Statutory Approvals StatusDate
I. BUILDING PLANALREADY BEEN OBTAINED11-10-2018








Yes


Yes


Yes







RPS CENTRAL, FARIDABAD
0.399
74
0
74
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
9360376
Cost of the apartments6900315
Cost of the infrastructure18600
Others costs6100


1828.06 Lakhs
603.96 Lakhs
300 Lakhs
100 Lakhs
No
31-10-2018
30-09-2019










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEINTERNAL FLOORING OF UNITS : TO BE DONE BY CUSTOMER AS PER PREFERENCE & REQUIREMENT. LOBBY/CORRIDORS/STAIRS: KOTA STONE/VITRIFIED TILES IN PLEASANT SHADES/COMBINATIONS
2WALL FINISHING DETAILSINTERNAL WALLS OF UNITS: TO BE DONE BY CUSTOMER AS PER PREFERENCE & REQUIREMENT. LOBBY/CORRIDORS/STAIRS: PLASTER WITH PLEASANT SHADES OF DISTEMPER
3KITCHEN DETAILSNA
4BATHROOM FITTINGSCHINAWARE & CHROME PLATED(CP) FITTINGS
5WOOD WORK ETCNA
6DOORS AND WINDOS FRAMESFRAMELESS/UPVC/ALUMINUM FRAME
7GLASS WORKGLAZED SHUTTERS/FIXED GLASS FOR INTERNAL DOORS & WINDOWS
8ELECTRIC FITTINGSISI MARKED LIGHTING FIXTURES IN COMMON AREA
9CONDUCTING AND WIRING DETAILSPVC CONDUITS FOR CONCEALED WIRING AND MS CONDUITS FOR EXPOSED WIRING WITH ISI MARKED CABLES AS PER REQUIREMENT
10CUPBOARD DETAILSNA
11WATER STORAGEUNDER GROUND AND OVER HEAD RCC TANKS
12LIFT DETAILSPASSENGER LIFTS OF SUITABLE/APPROVED CAPACITY
13EXTERNAL GLAZINGSSTRUCTURE GLAZING WITH TOUGHENED GLASS IN EXTERNAL FAçADE
13.1WINDOWS/GLAZINGSSTRIP WINDOWS WITH TOUGHENED GLASS
14DOORSGLAZED DOORS OF SPECIFIED SIZE
14.1MAIN DOORSGLAZED DOORS OF SPECIFIED SIZE
14.2INTERNAL DOORSGLAZED DOORS OF SPECIFIED SIZE
15AIR CONDITIONINGCENTRALIZED AIR CONDITIONING THROUGH DUCTING/ SPLIT AIR CONDITIONERS
16ELECTRICAL FITTINGSISI MARKED LIGHTING FIXTURES IN COMMON AREA
17CNG PIPE LINENA
18PROVISION OF WIFI AND BROADBAND FACILITYTO BE PROVIDED
19EXTERNAL FINISHING/COLOUR SCHEMEEXTERNAL PAINT IN PLEASANT SHADE FOR AREAS OTHER THAN GLASS AND STONE CLADDING
20INTERNAL FINISHINGPLASTER WITH PLEASANT SHADES OF DISTEMPER ON WALLS AND KOTA STONE/VITRIFIED TILES IN PLEASANT SHADES/COMBINATIONS IN FLOORING
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORNA
1 . 2 WALLSNA
1 . 3 CEILINGNA
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORNA
2 . 2 WALLSNA
2 . 3 CEILINGNA
2 . 4 MODULAR WARDROBESNA
3 . MASTER TOILET
3 . 1 FLOORNA
3 . 2 WALLSNA
3 . 3 CEILINGNA
3 . 4 COUNTERSNA
3 . 5 SANITARY WARE/CP FITTINGSNA
3 . 6 FITTING/FIXTURESNA
4 . BED ROOMS
4 . 1 FLOORNA
4 . 2 WALLSNA
4 . 3 CEILINGNA
4 . 4 WARDROBESNA
5 . TOILET
5 . 1 FLOORNA
5 . 2 WALLSNA
5 . 3 CEILINGNA
5 . 4 COUNTERSNA
5 . 5 SANITARY WARE/CP FITTINGSNA
5 . 6 FIXTURESNA
6 . KITCHEN
6 . 1 FLOORNA
6 . 2 WALLSNA
6 . 3 CEILINGNA
6 . 4 COUNTERSNA
6 . 5 FIXTURESNA
6 . 6 KITCHEN APPLIANCESNA
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORNA
7 . 2 WALLS & CEILINGNA
7 . 3 TOILETNA
7 . 4 BALCONYNA
8 . SIT-OUTS
8 . 1 FLOORNA
8 . 2 WALLS & CEILINGNA
8 . 3 RAILINGSNA
8 . 4 FIXTURESNA












Sr. No.Document DescriptionDate of Document UploadView Document
1COPY OF LICENSE ALONG WITH SCHEDULE OF LAND23-10-2018 View Document
2ZONING PLAN23-10-2018 View Document
3IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN23-10-2018 View Document
4NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT23-10-2018 View Document
5CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT23-10-2018 View Document
6DEMARCATION PLAN23-10-2018 View Document
7A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS23-10-2018 View Document
8IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN23-10-2018 View Document