HRERA GurugramTemp Project Id : RERA-GRG-PROJ-650-2020
Submission Date : 14-05-2020 05:42:21 PM
Applicant Type : Company
Project Type: NEW




ADVANCE INDIA PROJECTS LIMITED
THE MASTERPIECE, GOLF COURSE ROAD, SECTOR - 54, GURUGRAM - 122002, HARYANA, INDIA
9211160000
8800563717 (Number Shared by Promoter in Public)
rera-haryana@aipl.com
https://aipl.com/aipl-joy-gallery-gurugram
XXXX859J
U45209HR1997PLC080240
 
 


 
 


 
 


 
 


 
 


 
 


 
 







AIPL JOY GALLERY
SECTOR 66
BADSHAHPUR ST
GURUGRAM
9211160000
8800563717 (Number Shared by Promoter in Public)
rera-haryana@aipl.com
TO BE UPDATED
9211160000
8800563717 (Number Shared by Promoter in Public)
rera-haryana@aipl.com








As per sub-rule(2) of rule 3 of the Haryana Real Estate (Regulation and Development) Rules,2017, the fee for registration of the project as has been calculated as follows:
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------
2. The aforesaid fees is hereby deposited vide following Drafts/ Banker’s Cheques:-

Sr No.Draft/Cheque No.Draft DateAmountPayee BankPayable To
1363711-03-2020178791HDFC BANK LTD.HRERA Gurugram
2363611-03-20204486268HDFC BANK LTD.HRERA Gurugram







4.418 (Acre)
350
350
4.418 (Acre)
License no. 197 of 2008 dated 05.12.2008
No
Address     10TH FLOOR, EROS CORPORATE TOWER, NEHRU PLACE, NEW DELHI - 110019
Annexure-B- DEVELOPER
AFTER GRANT OF LICENSE
Yes
COLLABORATION AGREEMENT PROVIDED IN FOLDER B
No
Yes
Yes







66125.47 Lakhs
7547.30 Lakhs
31681.91 Lakhs
5356.13 Lakhs
21540.13 Lakhs




Sr. No.Land area under usageArea of land (Square Meters)
1PLOTS TO BE SOLD8491.797
2LAND AREA TO BE USED FOR CONSTRUCTION OF APARTMENTS0
3CONSTRUCTION OF ROADS0
4PAVEMENTS5260.936
5PARKS AND PLAYGROUNDS831.148
6GREEN BELTS0
7VEHICLE PARKINGS50
8ELECTRICITY SUB-STATION38.01
9CLUB HOUSE0
10SEWAGE AND SOLID WASTE TREATMENT FACILITY0
11AREA TO BE LEFT FOR TRANSFERRING TO THE GOVERNMENT FOR COMMUNITY SERVICES0
12ANY OTHER3207.119
Total17879.01




FacilityExternal/ connecting service to be provided by (Name the agency)Whether Approval taken from the agency concerned. Yes/No (Annex details in folder C)
ROADSGMDANo
WATER SUPPLYGMDANo
ELECTRICITYDHBVNYes
SEWAGE DISPOSALGMDANo
STORM WATER DRAINAGEGMDANo




Sr. No.Name of the facilityEstimated cost (In Lakhs)(Within the project area only)Remarks: Yet to be prepared / Submitted to HUDA, Town & Country Planning Department/ as per project report etc. (Annex relevant documents showing costing details etc. in folder C)
1INTERNAL ROADS AND PAVEMENTS263.71AS PER PROJECT REPORT
2WATER SUPPLY SYSTEM379.27AS PER PROJECT REPORT
3STORM WATER DRAINAGE216.72AS PER PROJECT REPORT
4ELECTRICITY SUPPLY SYSTEM1151.06AS PER PROJECT REPORT
5SEWAGE TREATMENT & GARBAGE DISPOSAL162.54AS PER PROJECT REPORT
6STREET LIGHTING200.00AS PER PROJECT REPORT
7SECURITY AND FIRE FIGHTING1023.90AS PER PROJECT REPORT
8PLAYGROUNDS AND PARKS0AS PER PROJECT REPORT
9CLUB HOUSE/COMMUNITY CENTRE0AS PER PROJECT REPORT
10SHOPPING AREA0AS PER PROJECT REPORT
11RENEWABLE ENERGY SYSTEM0AS PER PROJECT REPORT
12SCHOOL0AS PER PROJECT REPORT
13HOSPITAL/DISPENSARY0AS PER PROJECT REPORT
14ANY OTHER0YET TO BE PREPARED
15STP162.54AS PER PROJECT REPORT
16UNDERGROUND WATER TANK54.18AS PER PROJECT REPORT
17RAIN WATER HARVESTING108.36AS PER PROJECT REPORT
18ELECTRICAL SUB STATION1633.84AS PER PROJECT REPORT


14-05-2020 (date)
14-05-2020 (date)
01-09-2020
30-06-2025
Plot Area(In Square Meter)Number of plots in the project
00


TypeCarpet area(In Square Meter)Number of apartmentsNumber of towers
Apartment/Shops/Other Buildings51404.294011





Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Apartments0
Shops7549.90
Plots0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2020
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
EDC216.05445.00227.70221.82
Land Cost172.90888.6600
IDC0160.77152.120
Construction Cost490.580163.53457.87

ParticularsYear-2021
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
Land Cost00172.890
IDC0000
Construction Cost425.17457.87523.28457.87
EDC194.87211.46206.05200.40

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
EDC0189.81127.090
IDC0000
Land Cost0000
Construction Cost1834.03574.83480.83760.70

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
IDC0000
Construction Cost2272.812115.581990.092180.89
Land Cost0000
EDC0000

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
IDC0000
Land Cost0000
Construction Cost2813.992924.223169.023802.15
EDC0000

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000
IDC00
EDC00
Land Cost00
Construction Cost03426.98

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0000
Shops0000
Plots0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Apartments0
Shops0
Plots0




Expenditure incurred till the date of application (In Lakhs)

ParticularsExpenditure
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0

Expenditure to be made in each quarter (In Lakhs)

ParticularsYear-2022
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements13.2000
Water Supply System19.0000
Sewerage treatment & garbage disposal8.1000
Electricity Supply System57.6000
Storm Water Drainage10.8000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Rain water harvesting5.4
Street lighting10.0
Underground water tank2.7
STP8.1
Electrical Sub station81.7
Security and Fire Fighting51.2

ParticularsYear-2023
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements26.413.226.426.4
Water Supply System37.91937.937.9
Sewerage treatment & garbage disposal16.38.116.316.3
Electricity Supply System115.157.6115.1115.1
Storm Water Drainage21.710.821.721.7
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Street lighting20.0102020
Security and Fire Fighting102.451.2102.4102.4
Rain water harvesting10.85.410.810.8
Electrical Sub station163.481.7163.4163.4
STP16.38.116.316.3
Underground water tank5.42.75.45.4

ParticularsYear-2024
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements32.326.432.332.3
Water Supply System46.437.946.446.4
Sewerage treatment & garbage disposal19.916.319.919.9
Electricity Supply System140.9115.1140.9140.9
Storm Water Drainage26.521.726.526.5
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
Rain water harvesting13.310.813.313.3
Street lighting24.52024.524.5
Underground water tank6.65.46.66.6
STP19.916.319.919.9
Electrical Sub station200.0163.4200200
Security and Fire Fighting125.3102.4125.3125.3

ParticularsYear-2025
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements032.300
Water Supply System046.400
Sewerage treatment & garbage disposal019.900
Electricity Supply System0140.900
Storm Water Drainage026.500
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000
STP019.900
Underground water tank06.600
Rain water harvesting013.300
Electrical Sub station020000
Street lighting024.500
Security and Fire Fighting0125.300

ParticularsYear-2026
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2027
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0000
Water Supply System0000
Sewerage treatment & garbage disposal0000
Electricity Supply System0000
Storm Water Drainage0000
Parks and Playgrounds0000
Clubhouse/community centres0000
Shopping area0000
Other0000

ParticularsYear-2028
Jan-MarApr-JuneJuly-SepOct-Dec
Roads & Pavements0
Water Supply System0
Sewerage treatment & garbage disposal0
Electricity Supply System0
Storm Water Drainage0
Parks and Playgrounds0
Clubhouse/community centres0
Shopping area0
Other0












Yes
No
KOTAK MAHINDRA BANK LIMITED, GROUND FLOOR, BLOCK - B, VATIKA ATRIUM, SECTOR 53, GOLF COURSE ROAD, GURGAON 122001, HARYANA
5213088449
KKBK0000289
110485043
0000289
Mr. Daljeet Singh, Mr. Harinder Singh and Mr. Gurdeep Singh
Yes











Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes


No
No
No
No
No
No
No
No
Statutory Approvals Statutory Approvals StatusDate
I. AIRPORT HEIGHT CLEARANCE ALREADY BEEN OBTAINED18-11-2019
II. FOREST NOC ALREADY BEEN OBTAINED22-03-2019
III. BUILDING PLAN - BR(III)ALREADY BEEN OBTAINED14-05-2020








Yes


Yes


As per Agreement







AIPL JOY CENTRAL, SECTOR 65, GURUGRAM
3.98
399
0
367
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
57112.87017973.05
Cost of the apartments18986.5805136.72
Cost of the infrastructure3379.8500
Others costs34747012836.32


34894.46 Lakhs
21457.21 Lakhs
25000 Lakhs
10050 Lakhs
Yes
31-12-2022
31-12-2022




AIPL JOY SQUARE, SECTOR 65-A, GURUGRAM
2.838
577
0
406
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
18217.3806112.69
Cost of the apartments11085.9703474.23
Cost of the infrastructure1314.620418.73
Others costs5816.7802219.73


9425.68 Lakhs
9632.21 Lakhs
0 Lakhs
0 Lakhs
No
31-12-2022
31-12-2022




AIPL JOY STREET, SECTOR 66, GURUGRAM
3.95
634
0
602
0
Initially estimated cost (In Lakhs)Revised cost (In Lakhs)Expenditure incurred upto the date of application (In Lakhs)
Total cost of the project
(Other than cost of land)
30736.90019988.94
Cost of the apartments13506.3508171.49
Cost of the infrastructure1704.6701373.44
Others costs15525.88010444.01


43964.62 Lakhs
13970.55 Lakhs
0 Lakhs
0 Lakhs
Yes
31-12-2020
31-12-2020










SPECIFICATION OF CONSTRUCTION
Specification of apartments and other buildings including the following:
1FLOORING DETAILS OF VARIOUS PARTS OF HOUSEN/A
2WALL FINISHING DETAILSN/A
3KITCHEN DETAILSN/A
4BATHROOM FITTINGSN/A
5WOOD WORK ETCN/A
6DOORS AND WINDOS FRAMESN/A
7GLASS WORKN/A
8ELECTRIC FITTINGSN/A
9CONDUCTING AND WIRING DETAILSCONCEALED CONDUITING
10CUPBOARD DETAILSN/A
11WATER STORAGEN/A
12LIFT DETAILSRETAIL – 3 PASSENGER LIFTS, 2 SERVICE LIFTS OFFICE – 5 LOW RISE LIFTS, 5 HIGH RISE LIFTS, 1 SERVICE LIFT
13EXTERNAL GLAZINGSN/A
13.1WINDOWS/GLAZINGSOFFICES - GLAZING WITH OPENABLE WINDOWS AS REQUIRED NO SHOP FRONT GLAZING
14DOORSN/A
14.1MAIN DOORSN/A
14.2INTERNAL DOORSN/A
15AIR CONDITIONING1. PROVISION OF AIR-CONDITIONING FOR SHOPS 2. CENTRALIZED AIR CONDITIONING FOR OFFICES
16ELECTRICAL FITTINGSN/A
17CNG PIPE LINEN/A
18PROVISION OF WIFI AND BROADBAND FACILITYN/A
19EXTERNAL FINISHING/COLOUR SCHEMEOFFICE AND RETAIL OUTER FAçADE ONLY - GLAZING/STONE/PAINT NO SHOP FRONT GLAZING
20INTERNAL FINISHINGN/A
SPECIFICATION UNIT WISE
1 . LIVING/DINING/FOYER/FAMILY LOUNGE
1 . 1 FLOORN/A
1 . 2 WALLSN/A
1 . 3 CEILINGN/A
2 . MASTER BEDROOM/DRESSROOM
2 . 1 FLOORN/A
2 . 2 WALLSN/A
2 . 3 CEILINGN/A
2 . 4 MODULAR WARDROBESN/A
3 . MASTER TOILET
3 . 1 FLOORN/A
3 . 2 WALLSN/A
3 . 3 CEILINGN/A
3 . 4 COUNTERSN/A
3 . 5 SANITARY WARE/CP FITTINGSN/A
3 . 6 FITTING/FIXTURESN/A
4 . BED ROOMS
4 . 1 FLOORN/A
4 . 2 WALLSN/A
4 . 3 CEILINGN/A
4 . 4 WARDROBESN/A
5 . TOILET
5 . 1 FLOORN/A
5 . 2 WALLSN/A
5 . 3 CEILINGN/A
5 . 4 COUNTERSN/A
5 . 5 SANITARY WARE/CP FITTINGSN/A
5 . 6 FIXTURESN/A
6 . KITCHEN
6 . 1 FLOORN/A
6 . 2 WALLSN/A
6 . 3 CEILINGN/A
6 . 4 COUNTERSN/A
6 . 5 FIXTURESN/A
6 . 6 KITCHEN APPLIANCESN/A
7 . UTILITY ROOMS/UTILITY BALCONY/TOILET
7 . 1 FLOORN/A
7 . 2 WALLS & CEILINGN/A
7 . 3 TOILETN/A
7 . 4 BALCONYN/A
8 . SIT-OUTS
8 . 1 FLOORN/A
8 . 2 WALLS & CEILINGN/A
8 . 3 RAILINGSN/A
8 . 4 FIXTURESN/A












Sr. No.Document DescriptionDate of Document UploadView Document
1IN CASE OF GROUP HOUSING/ COMMERCIAL SITES, A COPY OF THE APPROVED SITE PLAN14-04-2020 View Document
2CERTIFICATE FROM A CHARTERED ACCOUNTANT CERTIFYING THAT THE INFORMSTION PROVIDED BY THE APPLICANT IN FORM REP-1-C-X IS CORRECT AS PER THE BOOKS OF ACCOUNTS/ BALANCE SHEET OF THE APPLICANT17-08-2020 View Document
3DECLARATION SUPPORTED BY AFFIDAVIT DULY SIGNED BY THE PROMOTER TO BE ENCLOSED.14-04-2020 View Document
4IN CASE OF PLOTTED COLONY, THE LATEST LAYOUT PLAN14-04-2020 View Document
5ANNEXURE B138, B139, B140, B141 - DETAILS OF MEP17-08-2020 ------
6DRWG 31A 19TH, 24TH, 26TH FLOOR PLAN17-08-2020 ------
7NON DEFAULT CERTIFICATE FROM A CHARTERED ACCOUNTANT17-08-2020 View Document
8A COMPLETE SET OF THE LAST APPROVED BUILDING PLANS14-05-2020 View Document
9COPY OF LICENSE ALONG WITH SCHEDULE OF LAND14-04-2020 View Document
10JAMABANDI17-08-2020 ------
11AIPL ADDRESS PROOF (INC 22)17-08-2020 ------
12DRWG 17C 2ND FLOOR PLAN (CARPET AREA)17-08-2020 ------
13BUILDING PLAN APPROVAL LETTER (BR-III)17-08-2020 ------
14REP-II17-08-2020 ------
15DRWG 18C 3RD FLOOR PLAN17-08-2020 ------
16ANNUAL REPORT OF 31ST MARCH 201817-08-2020 ------
17GST CERTIFICATE17-08-2020 ------
18WEST ELEVATION17-08-2020 ------
19DRWG 15C. GROUND FLOOR PLAN (CARPET AREA)17-08-2020 ------
20ANNEXURE B142, B143, B144, B145 - DETAILS OF PROOF CONSULTANT17-08-2020 ------
21ZONING PLAN17-08-2020 View Document
22SECTION D17-08-2020 ------
23AFFIDAVIT OF PROMOTER REGARDING ARRANGEMENT WITH THE BANK OF MASTER ACCOUNT17-08-2020 ------
24SOUTH ELEVATION17-08-2020 ------
25SECTION -A17-08-2020 ------
26FOREST NOC17-08-2020 ------
27LOI17-08-2020 ------
28PROJECT REPORT ALONG WITH BROCHURE17-08-2020 ------
29LAND TITLE SEARCH REPORT17-08-2020 ------
30AKSHIJRA17-08-2020 ------
31SECTION C17-08-2020 ------
32NORTH ELEVATION17-08-2020 ------
33AIPL TAN17-08-2020 ------
34ENVIRONMENT CLEARANCE17-08-2020 ------
35AGREEMENT TO SALE17-08-2020 ------
36DIRECTORS REPORT TILL 31ST MARCH 201817-08-2020 ------
37AIPL PAN CARD17-08-2020 ------
38ALLOTMENT LETTER17-08-2020 ------
39DEVELOPMENT AGREEMENT17-08-2020 ------
40AIRPORT HEIGHT CLEARANCE17-08-2020 ------
41ANNEXURE B130, B131, B132, B133 - DETAILS OF ARCHITECT17-08-2020 ------
42ANNEXURE B146, 147, B148 - DETAILS OF CHARTERED ACCOUNTANT17-08-2020 ------
43DRWG 16C 1ST FLOOR PLAN (CARPET AREA)17-08-2020 ------
44MUTATION17-08-2020 ------
45ANNEXURE B150, B151, B152, B153 - REGISTERED AGENTS LIST17-08-2020 ------
46SALE DEED17-08-2020 ------
47LICENSE WITH RENEWAL COPIES17-08-2020 ------
48DEMARCATION PLAN17-08-2020 View Document
49DETAILS OF AUTHORIZED SIGNATORY17-08-2020 ------
50APPROVED ZONING PLAN DRAWING17-08-2020 ------
51BIP17-08-2020 ------
52TREE CUTTING PERMISSION17-08-2020 ------
53ANNEXURE B134, B135, B136, B137 - DETAILS OF STRUCTURAL ENGINEER17-08-2020 ------
54SECTION B17-08-2020 ------
55DEMAND DRAFT FOR REGISTRATION & PROCESSING FEE (ACKNOWLEDGMENT COPY)17-08-2020 ------
56DETAILS OF PROJECT PROPONENT17-08-2020 ------
57SITE PLAN17-08-2020 ------
58ANNUAL REPORT OF 31ST MARCH 201717-08-2020 ------
59ANNUAL REPORT OF 31ST MARCH 201917-08-2020 ------
60FINAL SUPER IMPOSED DEMARCATION PLAN ON SITE PLAN17-08-2020 ------
61EAST ELEVATION17-08-2020 ------
62DRWG 24A 10TH FLOOR PLAN18-08-2020 ------
63DRWG 25A 11TH FLOOR PLAN18-08-2020 ------
64DRWG 19A. 4TH FLOOR PLAN18-08-2020 ------
65DRWG 21A. 6TH, 14TH FLOOR PLAN18-08-2020 ------
66DRWG 22A 8TH FLOOR PLAN18-08-2020 ------
67DRWG 26A 12TH FLOOR PLAN18-08-2020 ------
68DRWG 27A 15TH FLOOR PLAN18-08-2020 ------
69DRWG 28A 16TH FLOOR PLAN18-08-2020 ------
70DRWG 29A 17TH FLOOR PLAN18-08-2020 ------
71DRWG 30A 18TH FLOOR PLAN18-08-2020 ------
72DRWG 32A 20TH, 21ST FLOOR PLAN18-08-2020 ------
73DRWG 33A 22ND FLOOR PLAN18-08-2020 ------
74DRWG 34A 25TH FLOOR PLAN18-08-2020 ------
75DRWG 35 TERRACE, MACHINE ROOM AND ROOF PLAN18-08-2020 ------
76DRWG 10A BASEMENT -01 PLAN18-08-2020 ------
77DRWG 14A BASEMENT -05 PLAN18-08-2020 ------
78 DRWG11A BASEMENT -02 PLAN18-08-2020 ------
79DRWG12A BASEMENT -03 PLAN18-08-2020 ------
80DRWG13A BASEMENT -04 PLAN18-08-2020 ------